Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Calvin Giordano & Assoc.
CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) PreparedFor:CITY OF SUNNY ISLES BEACHAttn: City Clerk18070 Collins Avenue, 4th FloorSunny Isles Beach, FL 33160 RFQ NO.18-08-01 Due Date/Time:SEPTEMBER 4, 20182:30 PM Q#Electronic-11 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) CALVIN, GIORDANO & ASSOCIATES, INC. 1800 ELLER DRIVE, SUITE 600 FORT LAUDERDALE, FL 333316 T: 954.921.7781 F: 954.921.8807 CURT A. KEYSER, PE PROJECT MANAGER CKEYSER@CGASOLUTIONS.COM P: 954.766.2752 DUE: SEPTEMBER 4, 2018, 2:30 PM REQUEST FOR QUALIFICATIONS NO. 18-08-01CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) 1 1 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 10 9 8 7 6 5 4 3 2 1 TITLE PAGE............................................1 TABLE OF CONTENTS .........................2 COVER LETTER AND EXECUTIVE SUMMARY ............................................4 PROJECT APPROACH AND UNDERSTANDING ..............................9 QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL .........14 Financial Statements ....................35 Licenses and Certifications .....160 SF330 ..................................................88 Project Organization Chart .....172 Projects ...........................................175 FIRM REFERENCES AND SIMILAR WORK COMPLETED ........................177 CORPORATE STANDING AND AUTHORIZED SIGNATORY ............184 VARIATIONS/EXCEPTIONS ...........186 LITIGATION STATEMENT ...............188 FORMS AND ATTACHMENTS .......190 2 TABLE OF CONTENTS 2 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 3 COVER LETTER AND EXECUTIVE SUMMARY 3 4 5 6 7 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) PROJECT APPROACH AND UNDERSTANDING 4 8 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 4. PROJECT APPROACH AND UNDERSTANDING Calvin, Giordano & Associates, Inc. (CGA) will have the lead role and assign in-house staff for Civil Engineering, Lighting, Landscape Architecture, Construction Administration, Public Information, and Surveying Services. US Utility Potholing & Air Excavation (USUPAE) will supplement the team with subsurface utility engineering and Nutting Engineers of Florida, Inc. (NUTTING) for Geotechnical Investigation and testing. The main objective of this project is to gather and collect data of the existing underground and overhead utilities including domestic water, sanitary sewer, storm sewer, natural gas, power, communications, entertainment cable systems, and street lighting in order to coordinate a new design for undergrounding their system to the public utility service providers. In addition, enhancements to the Golden Shore’s roadway system is desired. This includes new ADA compliant sidewalks from the entrances of Collins to Atlantic Boulevard, and along the east side of Atlantic Boulevard with new landscape, and new street lighting. These improvements will result in reconstruction of residential driveways and restoration of irrigation, existing landscape. The CGA team’s project approach includes the following items with additional detail on each process below: 1. Kick-Off Meetings 2. Data Collection 3. Preliminary Design 4. Utility Coordination/Conflict Resolution 5. Easement Acquisition 6. Construction Documents 7. Construction Administration and Project Close-out KICKOFF MEETING Upon award of the project, CGA will meet with City staff to clarify specific requirements of the project scope, and define the project budget. The project manager (PM) will prepare and submit a project schedule to the City. The detailed scope and schedule will be provided to team members at the internal project “Kick-off Meeting.” The primary purpose of the “Kick-off Meeting” is to: 1. Clarify the quality control/quality assurance requirements to be followed; 2. Discuss the critical design elements affecting the overall schedule; and 3. Review methods to ensure effective communication is maintained throughout the design process. DATA COLLECTION CGA will then begin one of the most critical aspects of this underground project, the inventory and data collection process, by researching and obtaining available documents such as records and as-built information for the project limits. The goal of this process is to create a single point reference and base file of all existing utility information in the project limits. Information and insight from City staff regarding existing utilities will supplement the GIS and as-built information received through the data gathering process. A site visit will allow the task leaders to identify key components and review existing conditions to identify any special needs area for the surveying crew or city staff. The utility coordination process continues by sending out utility information request letters to all utility agency owners (UAO) within the project limits as determined by the 811 design ticket information. The utility matrix is created to track utility request letters, responses, and follow-ups and houses each utility agencies contact information. This matrix is a live document and is updated throughout the design process. As utility information is received from each UAO, it is logged in the utility matrix and input into the utility base file in AutoCAD. This file will serve as the “as-built” utility base file for design and coordination of the location of proposed improvements. Coordination with the ongoing SR A1A project, and any upcoming developments on Atlantic Boulevard or residential upgrades in the neighborhood would also occur during this phase. 9 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) In conjunction with inventory and data collection task, the design survey will begin. The surveying task will show the platted right-of-way lines, platted easements, and adjacent adjoining recorded plats within the designated corridor. The survey map will also depict the above-ground improvements within the project limits, with horizontal locations and vertical elevations being provided for required items such as edge-of-pavement, sidewalks, driveways, access points, and visible above-ground utilities. Additionally, the locations of the private electric service connections will be surveyed in order to prepare for relocating the services from the back-yard to the front yards. Since easements will be necessary in private property to accommodate utility equipment, above ground improvements within 10’ of the right-of-way as well as projected path from the electrical service meter to the right-of-way will also be captured by the survey crew. A tree survey will be performed in conjunction with the landscape architecture department to properly identify species, size and condition of trees within the project limits. Survey data will be referenced vertically to North American Vertical Datum 1988 (NAVD88) and horizontally to Florida State Plane Coordinates, North American Datum 83/90 (NAD 83/90). The survey will be prepared in accordance with the standards as set forth by Chapter 5J-17 of the Florida Administrative Code, pursuant to Florida Statues Chapter 472.027. Once all the information has been assembled through the inventory and data collection phase, preliminary design begins. Another site visit to the neighborhood to confirm utility and survey information, as well as familiarizing the project team with design elements will occur. These site assessments are critical during this analysis phase as well as throughout the life of the design project. PRELIMINARY DESIGN The preparation of design drawings can begin once the inventory and data collection phase has been completed. During the preliminary design, regular meetings with the UAO's will ensure coordination of their individual designs from schematic to conceptual layouts. These regular meetings will continue while developing construction plans with final design layouts that work for the City and neighborhood as well as for each provider. These plans are utilized to finalize the coordination of locations of utilities and begin the discussion and review of required easements. The plans are also utilized to begin the pre-application process with the review and permitting agencies as well as with any relevant stakeholders. This process involves multiple meetings with the City staff to ensure the project is moving in the intended direction and on schedule. The following is a general description of additional tasks separated by discipline that are part of this design process. Civil/Roadway/Drainage Engineering The improvements include gathering all existing utilities as mentioned above and converting overhead utilities to underground trenches. Where possible, placing the combined utility trenches in, or as close to the swale areas as possible will minimize pavement/concrete reconstruction when performing maintenance in the future and allow for better maintenance of traffic during construction through the neighborhood. The installation of the utilities underground will result in reconstruction/restoration to pavement, concrete sidewalks/curbs, pavement markings and signage, and landscape allowing for an opportunity to upgrade and enhance the neighborhood. Diligent coordination during design to place multiple utilities in the same trench will minimize the overall impacts. The CGA team will analyze the option of directional drilling for some utilities in specific areas in order to further reduce impacts, where possible. Once the contractor has installed the conduit and pads, the utility contractors will need to pull the wires and set transformers. During this time, CGA’s construction manager will ensure the contractor is coordinating with the UAO’s and keep the City updated on the status in order to keep the residents informed of disturbances. The CGA team will review the existing drainage system and familiarize ourselves with the pump station upgrades in order to ensure any necessary system upgrades to the catch basins or collection system are included in the project. Roadways and swales that are being disturbed by trench installation will be reconstructed with proper slopes to aid in better drainage flow while taking into consideration harmonization with the existing driveways. 10 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Traffic Control/Maintenance of Traffic during construction of the improvements is a critical scheduling and design component. Coordination with the City for local event schedules, high volume pedestrian routes and times, and emergency service providers as well as continued communication with the residents will allow for a smoother construction period. CGA has staff with Advanced Work Zone Traffic Control certifications as required by Florida Department of Transportation (FDOT) to prepare the MOT plan. CGA staff will ensure the City staff have reviewed and approved the MOT plan as well as any construction phasing requirements in the bid documents, and will assist the City and/or contractor with the public notifications. Lighting The Electrical Engineering Division performs services as the prime/project manager and where the division is a member of a design team, such as this contract. CGA has completed lighting projects for roadway corridors, private parking lots, neighborhoods, pathways, and parks. The lighting upgrades for this project will require moving all light poles from the rear yards to the street-side front yard, running new electrical conduit, and review of any information or staff history noting problem areas that need extra attending. The City has stated that the proposed lighting will be decorative to match the surrounding neighborhoods. The new lighting system will require coordination with the UAO’s to share trenches with street lighting and coordinate service locations. CGA has experience coordinating with FPL for services points, upgrades, such as relocating overhead lines to underground, or relocations of light poles, where necessary. BEFORE AFTER BEFORE AFTER 11 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Landscape Architecture The Landscape Architecture Department at CGA will inventory the existing site conditions, analyze the effective areas due to the utility modifications, evaluate the opportunities to provide landscaping, and prepare detailed landscape and irrigation plans and specifications for the project. In developing each design, we take special care to evaluate green design and sustainable alternatives and to provide specialized research on the site’s conditions, hydrology, existing vegetation, and site characteristics. We will ensure the surface water infrastructure, drainage, utilities, line of clear sight and any other safety considerations are adhered to in order to minimize any potential conflicts that may arise as a result of the proposed construction and improvements. We have experience in implementing landscape strategies and streetscape improvements that foster increased roadway and pedestrian safety, promote good tree and canopy coverage and health, and upgrade community aesthetics. Lastly, we are capable of delivering exceptional landscape solutions in providing landscape improvements that employ the practices of water conservation, through the use of Xeriscape principles, appropriate plant detailing to ensure proper root-growth and preventative infrastructure impacts, as well as fostering sustainable storm-water management practices through the use of landscaped bio-swales, pervious pavement systems, and other strategies. UTILITY COORDINATION/CONFLICT RESOLUTION Early and pro-active communication/coordination with the UAO’s is the most critical element in the process. The coordination effort will focus on early identification, conflict avoidance and planning for utility adjustments and relocations as needed. Some instances may require water or sewer point relocations. CGA, along with USUPAE, our Subsurface Utility Engineering subconsultant, fully understands the commitment and level of effort involved for this task to successfully complete the design process on schedule. Design tickets obtained through Sunshine 811 will identify UAO’s with facilities within the project limits and initial field reviews conducted in an effort to identify potential conflicts. EASEMENT ACQUISITION Once utility trenches and equipment are finalized with each UAO, the PM will have our surveyors begin preparing the sketch and legal descriptions for the easements necessary for equipment in private property. The sketch and legal descriptions of the utility easements will be provided to the appropriate UAO and the City for review. Once the documents are approved they will be provided to the City’s legal department or legal consultant for incorporation in the agreements with the owners. It is our understanding that the City will coordinate with the individual property owners for execution of the easements and any necessary agreements; however, CGA can assist with this public notification/information process if the City desires. All executed easements will be shown in the plans with the recorded OR book/page noted for inclusion in the construction documents. 12 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) CONSTRUCTION DOCUMENTS Preparation of construction documents begins once the preliminary design is agreed upon by the City and the utility evaluation and coordination is well underway. These plans are utilized to make permitting submittals and begin public outreach efforts. During the design process, CGA implements a Quality Assurance/Quality Control (QA/QC) process, which consists of a peer review process where a design group not directly involved with the project will review the plan documents with a fresh perspective. Once the comments have been addressed, the plans are submitted to the firm’s Director of Quality Control and Quality Assurance for final sign off before being released. The multi-disciplined review process also consists of a constructability review by a member of the Construction Engineering and Inspection (CEI) department. This review specifically ensures that the plans make sense from a construction perspective and is intended to minimize potential problems in the field during construction. Once the client and regulatory agencies approve the final design, the construction documents will be finalized and submitted to the City for bidding. The staff assigned to these tasks are outlined and shown in the Organization Chart provided. CONSTRUCTION ADMINISTRATION AND PROJECT CLOSE-OUT The CGA team has experience assisting the local agency in all aspects of bidding including assistance during bidding, attending the pre-bid meeting, creating minutes, addenda preparation, responses to contractor RFI’s and review of the bid package for recommendation of the lowest responsive and responsible bidder. Additionally, CGA has construction administration (CA) services in house. CA Services including Engineering Services during Construction, will provide the necessary support to the City during construction from both the engineer of record as well as a construction engineer and inspector. CGA will undertake the required field inspections, contract administration, project certification and project coordination. We are committed to provide expert field inspection services such as contract negotiation, implementing quality control and assurance programs, contract document review, Shop drawing review, administration of contractor RFIs, observation of field activity to assure construction is completed in accordance with construction documents, payment request recommendation, change order administration, environmental and NPDES monitoring, field report and documentation, As-built record drawing review, Agency/permit closeout documentation and certification, and Contract compliance. The CGA team has the experience and dedication necessary to produce superior results; our emphasis on teamwork and quality control allows us to consistently exceed our clients’ expectations. We are ready and motivated to perform on this contract, and have a high level of availability. Innovative Concepts The keys to success of this project will be keeping the City's Project Manager, homeowners and UAO’s, more specifically FPL, informed with efficient communication, and experienced and responsive/accessible technical staff, and innovative, value-engineering design. Constant and efficient and effective communication and design will be needed and required to convert the overheard utilities to underground facilities. Preparing the construction plans with combined utility trenches in or close to the swale will minimize disruption to the resident’s daily life, and reconstruction of the pavement, concrete and landscape. Installing the utilities in the swale will also allow less disturbance to the resident’s during future maintenance and during construction. The CGA team will also analyze the option of trenchless methods to provide utilities of these services from the right-of-way to the resident’s home in order to minimize disturbance or conflicts with landscape and hardscape features on their property. Another method of providing less disturbance to the resident’s is by phasing the project area into zones or blocks. Areas are energized by blocks as the system is installed and properties are served underground. Once the underground “backbone” of the system is installed, close coordination with each property owner will be required to connect to the new system. This will include a new meter and any electrical work needed to be in compliance with code. Once the proper connections have been performed, FPL will de-energize and remove the overhead lines. These innovative concepts will enhance quality and control cost and schedule for all parties involved. 13 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 5 QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL 14 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 5. QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL FIRM AND ITS CAPABILITIESCalvin, Giordano & Associates, Inc. (CGA) is a well established multi-disciplinary firm with offices located in Fort Lauderdale, Miami-Dade, West Palm Beach, Port St. Lucie, Estero, and Clearwater. For over 80 years, our firm has been providing consulting services to both public and private sector clients. From the beginning, much of our reputation was built on repeat business with clients from the public and private sectors. Our success is reflected in the quality of work we consistently provide and also in the personal approach we take with each client. The winning combination is affirmed by our large number of repeat/long term municipal clients. Because of our diversity, CGA can control the entire process, offering a host of professional services as a one-source partner, or efficiently tackle time-sensitive individual projects, providing customized solutions with handpicked teams of highly experienced professionals. Custom building Exceptional Solutions is the core of our business. CGA strategically provides a broad range of services to meet our clients’ needs. Our professional services include: • Building Code Services • Civil Engineering/Roadway and Highway Design • Coastal Engineering • Code Compliance • Construction Engineering and Inspection (CEI) • Construction Services • Data Technologies and Development • Electrical Engineering • Engineering • Environmental Services • Facilities Management • Geographic Information Systems (GIS) • Governmental Services • Landscape Architecture • Planning • Project Management • Redevelopment and Urban Design • Surveying and Mapping • Traffic Engineering • Transportation Planning • Water/Utilities Engineering • Website Development Taking advantage of our diversified staff’s experience and knowledge is what distinguishes CGA as a professional consultant and what allows our team to repeatedly complete projects on-time, under budget and exceed expectations while doing so. CGA has served as professional consultants to over 60 municipalities throughout Florida including the Towns of Lake Park, Mangonia Park, Palm Beach, Davie, Surfside, Medley, Bay Harbor Islands, and Jupiter and, the cities of Weston, Cooper City, Pembroke Pines, Dania Beach, Hollywood, Hallandale Beach, Fort Lauderdale, North Lauderdale, Lauderhill, Sunny Isles Beach, Oakland Park, Tamarac, Miramar, Miami Beach, Miami Gardens, Homestead, Marathon, Key West, Boca Raton, Delray Beach, Delray Beach CRA, West Palm Beach, many of which have been repeat clients for more than 20 years. Serving Municipalities Throughout Florida 15 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL We have assembled a team of qualified professionals who have completed projects of similar scope, who possess the diversity of technical skills required for execution of this project, and who have a full understanding of the requirements and intricacies of this project. The team is fully committed to dedicating the necessary manpower, expertise, and attentiveness to ensure that Sunny Isles Beach meets its objectives for this large undergrounding and roadway improvements project. The CGA team will be led by Curt Keyser, Director of Civil Engineering, who will be supported by the roadway task leader, Jenna Martinetti, P.E.. Mr. Keyser will be the contract and project manager while Mrs. Martinetti will be the lead coordinator for all the activities with the team. Under their management, there will be continuous communication with the City’s Project Manager and staff to update them on project status and progress. Mrs. Martinetti will be responsible for allocating resources for the CGA team. Mr. Keyser and Mrs. Martinetti have been operating successfully together in these roles for more than four (4) years and have a proven record of success and great communication with each other and more importantly, with the City. PRINCIPAL-IN-CHARGE AND PROJECT MANAGER Curt A. Keyser, PEMr. Keyser has more than 28 years of leadership, management, and engineering experience. He possesses solid experience and proven success in managing complex operations, cross-functional teams, and million-dollar budgets. He is equally effective as a leader and key contributor. He applies a hands-on, participatory approach to team management that celebrates employee success and provides ongoing feedback for improvement. Mr. Keyser maintains effective balance between big picture, strategic thinking and a focus on the details necessary for program execution. Mr. Keyser recently served as a consultant to Key Biscayne assisting them with their utility undergrounding contracting, has written a white paper for the Town of Surfside’s undergrounding and overseen roadway projects with extensive utility coordination. ROADWAY/DRAINAGE Jenna Martinetti, PEMrs. Martinetti has 14 years of engineering experience and has managed projects related to roadway, stormwater, park retrofits, water and wastewater infrastructure improvements. Her experience includes design and permitting of stormwater management systems, water mains, sewage force mains, lift stations, fuel stations, and site design as well as permitting, preparation of specifications and bidding documents, engineering during construction and project close-out. She also assists in grant writing and supporting documentation for Florida Department of Environmental Protection (FDEP) and Federal Emergency Management Agency (FEMA) grant applications. Specifically, Mrs. Martinetti’s roadway design experience includes design for milling and resurfacing, widening, reconstruction, neighborhood enhancement safety improvement projects, drainage improvements and retrofits, ADA upgrades and compliance, signing and pavement markings, traffic control plans, complete streets incorporation and storm water pollution prevention control plans for municipal and Florida Department of Transportation (FDOT) funded projects. As part of her role as Engineer of Record (EOR) and project manager for roadway projects, she has coordinated utility relocations, utility work schedules, and utility undergrounding. She is certified in the Advanced Maintenance of Traffic (MOT) design and has extensive experience with JPA’s and Local Agency Program (LAP) projects including MPO Transportation Improvement Program (TIP) and Community Incentive Grant Project (CIGP) projects. Mrs. Martinetti recently successfully coordinated a major relocation of FPL overhead lines in order to construct a new roundabout on Nova Drive, a relocation of FPL and Comcast in Hallandale Beach to accommodate a new drainage pump station, and coordinated the undergrounding of FPL, Comcast, AT&T and City street lighting on Iris Terrace on Hollywood beach. Additionally, Mrs. Martinetti has experience with roadway enhancements projects. She recently completed two projects in the Town of Davie, which incorporated complete streets concepts to enhance the corridors by adding landscaped medians, new lighting, widening sidewalks and adding bike lanes. The design and procurement of both of these projects were completed within FDOT’s schedule. 16 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Mohammed Sharifuzzaman, PEMr. Sharifuzzaman has more than 16 years of professional experience in civil, environmental, and transportation engineering with specialization in hydraulics and hydrologic modeling (H&H), surface water management system design, drainage basin/watershed modeling and floodplain analysis, master drainage study, conceptual/master surface water management system design, stormwater pump station design, stormwater retrofit projects, nutrient loading analysis (TMDL calculations), Stormwater Treatment Area (STA) design, FDOT roadway drainage design, and bridge hydraulics. His extensive experience includes roadway projects including new construction, widening and reconstruction, RRR and safety improvement projects, and PD&E studies. Mr. Sharifuzzaman has worked extensively with permitting agencies including the Broward County Environmental Protection and Growth Management (BCEPGM), South Florida Water Management District (SFWMD), the Florida Department of Environmental Protection (FDEP), the Florida Department of Transportation (FDOT), U.S. Army Corps of Engineers (USACE), various municipalities, and counties. His trusted reputation with the permitting agencies has produced a long list of successful and profitable projects. Mr. Sharifuzzaman successfully designed and permitted the drainage systems for the improvements to the Rickenbacker Causeway, the Davie Road Phase 1 and Phase 2 roadway projects, and Hallandale Beach SW Drainage project, all of which included environmental permitting with more than one agency as well as the local municipality. Matt Iles, EIMr. Iles is a design engineer with over three (3) years of experience in stormwater infrastructure, roadway improvements, water, and wastewater projects in the South Florida area. Specific designs include improvements to stormwater runoff disposal systems in the City of Hallandale Beach, drainage improvements and tidal water impact reduction in the City of Fort Lauderdale, and the design of private stormwater collection and treatment systems for residential and commercial properties. Mr. Iles has recently completed the paving, grading, and drainage design for two major roadway corridor projects providing enhancements to the aesthetics and upgrades to the drainage system. UTILITY COORDINATION Nicholas Mahon, PEMr. Mahon has 12 years of engineering experience and has worked on multi-disciplinary, design-bid, and design-bid-build projects in the Mid-Atlantic and Southern regions. Mr. Mahon’s design experience includes site development, ADA accessibility, stormwater management, utility design, roadway deign, comprehensive master plans and investigations of storm and sanitary systems. His roadway design experience includes extensive utility coordination for complete streets projects including milling and resurfacing, widening, reconstruction, ADA upgrades, drainage improvements, signing and pavement markings, traffic control plans, and stormwater pollution prevention control plans. Mr. Mahon is currently a project manager for a LAP project for the City of Oakland Park, which required FPL coordination to add landscaped medians, bike lanes, and widen sidewalks to enhance the Andrews Avenue corridor. He is also the PM for the Tamarac Bike Lanes LAP projects and the Davie Road Phase 1 County CIGP and Phase 2 LAP projects, both of which provided major corridor enhancements on this important thoroughfare for the Town of Davie. Due to limited R/W, unavoidable conflicts with FPL and TECO Peoples gas required coordination during design and utility work schedules. These LAP projects required the FDOT utility coordination process to be followed with initial, follow-up and confirmation letters to be sent to all UOA’s. Jose Jimenez Mr. Jimenez has 22 years of experience in the electrical engineering field. He has experience in electrical design of residential, commercial, and industrial projects as per NEC/NFPA standards and local building department requirements including; load, short circuit, and arc-fault calculations; His most recent experience includes photometric studies and lighting designs for parks and roadway corridors, equipment and material recommendations, and electrical designs for pump stations. He has experience in processing plans, permitting, inspections processes and methods in the Miami-Dade and Broward County municipalities. Mr. Jimenez is responsible for budgeting and managing construction schedules, as well as the coordination of all logistics, including materials, tools, and labor in order to meet service quality. Mr. Jimenez has recently completed the lighting design for Andrews Avenue and Nova Drive, both complete streets projects incorporating existing lighting while upgrading the overall corridor 17 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) photometrics. His experience working with FPL during design has allowed for any necessary relocations and adjustments to occur prior to construction starting thereby eliminating contractor delay claims due to FPL related items. Rainier Gonzalez, EIMr. Gonzalez has over three (3) years of civil engineering experience in stormwater, roadway, water, and wastewater projects in the South Florida area, complimented by a year of experience in construction. Mr. Gonzalez also has two years of internship experience in civil design, and earned his Engineer in Training (EIT) Certification in August of 2015. Mr. Gonzalez has spear-headed CGA’s utility coordination process by creating and managing the utility matrix, assisting in project conflict table creation and design solutions, permitting assistance and construction administration and bidding assistance such as bid evaluations, responses to RFI’s, plan submittal reviews, and pay requisitions. Mr. Gonzalez is also a qualified Stormwater Management Inspector. Mr. Gonzalez has led the utility coordination for numerous recent roadway projects as well as stormwater and water/sewer upgrade projects. LIGHTING Robert Roush, PEMr. Roush has been providing electrical engineering services for 49 years. His experience includes project management, marketing, quality control, and design and quality assurance of electrical systems for commercial, industrial, institutional, communication, and transportation facilities. The broad range of projects he has designed provides a knowledge and understanding of codes and regulations essential to the successful development of projects. In the capacity of Director of Electrical Engineering at CGA, his main role is the support for Engineering, Landscape Architecture, Planning, Transportation, and Construction departments. Mr. Roush has extensive experience with neighborhood and roadway lighting upgrade projects as well as coordinating with FPL. He develops the electrical engineering budget, and reports the division progress, milestones, workloads, project costs, and schedule status. Mr. Roush is responsible for quality assurance during the design phase and quality control at periodic reviews. During construction he performs periodic observation, final inspection including generator testing, and certification of electrical systems. Jorge Cervantes, PEMr. Cervantes has 29 years of experience in designing lighting, power, mechanical and plumbing system for parks, manufacturing, commercial, residential and educational buildings, engineering project fee estimates, lighting consultant expert witness. His experience includes lighting verification and/or recertification of recreational parks, parking structures and outdoor parking areas. Through his electrical design experiences, he has coordinated with FPL and other franchise utility owners. LANDSCAPE ARCHITECTURE/IRRIGATION Tammy Cook-Weedon, ASLA, RLA, LEED-AP BD+CMrs. Cook-Weedon is a Florida Registered Landscape Architect with over 30 years of experience. She has valuable experience for a wide variety of project types, including neighborhood improvement projects, community branding, recreational projects, streetscapes, parks, and general landscape architectural components. As the founding Landscape Architect for CGA, Mrs. Cook-Weedon's professional work is supportive of the firm’s mission to develop excellent sustainable solutions to enhance the environment and surrounding communities. Her leadership has been exemplified in demonstrating and promoting innovative site development strategies that foster the promotion of landscape ecology, water conservation, and landscapes that promote natural processes and habitat restoration. Mrs. Cook-Weedon experience includes working on the SW 5th Avenue in Delray Beach, FL, which involved the design of a new public parking lot between SW 5th AVenue and SW 4th Avenue. The parking lots are enhanced by native trees and shrubs and carpeted by pervious pavers. The 24 space lot is a green design, consisting of pervious pavers, decorative lighting and low-volume irrigation. Michael Conner, ASLA, RLAMr. Conner has more than 30 years of combined experience in municipal, commercial, and private sector work. As a Registered Landscape Architect and a Certified Arborist, he is also knowledgeable in all aspects of urban and community forestry planning, tree inventory, and appraisal – particularly in built-out environments in the South Florida area. His expertise lies in site planning, hardscape and landscape design. He also has successful experience in public space creation and planning, environmental mitigation, contract administration, site inspections, and grant writing. He will contribute his expertise in native planting, arborist services, and landscape 18 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) construction administration for the neighborhood enhancements portion of this project. Most recently, Mr. Conner has worked on numerous roadway projects, which have included complete streets and roadway enhancements. In addition, he has assisted several municipalities with the completion of five Florida Highway Beautification Council grant projects over the last five years and is currently assisting the City of Tamarac with a FDOT grant project on Commercial Boulevard, which is scheduled to begin construction in this year. Marcos MendozaMr. Mendoza has over 24 years of experience. He directs the landscape architectural staff in all code compliance and site design issues, ensuring that Quality Control and construction documents are consistent and thorough, while meeting location-specific permit criteria. Mr. Mendoza is the lead designer for all CGA’s irrigation system plans while contributing his expertise in directing the production and development of construction plans. Mr. Mendoza's experience includes Mills Pond Park, Soccier Field Conversion at Weston Regional Park, Football Field Conversion at Cypress Bay High School, Vista Park, and Middle Beach Recreational Corridor. WATER/SEWER Nicholas Kanelidis, PEMr. Kanelidis has seven (7) years of experience that encompasses design of water, wastewater services, site design, civil, geotechnical, and surface water management to both the private and public sector clients. As a Project Manager at CGA, his responsibilities include preparing proposals with labor breakdowns, developing and managing project schedules, hydrologic and hydraulic modeling, developing quantity take-offs and cost estimates, preparing various engineering plans and technical specifications, permitting, bidding assistance, addressing Contractor RFI’s, reviewing shop drawings, negotiating and reviewing change orders, as-built reviews, final project certifications, and overall project management. He is also certified as a FDEP Stormwater, Erosion, and Sedimentation Control Inspector. As an engineer with previous design and field experience, he is versatile in his ability to perform the tasks at each individual project stage. Specific past project experience includes the City of Oakland Park’s LERIX water and stormwater improvements. This residential project provided new water main and a new stormwater conveyance system to improve flooding issues within the residential neighborhood. The project also included a new stormwater pump station and floodgates for major storm events. The project funding was driven by a FEMA grant, and permit coordination efforts were facilitated by CGA through the City, County, FDEP, SFWMD, and the FDOT. The project was completed by the FEMA funding deadline. Bid Pack 9 Infrastructure Improvements was another residential neighborhood project that included replacement of three municipal sewer pump stations, 20,000 linear feet of water main, 5,500 linear feet of sewer force main, and 15,000 linear feet of drainage pipe. This project also required permit coordination between the City, County, FDEP, SFWMD, and the FDOT James Messick, PEMr. Messick has over 14 years of combined experience within both the private and public sector of civil engineering within the south Florida region. His responsibilities include design of septic/lift stations, large scale stormwater management systems, sewage collection and transmission systems, water distribution systems, roadway and associated drainage improvements, general site development for both public and private engineering projects, construction cost estimates, and feasibility studies, along with the permitting of stormwater management systems, utilities and local roadway improvements to Florida Department of Transportation, Florida Department of Environmental Protection, and Florida Department of Health, along with applicable south Florida counties, municipalities and local agencies, and detailed experience with engineering services during construction. Currently, Mr. Messick is the engineer of record and managing a large drainage improvements project in the City of Hallandale Beach, which includes relocation and/or replacement of existing water and sewer mains as part of the overall neighborhood improvements project. This project required extensive utility coordination in order to relocate FPL and Comcast to allow for the construction of a large stormwater pump station. Similarly, he has recently design a water distribution replacement system within an Oakland Park neighborhood, which included permitting to both Broward County Department of Health and Florida Department of Transportation. He recently was awarded a project for the City of Boca Raton, which includes two project areas of sanitary sewer manhole and associated main relocations due to existing unsuitable soils prevalent in the projects’ vicinity. 19 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) CONSTRUCTION ADMINISTRATION Robert McSweeney, PEMr. McSweeney has more than 27 years of local experience in South Florida including permitting, design, project management, and construction administration. He is the Director of Construction Engineering and has extensive experience with civil and environmental engineering services providing service to both public and private sector clients in Miami-Dade, Broward, and Palm Beach counties. His experience also involves FDOT utility coordination and construction administration as well as design/consulting for the U.S. Air Force. Mr. McSweeney performs the constructability review during design and leads the construction administration services, coordinating construction activities and representing the City during construction to ensure compliance with the plans and specifications. Mr. McSweeney assisted the City during construction of the North Bay Bridge Emergency Pedestrian Bridge project, which required extensive coordination with utilities and construction oversight. Bruce BernardMr. Bernard has more than 44 years of construction management experience. After graduating from Broward Community College, he pursued a career in the utility industry. Mr. Bernard held multiple positions, including the Public Works Director for the Town of Davie prior to joining the CGA team. He was then appointed the position of Field Services Manager at CGA. Throughout his career, Mr. Bernard has managed hundreds of millions of dollars in construction for federal, state, local, and private clients. SURVEYING Steve Watts, PSMMr. Watts has 33 years of experience as a surveyor and mapper. Having spent his entire surveying career working in Broward County, he is extremely knowledgeable of the rules, requirements and specifications for completing surveying and mapping projects in the South Florida area. He specializes in architectural and engineering design type surveys, land acquisition, easements, title research, and computer mapping. Mr. Watts will perform specific purpose survey, hydrographic and topographic survey as needed for the proposed project. Pablo DominguezMr. Dominguez has 18 years of experience as a Surveyor and Mapper. Having spent his entire Surveying career working in South Florida, he is extremely knowledgeable of the rules, requirements and specifications for completing Surveying and Mapping projects in the South Florida area. He specializes in Digital Terrain Mapping (DTM) type surveys, design surveys, Right of Way surveys, hydrographic surveys, 3D laser scanning surveys as well as construction stake out projects, land acquisition and computer mapping. PUBLIC INFORMATION OUTREACH Silvia Vargas, AICP, LEED APMs. Vargas is a professional planner with 25 years of experience. After starting her career as a development review planner in the public sector, Ms. Vargas went on to direct dozens of planning processes that resulted in the creation of innovative plans and implementation tools throughout the U.S. and abroad. Mrs. Vargas' experience encompasses region-wide, county and City comprehensive plans, as well as numerous plans at the system, downtown, district, corridor, neighborhood, and site scales. She has also provided consulting services to several municipalities, including helping set up a new planning department from the ground up. Ms. Vargas' work has been recognized through numerous awards and speaking opportunities. She is skilled and creative facilitator who specializes in designing creative public engagement tools. Her background and experience gives her great sensitivity to the challenges of collaborating with diverse stakeholders in the planning process. 20 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) GEOTECHNICAL ENGINEERING Richard C. Wohlfarth, PEMr. Wohlfarth, PE is the Director of the Engineering Department, which includes professional and technical personnel. He also has overall responsibility for the Special Inspection, Construction Materials Testing and Geotechnical Engineering Divisions where he directs training, quality system review and personnel evaluations. His responsibilities include report review, signing and sealing geotechnical engineering, structural inspection and laboratory testing reports for the company, providing contract negotiation and administration, budget estimating and project management. Mr. Wohlfarth has 27 years of experience (22 with NEF; 5 with other) in various aspects of geotechnical engineering which include determining feasibility of site development, foundation design analysis and recommendations, providing engineering evaluation for bridge and roadway construction, pavement design for roadways, roadway subgrade stabilization by geotextiles and other means, design of shoring systems for utility trenches and other deep excavations, dewatering methodology for trench and other excavations and backfill procedures, setting up and monitoring pile load tests, and providing value engineering for foundations. Stephen J. Mrachek, PEMr. Mrachek joined the team in February 2017 and serves as a Project Manager/Engineer. His responsibilities include preliminary site studies, geotechnical explorations to determine site preparation, feasibility studies for land development, foundation design analysis and recommendations, workload analysis, observation of piling installations, pile load tests, classification of in-situ soils and field/laboratory materials testing. Mr. Mrachek's experience includes construction layout, prepare surveys and as-builts for approval from clients, contractors and the county, collection of field data, layout of structures, buildings and roads and ensuring quality of work being performed in the field by maintaining correspondence between the office and the contractor. Mr. Mrachek has 14 years of experience in the field of geotehnical engineering and construction management throughout Florida via previous employers. Project experience includes deep foundation, major earthwork, roadway and high-rise construction projects. SUBSURFACE UTILITY ENGINEERING Christopher MannoMr. Manno experience is in estimating the total cost of each project or task order, coordinate all traffic plans and permits as well as obtains any necessary project information, contact names, phone numbers, and email addresses for questions regarding the project as it is performed. Mr. Manno also serves as President of Field Operations overseeing all work in the field and coordinates efforts starting with the USA Digalert mark-out, traffic-control set-ups, and the actual vacuum excavation of each pothole site. Charles "Chuck" R. Faust Jr.Mr. Faust experience is in estimating the total cost of each project or task order, coordinate all traffic plans and permits as well as obtains any necessary project information, contact names, phone numbers, and email addresses for questions regarding the project as it is performed. 21 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) PAST RECORDCGA has extensive experience in providing consulting services on a continuing basis to municipal clients. We are currently under contract with over 60 governmental entities - many for over 20 years - demonstrating that we continually provide sustainable high quality services. Client satisfaction remains our underlying theme and is the most important part of any statement on past performance. CGA has recently executed a similar program for the Town of Surfside, and we have completed utilities undergrounding on individual projects in the Town of Jupiter, City of Delray Beach (Artists’ Alley), and City of West Palm Beach (Tamarind Avenue). We have recently completed undergrounding of utilities within the public rights-of-way adjacent to a multi-family residential project being developed by a private client in Hollywood (Sage Beach); we are currently assisting the Town of Surfside with completing their Town-wide undergrounding program; and we are assisting the Village of Key Biscayne with their Village-wide program and with undergrounding of utilities adjacent to a municipal park site ahead of the Village-wide program. CGA has assisted the City with a number of projects in recent years, including Construction Administration of the Newport Beach Pier, Design and Construction Services for the North Bay Road Pedestrian Bridge, evaluation of the stormwater pump station adjacent to Public Works beneath the William Lehman Causeway ramp, 174th Street Roadway Improvements, lighting studies at 174th Street and throughout the Golden Shores Neighborhood, city-wide speed studies, traffic engineering services, and engineering plan review services. We have also been involved in the City’s initial efforts to scope out the issues involved with undergrounding of the utilities within the Golden Shores neighborhood. Through our prior involvement with the City, we are familiar with the Golden Shores neighborhood and its roadways and drainage system. PROJECTS EXPERIENCEPlease reference the Standard Form 330 and Projects section. FINANCIAL STABILITYCGA is a financially stable company with the resources to ensure continued operations throughout the duration of the contract. A copy of our audited financial statement in the past three (3) years is included at the end of this section. SIZE OF WORK FORCECGA maintains a workforce of over 350 professional staff. The workforce proposed for this project is identified in the organization chart and resumes in the SF330 form included at the end of this section. 22 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) AVAILABILITY OF PERSONNEL PER LOCATIONOutlined in the table below is the projected availability (in percentage) of the team members that will be assigned to this contract. All personnel assigned to this contract have the availability to begin work upon contract award, and will maintain availability for the project throughout the duration of the contract. AVAILABILITY OF PERSONNEL 23 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) LOCAL PERMITTING EXPERIENCECGA has extensive experience and knowledge in all applicable federal, state and local codes, laws and regulations. In our capacity for providing engineering services to many local agencies in Miami-Dade and Broward Counties, our experience and familiarity with regulatory agencies plays a major role during the project approach, design, and permitting phases to allow for a more well-coordinated and smoother permitting process. CGA has been responsible for ensuring that all codes are met and addressed prior to permit submittal, which leads to a reduction of agency comments and limits any project schedule interruption. We have been a part of countless projects and continuous communication efforts with regulatory agencies for all aspects of design. Our familiarity with permitting related to infrastructure projects, specifically in Miami-Dade County, can be demonstrated by listing the applicable regulatory agencies and pertinent codes/criteria which are anticipated to be encountered during the permitting phase of services. • City of Sunny Isles Beach Building Department - Dry Run during design • Florida Department of Transportation – If R/W permit is needed near Collins Ave. • South Florida Water Management District – Dewatering Permit and Environmental Resource Permits • Army Corps of Engineers – Environmental Resource Permit (not anticipated unless work in the intracoastal is needed) • Florida Fish and Wildlife Commission (not anticipated unless work near the intracoastal is required) • Miami-Dade County Department of Environmental Resources Management (DERM) PERFORMANCE RECORDS/EFFECTIVE EMPLOYEE PERFORMANCE AND TRAININGCGA has an exemplary record of performance with each of its contracts. Company-wide, CGA has never had a contract terminated or canceled for cause. The key to effective performance is assigning the right person for the job. The CGA Team represents a highly qualified and experienced professional staff with almost every required discipline in one location. In order to maximize employee utilization and therefore performance, CGA utilizes an accounting software, Ajera, to track not only project budgets, but also employee workloads. In an effort to maintain the highest standards, our team receives continuing education to stay on top of the latest industry standards and processes. Through formal training, seminars and in-house technical sharing sessions our staff is kept abreast of ever-changing methods and technology. 24 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) ABILITY TO COMPLETE PROJECTS ON SCHEDULE AND WITHIN BUDGETCGA is committed to completing all projects under this contract on-time and within budget. To ensure this commitment is met, CGA will manage staff schedules to ensure they are adequately available to support the workload as needed. CGA utilizes Ajera to manage the full project life cycle of each project. As one of our project management tools, the system controls all aspects of the project including accounting, project management, and resource utilization in real-time. This system is web based allowing both internal and remotely placed employees full function capabilities via any internet connection. Central to Ajera is customizable dashboards, offering unparalleled access to project's information at a glance for improved visibility and decision making. This software has integrated all the processes necessary to manage and improve the life cycle of the project, which in-turn saves our client both time and money. The system not only keeps a "live" accounting of all of our projects budgets, earned to date, work in progress and estimate to complete, but it also allows Project Managers to assign and resource load to our staff and projects. BUDGET PREPARATION AND COST ESTIMATING CGA maintains two cost estimating databases to provide more accurate budget and cost estimations. The first database contains recent bid prices obtained from recent publicly bid projects within the South Florida area. The second database is a nationally recognized firm that takes into account additional features. The blending of these two databases allows us to more accurately predict future budgets and cost estimates. The budgets prepared can be displayed as line item costs in a schedule of values format or by utilizing a work breakdown structure (WBS). The budgets and cost estimates will take into account several factors including projected material costs, ground conditions, work area, easements required, schedule and time of year. Each of these factors can greatly affect construction costs and if not accounted for can skew your budget estimates. RISK MANAGEMENTCGA’s primary focus is to resolve issues prior to construction. Our Risk Management begins with our multifaceted, multi-discipline Quality Assurance/ Quality Control Plan. Our 30/60/90 and construction plan sets all undergo a thorough review process. At each phase of the plan development the plans are reviewed by a peer engineer, a supervisor, our construction/CEI department and a Director. By allowing our construction/CEI department to review our plans, we are able to visualize constructability issues long before costly labor and equipment have mobilized to the project site. This experience provides our team with the hands-on experience required to minimize risk. 25 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) GENERAL STATEMENT DESCRIBING THE TYPES OF SERVICES OFFERED BY THE FIRM PLANS REVIEW / GENERAL CONSULTING ENGINEERINGCGA is currently under contract with several municipalities to perform all aspects of engineering. Members of the team currently assist local municipalities with site development plan and building department reviews as well as perform design calculations and studies, prepare construction plans and documents, provide construction management and administration, assist in the bidding process, and supplement the staff with grant applications and grant compliance. In some cases, CGA “acts” as the government agency performing all aspects including operations and maintenance, if desired. CGA also works with private clients on development projects ranging from commercial facilities to highend condominiums. This gives CGA a unique ability to understand the development of plans from both the public and private sector which allows for a more thorough review and good working relationship with the applicants. CGA works with each individual municipality to develop a system of plans review and expedited turn around that fits ranging from electronic review of plans and comments documents to hard copy mark-ups delivered back to the client. CIVIL ENGINEERING Civil Engineering for Government Owned Facilities CGA has provided civil engineering services for many municipal sites including city halls, public works compounds, park structures, community centers, city garages and other city structures. This includes the design of paving, grading, drainage, water and sewer, pavement marking and signage, stormwater pollution prevention plans and offsite roadway improvements among others. We have brought these designs from the preliminary stages through the permitting, construction, and certification process for a number of governmental clients. CGA's in-house team of engineers, landscape architects and planners have together designed and provided construction administration for City-owned, award winning parks, such Peacemound Park in Weston. Utilities EngineeringCGA provides professionals who have experience in all aspects of water distribution, water re-use main, wastewater collection/transmission main, plant facilities, and lift station design, permitting, and construction, as well as system evaluation, and analysis. Our water experience includes the design, permitting, and construction inspection of new water distribution networks, water distribution system replacements and upgrades, and booster pump stations. This includes water main extension and/or replacement projects for the cities of Weston, Pembroke Pines, Miramar, North Lauderdale, Miami Beach, Dania Beach, Hollywood, Lauderhill, and the towns of Davie, Surfside, and Bay Harbor Islands. Our wastewater experience includes the design, permitting, and construction of collection systems, transmission systems, lift stations, master pump stations, in-line booster pumping stations, and force mains. CGA has designed pump stations for variety of applications including storm water, shallow wells, deep wells, wastewater lift stations, wastewater effluent disposal, potable water distribution, and in-line booster station. As such, we have worked with and coordinated with all design disciplines including structural, electrical, and instrumentation and controls. CGA has designed, permitted, and managed the construction of new lift stations, and lift station rehabilitation projects for the cities of Weston, Pembroke Pines, Dania Beach, Miramar, North Lauderdale, Hollywood, Cooper City, Opa-locka, and the Town of Davie. As part of the pump station design we also provided hydraulic modeling, solids removal facilities (i.e. bar racks, strainers) design, and emergency power system design. We have worked on pumps with capacities ranging from 0.1 MGD to 200 MGD (320 CFS). Stormwater/Water ResourcesCGA is the District Engineer for Indian Trace Development District and Bonaventure Development District and has completed basin wide hydrologic and hydraulic modeling, including the master drainage system modeling, analysis and pumping station upgrades, large scale mitigation/wetlands plans and the updates of the comprehensive plan. CGA uses 26 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) the latest in advanced computer-assisted software technologies such as Advanced Interconnected Pond Routing (ADICPR), Hydraflow, Cascade and other current computer programs. As District Engineer for ITDD, and BDD, our responsibilities include the review of all construction plans and specifications for conformance with the District criteria, as well as representation at District Board meetings to address technical and engineering issues. In addition, CGA has been successful in obtaining several millions of dollars in grants to accomplish the District’s goals and objectives. Furthermore, CGA has also developed stormwater master plans for several municipalities including the cities of Lauderhill, West Park, Weston and the Town of Surfside. Within these cities, we have provided a number of stormwater-related activities such as stormwater modeling, drainage calculations, pump station design and / or pump station rehabilitation, NPDES MS4 compliance, culvert design, canal extensions and other related hydraulic structures. Our experienced drainage engineers keep abreast of the latest EPA, FDEP, DERM, and SFWMD regulations with respect to drainage issues. They regularly summarize new regulations, their impact on clients and recommend actions to comply with the new regulations. CGA has also provided municipalities with neighborhood improvement projects consisting of an initial study following by implementation of recommendations. The CGA team recently completed a major neighborhood improvement project with two dual pump stations pumping into fifteen (15) stormwater injection wells. CGA is familiar with the regulations required to permit, construct and certify such projects. CGA also provides smaller scale drainage design such as CDBG projects and small development improvement projects. Roadway DesignCGA has provided engineering design, permitting and post design services for numerous municipalities and the Florida Department of Transportation (FDOT). These projects required design for milling and resurfacing, signing and pavement markings, gravity wall, signalization, lighting, curb and gutter, sidewalk, safety improvements, traffic monitoring site upgrade and installation, and utility coordination including all above ground and underground utilities. We have completed projects that involved widening of the roadway, extensions of turn lanes, and construction of ADA compliant sidewalks after the installation of new water mains, sanitary sewer, and under grounding of electrical power, cable television, and telephone. In addition, drainage improvements including curb and gutter, retention areas, pollution retardant devices, and a stormwater collection system were designed. Other projects involved upgrades to roadways from a two lane rural section to a four lane major collector, complete streets improvements including wider sidewalks, adding bike lanes and installing new landscaped medians in order to create a safer driving environment by providing safer turning opportunities as well as a safer environment for pedestrians and bicyclists by providing designated uses for each. The FDOT pre-qualified CGA team has staff with the advanced maintenance of traffic certification required to design and permit traffic control plans in Broward County and has extensive experience with Local Agency Program (LAP) projects including Transportation Enhancement Program and Community Incentive Grant Projects (CIGP). The team recently completed a CIGP project for the Town of Davie widening the roadway, installing landscaped medians, adding bike lanes and upgrading pedestrian access, signalization and lighting. A second phase of the corridor is under construction which also adds bike lanes, upgrades signalization, widens sidewalks and installs a landscaped median. This LAP funded design was completed on time and in compliance with FDOT’s LAP schedule and requirements. Additionally, the bids received were within 5% of the engineer’s estimate provided to the Town. ELECTRICAL ENGINEERINGThe Electrical Engineering Division performs services as the prime/project manager and where the division is a member of a design team. Prime electrical contracts include street, area lighting and power generation and distribution projects. Where services are performed under an umbrella contract including multiple disciplines, projects include Municipal/ Utility Engineering where complete systems design for water and wastewater treatment 27 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) plants, and pumping stations are performed; Land Development projects that include parks, sports facilities, streetscapes, irrigation systems, parking lots, and pedestrian trails; and Highway Engineering that includes street lighting, roadway lighting, pedestrian and bikeway lighting systems. Power generation and distribution projects include the design of natural gas or diesel engine-generators, automatic transfer switches, switchboards, panelboards, motor control centers, motor controllers including motor starters, soft starters, variable frequency drives and filters, power distribution including overcurrent protection devices, disconnect switches, feeders and branch circuiting. Associated computer programs used in these designs include generator sizing programs, short circuit calculation and coordination programs, voltage drop programs and arc flash calculation programs. Construction services may include professional estimates of probable construction costs that are routinely performed for all types of electrical installations as part of the services provided. The engineer attends the pre-bid and pre-construction meetings and responds to requests for information (RFIs). Review and approval of shop drawings is conducted to assure a smooth construction process. Periodic observation of construction is performed during the construction, and testing and final inspections are conducted to close out the construction contracts. CONSTRUCTION MANAGEMENT/ADMINISTRATION SERVICESCalvin, Giordano & Associates has an experienced and diverse staff in the field of construction administration. Our methods of approaching projects have proven extremely effective for clients throughout South Florida. The CGA Construction Team is highly qualified to be the owner’s Construction Manager Support for implementation of capital improvement projects because of our extensive work with municipalities and their Capital Improvement Programs. Projects will be assigned to a Project Manager (PM) who will have the responsibility of overseeing all aspects of the work, project scheduling, project budget and communication. The PM will be the point of contact with the client and other parties involved, will participate in all relevant meetings, including daily coordination meetings, progress meetings, issue resolution meetings, and will prepare daily reports summarizing work progress, describing issues, and providing insight for anticipated important matters in the near future. The PM’s role will be coordinating with the Contractor, and other parties involved in the project for review of shop drawings, contractors’ submittal's, and as-built information; documenting field activities; assisting inspectors in pass/fail assessments; updating construction/inspection schedules; reviewing pay requests; reviewing change orders; and performing many other day-to-day activities to facilitate construction process, resolve conflicts, and submit weekly progress reports. The PM or assigned inspector will conduct site visits on a regular basis to ensure work is performed in accordance with the project requirements and specifications and will remain in contact with Project Managers from other entities involved in the project to ensure communications are streamlined, distribution of information taking place properly, and relevant information reaches those who should receive the information. As part of being a Municipal Consultant for local governmental entities, we are constantly involved and up to date in all related agencies requirements and procedures; we have served as construction management for over $60 million dollars worth of capital projects, successfully assisting in the design, grant application, bidding, selection of contractor, construction inspection and final certifications. The client will be provided with a progress report based on our policy that communication with the client and other interested parties at each step throughout a project is key to the successful outcome of a project. Appropriate city staff and other agency personnel and stakeholders will be copied on any work product for which comments or review is requested. Meetings will be scheduled with outside agencies and stakeholders as needed for a successful project completion. We have also designed and maintained an information website with construction progress, overall schedule, financial and traffic updates posted in an easy to read in order to allow the public real time information about the project. 28 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) SURVEYING SERVICESCGA’s team experience covers a broad spectrum of land surveying services. Our team has experience working with state, municipal, and private-sector projects. CGA has fully equipped survey crews which can mobilize within 48 hours notice. The Surveying and Mapping Division of CGA uses the latest technology when preparing surveys, including GPS equipment, automated data collection, laser scanners, underground utility detection technologies and a vacuum/slurry subsurface excavation system called the VaXcavator that exposes existing underground utilities. Operated by one of the field survey crews, the VaXcavator allows us to obtain subsurface horizontal and vertical locations required for design, in previously developed areas. Additionally, Hypack software and Odom sounders allow us to offer hydrographic surveying services. By integrating with our Trimble GPS units, the equipment creates a three-dimensional model of the water body being surveyed with tremendous accuracy and speed. Diverse capabilities for a wide range of needsThe CGA Surveying and Mapping Division is equipped with staff who are best-in-class. Our staff consists of professional surveyors and mappers, CADD technicians and survey crews that perform the following: • Boundary Surveys • Topographical Surveys • Hydrographic Surveys • Route Surveys for Engineering Design • Utility and Infrastructure Layout • GPS (Global Positioning System) Surveys • Record (As-Built) Surveys • Sketch and Scan Descriptions Leica C-10 3D Laser ScannerIn the past, detailed survey reports typically took 1-2 weeks, and several visits to a site. With the Leica C-10 3D Laser Scanner, survey scanning is significantly faster and can reduce the time by up to 50 percent. One Visit, a Full View, Hundreds of PhotosRecognizing the value to our clients, CGA was among the first firms in Florida to acquire 3D laser scanning. Our staff can now scan virtually anything in half the time of conventional methods, with a level of detail never before available. The Leica C-10 3D Laser Scanner can take a virtual, detailed snapshot of a site including ceilings, undersides of bridges, elevated pipe racks, tall facades, columns, and towers - areas that were previously difficult to access. It collects millions of data points of all items in a 360° horizontal and 270° vertical field of view, allowing a full field of view. This eliminates an additional visit to capture data not covered in the original scope of work or the question of where a grade elevation was taken on an object. The 3D Laser Scanner captures all the items at once in a permanent record that can be filed, including hundreds of high quality photos and graphics or animations, from 3D to virtual walk-throughs of sites - ideal for redevelopment areas, client presentations or commission meetings. For added convenience, the survey data can be exported to whatever format our clients need, whether Auto-Cad, Mircostation, or other software. A typical roadway overpass prior to scanning with the ScanSation. The ScanStation captures an infinite amount of data, including millions of data points for everything visible to the eye, not just the roadway. ScanStation is more accurate, faster and versatile than conventional methods. 29 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) LANDSCAPE ARCHITECTUREThe Landscape Architecture Department has a unique blend of qualified professionals who provide a variety of interests and personal expertise as an underlay to our Landscape Architectural services. They are educators, community leaders, activists, volunteers, artists, designers, LEED Accredited Professionals. This mix of talent allows us to provide our clients with holistic, well-rounded design solutions that, beyond considering all the functional and implementation related issues needed to be resolved, ensure a design product that, once built, will provide for longevity, experience, value and unique identities essential to establishing community branding. This is supported by our qualified, award-winning staff, including Registered Landscape Architects with more than 60 years of collective professional experience and by a strong team of supporting experts. CGA’s Landscape Architecture Department has considerable talent and ability within its ranks and has the added resources within the company to provide all services – expected as well as unexpected – that may be needed during the course of any landscape architectural project. The Department has been able to successfully complete less traditional tasks, including applying for and obtaining grants to fund landscaping projects, such as Beautification grants for roadside landscaping for the cities of Weston, Dania Beach, West Park, Miramar, Fort Lauderdale, Pembroke Pines, Pompano Beach, and Oakland Park. Customer satisfaction is our primary goal, whether a project involves development or redevelopment, inspection, reporting or design, private client or a public entity. Our broad range of project experience includes: • Comprehensive plans • Grant application preparation and processing • Historic preservation • Hardscape design • Graphic design and presentation • Trail and open space design • Feasibility studies • Habitat restoration • Vegetative delineations and assessments • Arborist and tree mitigation services • Invasive exotic vegetation monitoring • Development of mitigation options with an opinion of probable cost • Wetland mitigation monitoring • Master Planning • Landscape and site planning • Urban revitalization • Greenway and streetscape design • Recreational facilities design • Environmental impact studies • Site due diligence • Environmental permitting and coordination • Natural resource • Wetland delineations and wetland functionality assessments • Wetland mitigation plans for land development projects While Landscape Design is a stronghold of our services, we also provide a broad array of project experiences. A few of these include hardscape, greenway and streetscape design; recreational and park facilities design; municipal landscape code review and inspection services; redevelopment master planning; arborist and vegetation services; and, of course, design and development of planting plans for various conditions, including parks and open space, roadway and roundabout beautification, environmental mitigation, buffer creations, and site planting design. 30 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) TRANSPORTATION PLANNING AND TRAFFIC ENGINEERING SERVICESSince 1997, the CGA Transportation Engineering and Planning Division has specialized in the provision of transportation planning and traffic engineering services to a variety of municipalities, offering an in-depth understanding of the regulatory framework and fiscal boundaries under which local governments operate. Our division is skilled and responsive to a wide variety of transportation planning and traffic operations requests that may originate from City Staff, Mayor and Commissioners, the public and all the municipality’s various clients – developers, contractors and other service providers. The CGA Transportation Engineering and Planning Division workload is highly specialized and often encompasses unique situations that are technically complex or challenging within the regulatory framework. As a result, our services can range anywhere from the development of traffic performance standards for a newly incorporated City, to the design and implementation of new signal technology along a historically congested corridor. From our collective experience managing projects for the Florida Department of Transportation (FDOT), the School District, municipal and private sector transportation projects, we have been able to develop a unique and successful approach that integrates both “agency” and “private-sector” perspectives. This approach has proven to be mutually beneficial for both our public and private sector clientele allowing for projects to proceed more efficiently and cost-effectively. • Site Plan Reviews of Proposed Development and Redevelopment Properties • Attendance at City Commission meetings to provide Traffic Engineering Expertise and Support • Traffic Safety Studies and School Zone Considerations • Access Management and Driveway Spacing Reviews • Traffic Signal Warrant Studies/Signal Design • Traffic Forecasting and Needs Assessment • Traffic Impact Analysis Reviews (Based on Traffic Performance Standards) • Preparation/Review of Maintenance of Traffic Plans • Regional Transportation Travel Demand Modeling • Emergency Evacuation Studies and Planning • Representation at DRC, Planning & Zoning, and City Council meetings • Traffic Calming” and Neighborhood Traffic Intrusion Studies • Signal Retiming/Phasing Adjustments • Traffic Impact Studies • 4-Way and 2-Way Stop Sign Control Evaluations • Intergovernmental Agency Coordination and Representation • Maintenance of Traffic Evaluations • Comprehensive Traffic Planning • Signing and Marking Recommendations • Transportation Grant Applications • Corridor Studies 31 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) PUBLIC OUTREACHAlthough the City has stated they will do most of the public outreach on this project, CGA can provide critical support in the way of community outreach, preparation of graphics, meeting attendance, and project updates. Most of our practice has been in the public sector, and therefore coupled with the necessary abilities to inform and engage the residents and stakeholders through various public involvement mechanisms. Having the majority of the team of professionals as a unified team under a single roof, CGA is not only able to develop, communicate and solicit discussions about a larger vision affecting the project, but we are cognizant of the processes and means to communicate that vision and need to the public. These are essential and integral aspects of public participation processes. CGA has experience working with the residents and local agency to move utility services from the alley or backs of houses to the street front which takes a special and focused public outreach program. The CGA team is prepared to assist the City with this as much or as little is requested of us. GEOTECHNICAL ENGINEERINGNUTTING ENGINEERS OF FLORIDA, INC. (NUTTING) has been one of the premier geotechnical engineering firms in South Florida since its inception in 1967. Prior to this date, work was performed under the name Nutting Engineers, Inc., which originated in 1056 preceded by H.C. Nutting in Miami from 1932 until 1956. NUTTING's comprehensive range of services include geotechnical exploration and engineering including soil borings and groundwater well drilling, monitoring of pile installation, groundwork modification and chemical grouting procedures, quality control/quality assurance testing of construction materials, structural inspections (special/threshold) of structures. NUTTING has an extensive history in infrastructure, roadway, public safety and municipal building projects via our multiple qualification-based contracts. Since 1967, NUTTING has provided services to 100s of projects throughout South Florida relevant to rehabilitation and replacement of existing storm drainage lines, storm and sanitary sewer pumping stations and mains; design and installation of new storm drain lines, new storm sewer pumping stations and sanitary sewer mains and water mains; water treatment facilities (WTP/WWTPs), reclaimed water facilities; roadway design (improvements, widening, extensions, lighting, guard rails) and parking lots; park design, bridges, police and fire stations, City Halls, community centers, libraries, and related projects outlined in the RFQ. SURFACE UTILITY ENGINEERINGUS Utility Potholing & Air Excavation (USUPAE) has been in the vacuum excavation utility potholing services business since 2014. USUPAE has been a firm believer in the use of air/vacuum excavation for a number of reasons. Most importantly, because air is a compressible gas, when used to breakup soil to discover a buried utility it flows around the conduit, pipe or cable when in direct contact versus cutting into it. Air excavation is also considered environmentally friendly in that it doesn’t create runoff that may spoil storm water and require expensive measures to filter the runoff. Safer to the operator and the crew and with a never ending source, air is always the first choice for vacuum excavating by USUPAE crews. USUPAE provides a complete service when providing potholing services. From start to finish, these services may include: USA Digalert mark-out, arranging for any necessary “standby” personnel (HP Gas, fiberoptic, electric, etc.), arranging for private professional mark-outs, obtaining approved traffic control plans, obtaining necessary encroachment/traffic control permits, vacuum excavation of the target utilities, full depth and size measurements as requested by the client, complete photo essay of each pothole location, back-fill, compaction and site patching as required. Once completed, all pothole sites are clearly marked via survey nail, feather or lathe stake. Most importantly, USUPAE prepares a “Subsurface Utility Report “with their proprietary software that includes all the data necessary for design engineers to locate horizontally and vertically any potential conflict when designing a new pipeline, road widening or other major project. USUPAE, is headquartered in Oakland Park, FL, services the entire South Florida region including St Lucie, Martin, Monroe, Collier, Hendry, Glades, Highlands Okeechobee, Lee, Charlotte, Desota, Hardee, Manatee, Sarasota, Polk, and Hillsborough Counties. Depending on job size, one or two rigs and their two-man crews may be assigned to a project. USUPAE currently operates two (2) VacMaster 4000 excavation rigs, which are specifically designed for air/vacuum potholing. From the initial request for pricing and crew availability, USUPAE responds via the main office with a price quote based on total job hours estimated, traffic control set-up costs and “Subsurface Utility Report”. Most projects can expect a crew to respond within one to three days depending on the number of sites, USA Digalert markout and current USUPAE workload. USUPAE also has a 24hr contact line for immediate emergency response if needed. 32 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) LOCATION OF MAIN AND BRANCH OFFICES Headquarters:1800 Eller Drive, Suite 600Fort Lauderdale, FL 33316 Branch Offices: Miami-Dade:Bayshore Executive Plaza10800 Biscayne Boulevard, Suite 950Miami, FL 33161 West Palm Beach:580 Village Blvd., Suite 325West Palm Beach, FL 33409 Estero:Brooks Executive Suites9990 Coconut Road, Suite 340Estero, FL 34135 Clearwater:Feather Sound Corporate Center13535 Feather Sound Drive, Suite 135Clearwater, FL 33762 Port St. Lucie:2400 SE Veterans Memorial Parkway, Suite 207Port St. Lucie, FL 34952 NUMBER OF YEARS IN BUSINESS AND NUMBER OF EMPLOYEES IN EACH DEPARTMENT CGA been in business for over 80 years. Employees by Discipline Discipline Number Administrative 74 Chemical Engineers 1 Civil Engineers 19 Construction Inspectors 28 Electrical Engineers 1 Landscape Architects 4 Planners: Urban/Regional 10 Permitting Specialists 26 Surveyors 1 Transportation Engineers 3 CADD Technicians 5 Field Surveyors 9 GIS/Data Technology Specialists 10 Code Enforcement Specialists 16 Environmental Specialists 1 Landscape Designers/Inspectors 4 Biologist/Indoor Air Quality 1 Other Employees 166 TOTAL 379 LOCATION OF THE OFFICE FROM WHICH WORK WILL BE PERFORMED Work will be performed from 1800 Eller Drive, Suite 600, Fort Lauderdale, FL 33316. LICENSES AND CERTIFICATIONS A copy of the CGA project team's professional and business licenses, including FDOT certifications are included in the Licenses and Certifications section. LOCATIONSFort LauderdaleMiami-DadeWest Palm BeachEsteroClearwaterPort St. Lucie 33 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) FINANCIALSTATEMENTS 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) STANDARD FORM 330 87 5. NAME OF FIRM PART I - CONTRACT-SPECIFIC QUALIFICATIONS ARCHITECT - ENGINEER QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) 4. NAME AND TITLE 8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER (Check) PR I M E J- V PA R T N E R SU B C O N - TR A C T O R 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. b. c. d. e. f. STANDARD FORM 330 (REV. 8/2016) D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE AUTHORIZED FOR LOCAL REPRODUCTION Calvin, Giordano & Associates, Inc. Marketing@CGAsolutions.com RFQ No. 18-08-01 (954) 921-7781 (954) 921-8807 August 13, 2018 ✔ ✔ ✔ Calvin, Giordano & Associates, Inc. 1800 Eller Drive Suite 600 Fort Lauderdale, FL 33316 Prime Geotechnical Engineering Subsurface Utility Engineering 2051 NW 112 Avenue Suite 126 Miami, Florida 33172 4630 NE 11th Avenue Oakland Park, FL 33334 Nutting Engineers of Florida, Inc. US Utility Potholing & Air Excavation ✔ ✔ Consulitng Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) - Sunny Isles Beach, FL 88 D. ORGANIZATIONAL CHART OF PROPOSED TEAM City of Sunny Isles Beach Principal-in-Charge and Project Manager Curt A. Keyser, PE Calvin, Giordano & Associates, Inc. Roadway / Drainage Jenna Martinetti, PE Mohammed Sharifuzzaman, PE Matthew Iles, EI Calvin, Giordano & Associates, Inc. Lighting Robert W. Roush, PE Jorge R. Cervantes, PE Calvin, Giordano & Associates, Inc. Landscape Architecture / Irrigation Tammy Cook-Weedon, ASLA, RLA, LEED AP BD+C Michael Conner, ASLA, RLA Marcos Mendoza Calvin, Giordano & Associates, Inc. Water / Sewer Nicholas W. Kanelidis, PE James Messick, PE Calvin, Giordano & Associates, Inc. Construction Administration Robert McSweeney, PE Bruce Bernard Calvin, Giordano & Associates, Inc. Utility Coordination Nicholas B. Mahon, PE Jose Jimenez Rainier Gonzales, EI Calvin, Giordano & Associates, Inc. Surveying Steve Watts, PSM Pablo Dominguez Calvin, Giordano & Associates, Inc. Public Information Outreach Silvia Vargas, AICP, LEED AP Calvin, Giordano & Associates, Inc. Subsurface Utility Engineer Christopher Manno Charles "Chuck" R. Faust Jr. US Utility Potholing & Air Excavation Geotechnical Richard C. Wohlfarth, PE Stephen J. Mrachek, PE Nutting Engineers of Florida, Inc. Subconsultants 89 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE BACHELOR OF SCIENCE IN MECHANICAL ENGINEERINGVIRGINA POLYTECHNIC INSTITUTE & STATE UNIVERSITY Mr. Keyser is a licensed Professional Engineer and a Certified Contractor in 5 categories in the State of Florida. He has 28 years of leadership, management, and engineering experience, including an extensive project management background that includes Community Development Districts; site development; design of utilities; paving, grading, and drainage; artificial turf athletic fields; fuel systems; and ADA compliance upgrades. Mr Keyser also possesses an extensive knowledge of The Florida Building Code and local municipal engineering code requirements. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL Ongoing (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDistrict Engineer Services, Wentworth Estates Community Development District; Naples, Florida Oversee engineering activities for the District, including planning; budgeting; preparation of reports, plans, designs, specifications, and studies; plans review for both engineering permits and Development Review; construction management; construction observation; inventory and maintenance of District assets. Check if project performed with current firmX Ongoing (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDVillage Engineer SerivcesBal Harbour, Florida Oversee utilitiy and engineering plans reviews for both engineering permits and Development Review; capital projects budgeting; and maintenance and updating of engineering codes and standards; grant identification, application and administration; operation and maintenance of water, wastewater and Stormwater utilities; provide associated regulatory monitoring and compliance services; and administer the Village's NPDES/Stormwater Master Plan programs Check if project performed with current firmX Ongoing (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDAuxiliary City Engineer ServicesSurfside, Florida Oversee engineering plans review for both engineering permits and Development Review; capital projects budgeting; and maintenance and updating of engineering codes and standards; grant identification, application and administration; operation and maintenance of water, wastewater and Stormwater utilities; provide associated regulatory monitoring and compliance services; and administer the Town's NPDES/Stormwater Master Plan programs Check if project performed with current firmX Ongoing (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity Engineer ServicesWeston, Florida Oversee engineering plans review for both engineering permits and Development Review; capital projects budgeting; and maintenance and updating of engineering codes and standards; grant identification, application and administration; operation and maintenance of water, wastewater and Stormwater utilities; provide associated regulatory monitoring and compliance services; and administer the Town's NPDES/Stormwater Master Plan programs Check if project performed with current firmX Ongoing (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDContinuing Engineering Consulting ServicesCooper City, Florida Project manager, Contract Manager, and Client Liaison for various capital improvement projects performed under the continuing services contract. Projects include water, sewer, drainage, roadway, parks, and municipal facilities improvements, as well as traffic engineering, surveying, environmental engineering, and planning services. Professional Fees: $200,000. Value of Construction: $800,000 Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 CURT A. KEYSER, PE PROJECT MANAGER 28 5 FLORIDA PE NO. 51407 90 Ongoing (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDContinuing Engineering Consulting ServicesDavie, Florida Project manager, Contract Manager, and Client Liaison for various capital improvement projects performed under the continuing services contract. Projects include water treatment plant, sewer treatment plant, water, sewer, drainage, roadway, parks, and municipal facilities improvements, as well as traffic engineering, surveying, environmental engineering, and planning services. Professional Fees: $2,000,000. Value of Construction: $20,000,000 Check if project performed with current firmX Ongoing (1) TITLE AND LOCATION (City and State) g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDContinuing Engineering Consulting ServicesHallandale Beach, Florida Project manager, Contract Manager, and Client Liaison for various capital improvement projects performed under the continuing services contract. Projects include water, sewer, drainage, roadway, parks, and municipal facilities improvements, as well as traffic engineering, surveying, environmental engineering, and planning services. Professional Fees: $1,000,000. Value of Construction: $18,000,000 Check if project performed with current firmX Ongoing (1) TITLE AND LOCATION (City and State) h. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDContinuing Engineering Consulting ServicesKey Biscayne, Florida Project manager, Contract Manager, and Client Liaison for various capital improvement projects performed under the continuing services contract. Projects include water, sewer, drainage, roadway, parks, and municipal facilities improvements, as well as traffic engineering, surveying, environmental engineering, and planning services. Professional Fees: $100,000. Value of Construction: Pending Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 91 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.S., CIVIL ENGINEERING, FLORIDA STATE UNIVERSITYMAGNA CUM LAUDE Ms. Martinetti has over fourteen years of engineering experience and is senior project manager for projects within many local municipalities. Her roadway design experience includes design for milling and resurfacing, widening, roadway reconstruction, safety improvement projects, neighborhood enhancements, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control plans, storm water pollution prevention control plans and complete streets incorporation. Her experience also includes utility coordination, participation in the quality control process, and local agency program (LAP) coordination, including agency certification assistance. Mrs. Martinetti has the advanced maintenance of traffic certification required to design and permit traffic control plans and has extensive experience with JPA’s and Local Agency Program (LAP) projects including Transportation Enhancement Program and Community Incentive Grant Projects (CIGP). Her project management experience also includes design and retrofit of parks, roadways, water mains, sewage force mains, lift stations, fuel station, site development and design, neighborhood improvement projects, and stormwater projects as well as permitting, bidding documents, engineering during construction and project close-out. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2013-2016 2016 (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDFronton Blvd ImprovementsDania Beach, Florida Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees - $766,000 Check if project performed with current firmX 2011-2017 2017 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSage Beach CondominiumHollywood, Florida Project Manager and EOR for civil site design for condominium complex located east of A1A on Hollywood Beach. Design and permitting included replacement of the water main, coordination to underground all utilities on Iris Terrace and Jasmine Terrace as part of the offsite improvements, drainage design including a closed system with wells and exfiltration trench as well as offsite roadway and drainage improvements on Iris Terrace, Jasmine Terrance and a portion of South Surf Road. The utilities were designed by the utility agency owner and given to CGA to draw onto one “utility relocation” sheet for coordination and layout of the multiple underground conduits and resulting handholes. Construction Cost - $22 Million, Professional Fees - $178,500 Check if project performed with current firmX 2014-Present Ongoing (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDNova Drive Complete Streets Improvements ProjectDavie, Florida Project manager and engineer of record for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures such as a roundabout, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and recently awarded for construction. A major FPL relocation was necessary in order to construct the new roundabout. 2014-Present, Senior Project Manager, Previous Town Engineer: Laura Borgesi (954) 797-1113. Construction Cost: ($6.9M), Firm Fees: $459,475 Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 JENNA MARTINETTI, PE ROADWAY ENGINEER 14 14 PE FLORIDA NO. 69035 92 2011-2016 2016 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSR 870/Commercial Blvd, FDOT District IVTamarac, Florida Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing, signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016. Check if project performed with current firmX 2013-2014 2014 (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDRickenbacker Causeway, Miami Dade County, Florida In-house project manager as a sub-consult for the design build team with Kiewit Construction for the rehabilitation of the Rickenbacker Causeway’s West Bridge and the rehabilitation and expansion of the Bear Cut Bridge. CGA’s scope included hydrographic and topographic survey, drainage design, lighting, and signing and pavement markings. The Bear Cut Bridge was widened to accommodate a protected multiuse path in both directions and an 8’ bike lane adjacent to traffic in both directions as well as improvements to both approaches requiring coordination with two of the County’s adjacent future projects. The existing cross slope and bridge deck structure were modified impacting the existing drainage and requiring permits through Miami Dade County’s Regulatory & Economic Resources Department and South Florida Water Management District. CGA coordinated the bridge circuits during construction as well as providing new lighting for the widened bridge and new multiuse paths Check if project performed with current firmX 2013-2016 2016 (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDavie Road Phase 1 Roadway ImprovementsDavie, Florida Senior project manager for Davie Road Phase 1, from SR 84 to Nova Drive. The scope included widening Davie Road from a 5 lane section to 6 lane divided roadway with bike lanes, upgrading signalization and signing and pavement markings, traffic control plan, ADA upgrades, new sidewalks and pedestrian enhancements, drainage modifications, new lighting, a new landscaped median, and tree removal/relocations. This project is partially funded by a County Incentive Grant (CIGP) and required extensive coordination for a Town project on a County owned roadway. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 2015-2018 2018 (1) TITLE AND LOCATION (City and State) g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDavie Road Phase 2 Corridor EnhancementsDavie, Florida Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP) funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design services for this federally funded project required close coordination with the FDOT and CEI team. Check if project performed with current firmX 93 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE M.E., CIVIL ENGINEERING, LAMAR UNIVERSITY, BEAUMONT, TX 2000B.S., CIVIL ENGINEERING, BANGLADESH UNIVERSITY OF ENGINEERING & TECHNOLOGY, BANGLADESH, 1997 Mr. Sharifuzzaman has more than 16 years of professional experience in civil, environmental, and transportation engineering with specialization in hydraulics and hydrologic modeling (H&H), surface water management system design, drainage basin/watershed modeling and floodplain analysis, master drainage study, conceptual/master surface water management system design, stormwater pump station design, stormwater retrofit projects, nutrient loading analysis (TMDL calculations), Stormwater Treatment Area (STA) design, FDOT roadway drainage design, and bridge hydraulics. His extensive experience includes land development projects including commercial/residential/institutional/DRI projects, roadway projects including new construction, widening and reconstruction, RRR and safety improvement projects, and PD&E study. Mr. Sharifuzzaman has worked extensively with permitting agencies including the South Florida Water Management District (SFWMD), the Florida Department of Environmental Protection (FDEP), the Florida Department of Transportation (FDOT), U.S. Army Corps of Engineers (USACE), various municipalities, and counties. His trusted reputation with the permitting agencies has produced a long list of successful and profitable projects. His extensive experience with construction, and thorough knowledge of codes and regulations as they apply to each development, is an asset for any project. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2013-Ongoing N/A (1) TITLE AND LOCATION (City and State) a.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSite Plan ReviewCity of Weston, Florida Currently responsible for review of Site Plans, Engineering Plans, Engineering design documents for various projects in the City of Weston as part of City of Weston development & permitting review process. Check if project performed with current firmX 2014 2014 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDFlamingo Gardens Master Drainage StudyCooper City, Florida Modeling of 135-acre Flamingo Gardens Master Drainage Basin to determine the potential cause of neighborhood flooding and determination of the most feasible drainage improvements to minimize future flooding. Performed drainage analysis, calculations, modeling, alternative improvements and cost/benefit analysis. Check if project performed with current firmX 2013 In Construction (1) TITLE AND LOCATION (City and State) c.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBid Pack No. 9 Infrastructure Improvements ProjectCity of Oakland Park, Florida Cherry Creek watershed modeling, design and permitting for proposed drainage improvements within the coral lakes subdivision of the City of Oakland Park. Performed drainage calculations, modeling, drainage plans and specifications developments, ERP permitting. Check if project performed with current firmX 2013 2015 (1) TITLE AND LOCATION (City and State) d.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity of Weston Drainage Improvements ProjectCity of Weston, Florida Schaffer canal drainage basin/Watershed modeling, design and permitting of innovative surface water management systems consisting of pump stations and pressurized injection wells. Performed drainage design, analysis and modeling. Check if project performed with current firmX 2012 2012 (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLloyd Estates Drainage StudyCity of Oakland Park, Florida H&H study for the Lloyd Estates drainage basin seeking FEMA grants, conceptual design for a pump station across Sleepy River discharging into the SFWMD C-13 canal. Performed drainage analysis and modeling. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 MOHAMMED SHARIFUZZAMAN, PE ROADWAY/DRAINAGE ENGINEER 16 6 PE STATE OF FLORIDA NO. 67640 94 2012 Present (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBonaventure Development District Drainage ImprovementsCity of Weston, Florida Responsible for drainage design within completely built-out 1237-acre Bonaventure Development District, surface water modeling, design, permitting, and CEI services for drainage improvements. The project scope included modification to existing conveyance systems, exfiltration trench, new storm drainage network, and up-sizing existing lake interconnect culverts. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 95 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.S., CIVIL ENGINEERING FLORIDA ATLANTIC UNIVERSITYM.S., CIVIL ENGINEERING FLORIDA ATLANTIC UNIVERSITY - PENDING Mr. Iles is a design engineer with three years of experience in stormwater infrastructure, roadway improvements, water, and wastewater projects in the South Florida area. Specific designs include improvements to stormwater runoff disposal systems in the City of Hallandale Beach, drainage improvements and tidal water impact reduction in the City of Fort Lauderdale, and the design of private stormwater collection and treatment systems for residential and commercial properties. In addition to design, Mr. Iles’ has obtained a number of drainage permits including Broward County Surface Water Management License, Broward County Environmental Resource Permit, FDEP Class V Drainage Well Permit, FDOT Drainage Permit, U.S. Army Corps of Engineering Navigable Waterway Permit, and more. Matthew’s academic focus includes the use of stormwater treatment methods resilient to sea level rise, with active research being conducted in the use of Electron Magnet Oxygen Hydrogen (EMOH) separation to combat algae growth in municipal treatment ponds. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL Ongoing N/A (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSW Hallandale Beach Drainage ImprovementsHallandale Beach, Florida Design Engineer for the analysis and design of drainage system improvements in the southwest quadrant of the City of Hallandale Beach. The scope included a drainage model analysis of the existing site conditions using ICPR and utilizing survey, and record drawings for calibration. Additional analysis included hydraulic modeling of over one-half mile of ductile iron forcemain discharging into seventeen drainage wells. Check if project performed with current firmX 2011-2016 2016 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDNova Drive Roadway Improvements ProjectDavie, Florida Design Engineer for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and on hold for construction pending adjacent project completion. Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDavie Road Improvement ProjectBroward County, Florida Design Engineer for the widening of the existing roadway to a six lane divided roadway along with turn lanes, driveway access, and road¬way intersection improvements from south SR 84 to Davie Road. The project also included modification of existing stormwater management system, analysis and modeling of “Basin A” of Tindall Hammock Irrigation and Soil Conservation District (THISCD), integration of Davie Road drainage system with THISCD rock pit drainage system. (Added under Roadway and Drainage category on resume website) Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDFronton Boulevard Roadway ImprovementsDania Beach, Florida Design Engineer for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a casino. Redesign of this City owned roadway was required as part of the developers agreement with the City. Upgrades on Fronton Blvd were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; coordination of utilities; and drainage design to accommodate the roadway improvements was performed. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 MATTHEW ILES, EI ROADWAY/DRAINAGE DESIGNER 3 3 ENGINEER INTERN CERTIFICATENO. 1100018905 96 (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBayshore Drive Drainage ImprovementsFort Lauderdale, Florida Design Engineer for the analysis and design of drainage system improvements in the Central Beach Alliance Neighborhood off of A1A. The scope included a drainage model analysis of the existing site conditions using ICPR and utilizing survey, record drawings, and LIDAR for calibration. A full drainage report summarized the different options for improvements in the area including associated costs. Some of the proposed alternatives included exfiltration trenches, drainage injection wells, and tidal check valves. (Added under Roadway and Drainage category on resume website). Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 97 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.S., CIVIL ENGINEERING, UNIVERSITY OF CENTRAL FLORIDA Mr. Mahon has 12 years of engineering experience and is a project manager for various projects related to roadway, utility and land development projects in the Mid-Atlantic and South Florida regions. His project management experience includes site development, ADA accessibility, stormwater management, utility design, roadway deign, comprehensive master plans and investigations of storm and sanitary systems, permitting, bidding documents, and engineering during construction services. Mr. Mahon’s site development and highway design experience includes design for milling and resurfacing, widening, overbuild, reconstruction, utilities, ADA upgrades, drainage improvements, signing and pavement markings, traffic control plans, and storm water pollution prevention control plans. His experience also includes local agency program (LAP) coordination. In addition, Mr. Mahon has performed Site Plan Reviews for the City of Weston, City of West Park, City of Pembroke Pines, City of Pahokee, Town of Surfside, and Village of Estero. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2014 2015-2017 (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDavie Road Phase 1 Davie, Florida Project engineer for Davie Road from SR 84 to Nova Dr. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, roadway widening, sidewalk improvements to meet current ADA standards, add bike lanes, signalization at Nova Drive & Reese Road, pavement marking & signage for a six lane divided road, maintenance of traffic, drainage modifications, lighting, and tree removal/relocations. Review and respond to contractor provided shop drawings & RFI’s during construction. Project partially funded by a County Incentive Grant. Check if project performed with current firmX 2014-2016 2016-2018 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDavie Road Phase 2 Davie, Florida Project Manager and Engineer of Record for Davie Road from SW 39th Street to Nova Dr. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, sidewalk improvements to meet current ADA standards, add bike lanes, signalization at SW 39th St and SW 37th St., pavement marking & signage for a four lane divided road, traffic control, lighting, and tree removal/relocations. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination with other disciplines, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements. Review and respond to contractor provided shop drawings & RFI’s during construction. Check if project performed with current firmX 2016-2017 2017-2018 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCooper City Hall Parking Lot ImprovementsCooper City, Florida Project Manager & Engineer of Record for the design and permitting for the parking lot improvements to the Cooper City Hall parking lot located within Cooper City, FL. Design includes milling and resurfacing with overbuild to the existing parking lot, reconfigure the parking stalls to maximize the number of parking spaces within the existing parking lot, drainage improvement, grading, signing and pavement marking plans. Check if project performed with current firm STANDARD FORM 330 (REV. 8/2016) PAGE 2 NICHOLAS B. MAHON, PE UTILITY COORDINATOR 12 4 PE FLORIDA NO. PE78361 98 2014-2016 2016-2017 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDFronton Blvd Roadway Improvements Dania Beach, Florida Project Manager and Engineer of Record for Fronton Blvd Roadway Improvements from Dania Beach Blvd to NE 2nd St. Coordinate with design team for the development of construction documents to upgrade an undivided two lane road and replace with landscape median, roadway widening, sidewalk improvements to meet current ADA standards, pavement marking & signage for a 3 lane divided road, drainage modifications and lighting. Review and respond to contractor provided shop drawings & RFI’s during construction. Check if project performed with current firmX 2016-2018 2018-Present (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDAndrews Avenue Roadway Improvements Oakland Park, Virginia Project Manager & Engineer of Record for Andrews Avenue from Oakland Park Blvd to Prospect Drive. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, reconstruction of existing sidewalks to meet current ADA standards, add bike lanes, mid-block crossings for pedestrians, pavement markings & signage for a four lane divided road, and lighting. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination with other disciplines, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements. Check if project performed with current firmX 2016-2018 2018-Present (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDTamarac Bikeways Phase V & VITamarac, Florida Project Manager & Engineer of Record for NW 76th Street from University Drive to NW 70th Ave (Phase V), and NW 64th Avenue from NW 57th Street to Bailey Road (Phase VI). Coordinate with design team for the development of construction documents for the widening of the roadway to accommodate bike lanes and reconstruction of existing sidewalks to meet current ADA standards. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 2015-2018 2018 (1) TITLE AND LOCATION (City and State) g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDavie Road Phase 2 Corridor EnhancementsDavie, Florida Senior project manager for design for Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP) funded grant project requiring coordination and submittals to FDOT, including using their electronic review comment (ERC) system, as required due to the federal funding. Post Design services for this federally funded project required close coordination with the FDOT and CEI team. Check if project performed with current firmX 2016-2017 2017-2018 (1) TITLE AND LOCATION (City and State) h. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBamford Park Artificial Turf InstallationDavie, Florida Project Manager and Engineer of Record for the site improvements to convert two existing natural grass sport fields to artificial turf consisting of silt-film and to use a three layered heat reducing composite infill material of selected graded sand, S.B.R. crumb rubber or similar material and a top layer of composite material with heat reducing properties. The overall project included the design for installation of artificial turf and drainage system for Bronco and Mustang Fields, ADA compliant sidewalk improvements, grading and retaining wall design. The fields will serve multiple sports; Bronco field will have markings for Boy’s Football, full length soccer for 11vs11 (U13 onwards) and Men’s lacrosse; Mustang Field will have markings for full soccer for 11vs11 (U13 onwards), two small soccer fields for 9vs9 (up to U12) and full Men’s lacrosse. The project was permitted through the Central Broward Water Control District. Check if project performed with current firmX 99 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE UNIVERSITY OF MIAMI, CORAL GABLES, FLORIDA 1995B.S. IN ELECTRICAL ENGINEERING, UNIVERSITY OF MIAMI, CORAL GABLES, FLORIDA 1995B.S. IN APPLIED PHYSICS CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2012-2016 N/A (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMiddle Beach Recreational Corridor Lighting ProjectCity of Miami Beach, Florida Photometric design to determine fixture spacing and lighting levels on walkway. Conduct electrical lighting and power design for required beach walk between 46th and 64th Street Parks. Coordination with Florida Department of Environmental Protection to make sure the selected light fixtures are turtle friendly and meet their requirements. Conduct utility coordination to provide power to beach-walk project limits. Coordination with city in selection of turtle friendly light fixture. Approximate fees were $50,200.00 Check if project performed with current firmX 2015-2016 N/A (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity of Miami Beach Police Station Generator ReplacementCity of Miami Beach, Florida Provide Electrical Engineering services for the design and specification of emergency electrical system upgrades for the Miami Beach Police Station, Old City Hall, and 12th Street Parking Garage complex. Services to include the development and delivery of electrical construction plans. Generator and switchgear review, selection, and specifications development. Includes coordination with city maintenance personnel and project manager to select suitable generators and switchgear that meet the city’s requirements in terms of performance and budget. Also includes the development of technical specifications for the proposed electrical work and equipment including electrical general requirements, materials and methods, raceways, conductors, switchgear, grounding, and emergency system/generator. Approximate fees were $43,000.00 Check if project performed with current firmX 2015-2016 N/A (1) TITLE AND LOCATION (City and State) c.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMills Pond Park Soccer Field Lighting Updated ProjectCity of Fort Lauderdale, Florida The electrical scope of work for this project was to provide sports lighting for three soccer/lacrosse fields in an existing park. Approximate fees were $82,000.00 Check if project performed with current firmX 2015-2016 N/A (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDRice Neshap Utility Service Complex Emergency Generator Upgrade; City of Boca Raton, Florida Modify the exhaust system of the emergency generators to meet the requirements of the United States Environmental Protection Agency (USEPA) Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants (RICE NESHAP) Rule. This work order is to prepare construction plans and technical specifications for retrofitting six emergency generator engines and two high service pump engines with catalytic converters that will reduce the carbon monoxide emission levels to RICE NESHAP requirements. Approximate fees were $49,900.00 Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 JOSE A. JIMENEZ ELECTRICAL ENGINEER/LIGHTING DESIGN 22 1.5 100 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE BS, CIVIL ENGINEERING, FLORIDA STATE UNIVERSITY Mr. Gonzalez has over two years of full time civil engineering experience in stormwater, roadway, water, and wastewater projects in the South Florida area. Mr. Gonzalez also has two years of internship experience in civil design, and earned his Engineer in Training (EIT) Certification in August of 2015. Mr. Gonzalez has worked on utility coordination, project design, and data gathering and has assisted with construction administration such as responses to RFI’s, plan submittal reviews, and pay requisitions. Mr. Gonzalez is also a qualified Stormwater Management Inspector. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSW/SE Drainage ImprovementsHallandale Beach, Florida Managed utility coordination and locates for the project. Drafted stormwater management maintenance sheets. Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDProfessional ServicesTown of Surfside, Florida Assistance with the operation and maintenance of the Town's water, wastewater, and stormwater utilities. Provides regulatory monitoring and compliance services, such as CMOM, SSES, and NPDES reporting. Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDAquaguard Improvements TestingTown of Davie, Florida Gathered data on the collection capabilities of newly installed headworks screening systems for the Town of Davie in order to complete an evaluation report. Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDWTP Hypo and RecardCity of Pembroke Pines, Florida Designed pipe networks and selected pumps for the proposed pH sample system.Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSystem III CO2 InjectionTown of Davie, Florida Worked on pipe network design for the proposed CO2 Injection system.Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 RAINIER GONZALES, EI UTILITY COORDINATOR 3 2 ENGINEER INTERN CERTIFICATE NO. 1100020103 101 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.S.E.E. - OKLAHOMA STATE UNIVERSITY 1957 ELECTRICAL ENGINEERING Mr. Roush has been providing electrical engineering services for over 49 years. Mr. Roush is the Director of Electrical Engineering in the Fort Lauderdale office. His experience includes the marketing, quality control and design phase of electrical systems for transportation, commercial, industrial and institutional facilities. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2010 2011 (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity of Weston, Florida Roadway LightingWeston, Florida Converted citywide roadway lighting from metal halide luminaires to LED lighting and added 19 poles on Weston Road. Project included over 1200 luminaires and anticipated savings of over $250,000 annually. Check if project performed with current firmX 2015-2016 2017 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMills Pond ParkFort Lauderdale, Florida Installed a new primary distribution, transformer and secondary electric service and provided LED lighting for three new soccer fields. Check if project performed with current firmX 2015-2018 Ongoing (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMiami Beach Police Department Emergency System UpgradeMiami Beach, Florida Replaced paralleling switchboard, two 500 kW diesel generators, and the normal power emergency system switchboard. Check if project performed with current firmX 2017 2018 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCooper City Lift Station No. 21Cooper City, Florida Provided new electric service and a new Lift Station No. 21. These changes will provide street lighting, park, generator, and lift station experience. Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 ROBERT W. ROUSH, PE ELECTRICAL ENGINEER 49 12 PE FLORIDA NO. 20957 ELECTRICAL 102 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE ELECTRICAL ENGINEERING (1986)UNIVERSITY OF OKLAHOMA - NORMAN, OK Mr. Cervantes has 29 years of experience in designing lighting, power, mechanical and plumbing system for parks, manufacturing, commercial, residential and educational buildings, engineering project fee estimates, lighting consultant expert witness. His experience includes lighting verification and/or recertification of recreational parks, parking structures and outdoor parking areas. He is an expertise in AutoCAD. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL (1) TITLE AND LOCATION (City and State) a.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDPeabody HotelMemphis, Tennessee Involved in the expansion of the executive conference floor of the historic Peabody Hotel.Check if project performed with current firm (1) TITLE AND LOCATION (City and State) b.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDShelby County High SchoolMemphis, Tennessee Involved in the power and lighting design of the new Shelby County High School, a $12,000,000.00 project.Check if project performed with current firm (1) TITLE AND LOCATION (City and State) c.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLakeland Florida Tile PlantLakeland, Florida Involved in the expansion.Check if project performed with current firm (1) TITLE AND LOCATION (City and State) d.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBTS BuildingMiramar, Florida Designed lighting and electrical distribution.Check if project performed with current firm (1) TITLE AND LOCATION (City and State) e.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSensormaticPalm Beach County, Florida Designed lighting and electrical distribution.Check if project performed with current firm STANDARD FORM 330 (REV. 8/2016) PAGE 2 JORGE R. CERVANTES, PE ELECTRICAL ENGINEER 29 < 1 month PE FLORIDA NO. 45832 (1992) (1) TITLE AND LOCATION (City and State) f.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDH.R.S.Tallahassee, Florida Review of health care facilities.Check if project performed with current firm (1) TITLE AND LOCATION (City and State) g.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDRetail and Office SpacesThroughout Florida Design over 2,000,000 square feet of retail and office spaces.Check if project performed with current firm 103 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.S. LANDSCAPE ARCHITECTURE, TEXAS A&M UNIVERSITY COLLEGE STATION, 1987 Ms. Cook-Weedon leads the Landscape Architectural staff, has over 30 years of landscape architectural experience with demonstrated strengths in creative design, graphic presentations, and planting design. She has successfully completed numerous large-scale projects, which encompassed design studies, planting designs, natural area development and the various inter-related professions and tasks necessary to manage the projects through to completion. Ms. Cook-Weedon manages a staff of eleven at CGA where she provides scheduling, addresses CAD staffing and directs design issues as well as monitors budgets and serves on the Executive Management team. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL $134,000.00 (1) TITLE AND LOCATION (City and State) a.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDPineapple Grove Parking LotDelray Beach CRA, Florida Landscape Architect: Ms. Cook-Weedon was involved in the design and permitting of a 14-space parking lot in the Pineapple Grove Art District featuring pervious paver parking and pedestrian surfaces for the City of Delray Beach CRA. Check if project performed with current firmX $138,000.00 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSW 5th AvenueDelray Beach CRA, Florida Ms. Cook-Weedon served as project manager for this project, which involved the design of a new public parking lot between SW 5th Avenue and SW 4th Avenue. The parking lots are enhanced by native trees and shrubs and carpeted by pervious pavers. The design reduces pollution, energy costs and emission of greenhouse gases. The 24-space lot is a green design, consisting of pervious pavers, decorative LED lighting and low-volume irrigation. Check if project performed with current firmX $400,000.00 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSW 9th Avenue and StreetDelray Beach CRA, Florida This site will serve as a public parking for the local neighborhood and provide a pocket park. The 44-space lot is a green design, consisting of pervious pavers, decorative LED lighting and low-volume irrigation. The site provides a tot lot for the local community and includes both adult fitness equipment and children's play equipment. The design includes trash receptacles and a bike rack. Check if project performed with current firmX $800,000.00 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDelray Beach Fire Rescue Headquarters PlazaDelray Beach CRA, Florida Senior Landscape Architect. Designing and permitting improvements to pedestrian at the SE corner of the Fire Rescues Headquarters Building for the City of Delray Beach and the CRA. Project includes on the creation of a pedestrian plaza which will feature public art. A detention area will be resized to accommodate the plaza requiring the creation of retaining and seat wall to replace the lost water quality volume. Ms. Cook-Weedon provided assistant during the project construction. She addressed shop drawing reviews, RFI’s and provided frequent site visits to address issues with the contractor . Check if project performed with current firmX $65,000.00 (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLloyd Estate Pocket Park ProjectOakland Park, Florida CGA was responsible for the programming and design of the project site, conducting the necessary public outreach to gather Commission approval and coordinating important aesthetic and sustainable improvements with engineering needs of the project to address flooding issues throughout the neighborhood due to sea level rise. Also responsible for the conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements, and planting. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 TAMMY COOK-WEEDON, ASLA, RLA, LEED AP BD+C LANDSCAPE ARCHITECT 30+20 REGISTERED PROFESSIONAL LANDSCAPE ARCHITECT, FLORIDA NO. 0001328 104 $2.8 Million (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDeering Estate at Old CutlerPalmetto Bay, Florida Historical restoration and landscape design to repair the damaged areas of the estate following Hurricane Andrews devastation of the property, including detailed archeological planting design, habitat restoration and planting design for a new visitors’ facility. This site is located on the coast of Biscayne Bay in Miami Dade County and therefore required coastal permitting through FDEP and Miami Dade County. Check if project performed with current firmX $2.5 Million (1) TITLE AND LOCATION (City and State) g.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDHickory Point Recreational FacilitiesTavares, Florida Landscape Architect. The project consisted of the site design of a waterfront park that included marinas, boat ramps, wetland educational boardwalks, environmental signage, fishing stations and a communal pavilion. Check if project performed with current firmX $450,000.00 (1) TITLE AND LOCATION (City and State) h. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDania Cove ParkDania Beach, Florida CGA developed a waterfront park on an archeologically significant site in Dania Beach. The scope included designing a stabilization system for a badly eroded and unstable shoreline embankment along with vegetating the shoreline, and obtaining all required permits for the installation of the site features including a fishing dock and platform. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 105 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE BACHELOR LANDSCAPE ARCHITECTURE, BALL STATE-INB.S., ENVIRONMENTAL DESIGN, BALL STATE UNIVERSITY-IN Professional Associations: American Society of Landscape Architects Chairperson 1990 Broward Section; Florida Urban Forestry Council President 1999; Landscape Inspectors Society of Florida; International Society of Arboriculture CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2010 2011 (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDRoundabout at Taft Street and 40th AvenueHollywood, Florida Lead Designer – Prepared hardscape, landscape and irrigation design plans for a road closure and roundabout circle at the intersection of Taft Street and 40th Avenue in Hollywood. This project was in response for a need for traffic calming near the new Joe DiMaggio Children’s Hospital. Check if project performed with current firmX 2016 2018 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDavie Road Improvements – Phase OneDavie, Florida Lead Designer - Prepared landscape and irrigation design for the new medians as part of a road widening and complete streets project for Davie Road from Nova Drive to I-595. This included coordinating the relocation of several large Royal Palms from the roadway to a few nearby parks in the Town of Davie. Check if project performed with current firmX 2014 2017 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDPines Boulevard – Beautification Grants – Phase One & TwoPembroke Pines, Florida Project Manager, Lead Designer – Prepared detailed construction drawings and specifications for the landscape and irrigation improvements on two segments of Pines Boulevard east of the Florida Turnpike in Pembroke Pines. This included implementing two Florida Highway Beautification Council grants and obtaining all approvals of the plans from FDOT. In addition, a Design Variance was obtained for the preservation of several existing large Royal Palms located in the medians. Check if project performed with current firm 2010 2011 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBonaventure Boulevard and Blatt Road RoundaboutWeston, Florida Lead Designer - Provided landscape design and coordinated with traffic, electrical and civil engineering for a new roundabout. The project included the integration of landscape planting signage, branding, wayfinding, lighting, bicycle trails and pedestrian pathways. Check if project performed with current firmX 2011 2012 (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDN.W. 27th Avenue Streetscape Miami-Dade County, Florida Project Manager, Lead Designer - Developed a planting and irrigation design for the FDOT roadway through two cities and several districts. Mr. Conner was responsible for all permitting and coordination of several consumptive-use permits for varying zones through various segmented agencies and three municipalities, the implementation of City wayfinding and detailing specialty planting design to provide each city with their own character. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 MICHAEL CONNER, ASLA, RLA LEAD LANDSCAPE ARCHITECTURE 30+14+ REGISTERED LANDSCAPE ARCHITECTFL NO. LA0001181ISA CERTIFIED ARBORIST, FL NO. FL0777 2011 2012 (1) TITLE AND LOCATION (City and State) f.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMemorial Regional Hospital - 35th Avenue StreetscapeHollywood, Florida Lead Designer - Responsible for the construction detailing of hardscape components and planting for a streetscape design and wayfinding for a re-dedicated roadway segment to the hospital campus as part of this LEED-Gold project. Check if project performed with current firmX 106 2012 2014 (1) TITLE AND LOCATION (City and State) g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSE 17th Street Causeway (S.R. A1A) - Beautification GrantFort Lauderdale, Florida Project Manager, Lead Designer – Prepared detailed construction drawings for the landscape and irrigation improvements for the medians on S.E. 17th Street (S. R. A1A) just east and west of the bridge over the Intracoastal Waterway in Fort Lauderdale. This included implementing a Broward County Highway Beautification grant and obtaining all approvals of the plans from FDOT. The design featured several large Medjool Date Palms as part of the state of Florida’s new Bold Initiative program. Check if project performed with current firmX 2015 2017 (1) TITLE AND LOCATION (City and State) h. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSR A1A – Beautification GrantFort Lauderdale, Florida Project Manager, Lead Designer - Prepared construction drawings and bid specification for the landscape and irrigation improvements in the medians on S. R. A1A south of East Oakland Park Boulevard. This included implementing a Florida Highway Beautification Council grant and obtaining all approvals of the plans from FDOT. The design intent was to transform this section of S.R. A1A to a more updated look by removing some old existing Black Olive trees and planting mature Coconut Palms. Check if project performed with current firmX 2013-2014 2014 (1) TITLE AND LOCATION (City and State) i. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDDania Cove ParkDania Beach, Florida Project Manager, Lead Designer – Developed a custom design for 13 bus shelters along Weston Road with the city’s branded character, coordinated with Broward County Traffic Engineering and Transit agencies, constructed site design and ADA improvements, and prepared grant applications for funding of the project. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 2017 Ongoing (1) TITLE AND LOCATION (City and State) j. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDAndrews Avenue Improvements – Transportation Enhancement Grant; Oakland Park, Florida Lead Designer - Developed a new planting and irrigation design for the major improvements to the Broward County roadway through the City of Oakland Park as part of a Broward MPO Grant. Mr. Conner was responsible for all permitting and coordination of approvals through various agencies, as well as the City of Oakland Park’s review process. The design for the roadway includes new medians, reduced lane sizes, and new bike lanes in addition to the landscape enhancements. Check if project performed with current firmX 2009 2010 (1) TITLE AND LOCATION (City and State) k. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDManatee Isles Drive – Bike lanesWeston, Florida Project Manager, Lead Designer - Prepared site design for roadway improvements and the provision of bike lanes in response to increased demand generated by the Manatee Isles Elementary School, including tree relocation coordination, landscape planting and irrigation plans. Check if project performed with current firmX 2011 2012 (1) TITLE AND LOCATION (City and State) l.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDNW 183rd Street – Phase II BeautificationMiami Gardens, Florida Project Manager, Lead Designer - Prepared hardscape, landscape and irrigation design plans for a 1.78 mile long section of the FDOT roadway to enhance the existing landscape along the corridor and add a new irrigation system. Check if project performed with current firmX 2007 2009 (1) TITLE AND LOCATION (City and State) m.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDThree Village Road – Bike lanesWeston, Florida Project Manager, Lead Designer - Provided site design for roadway improvements and the provision of bike lanes in response to increased demand generated by Country Isles Elementary School, including public meetings, tree relocation coordination, stone retaining walls, landscape planting and irrigation plans. Check if project performed with current firmX 107 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE MIAMI DADE COMMUNITY COLLEGE, MIAMI, FLORIDA A.A. IN ARCHITECTURE Mr. Mendoza directs the landscape architectural staff in all code compliance and site design issues, ensuring that Quality Control and construction documents are consistent and thorough, while meeting location-specific permit criteria. He will contribute his expertise in leading and directing the production and development of construction permit plans and in site detailing for constructability. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2014 Ongoing (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMills Pond Park: Soccer/Lacrosse FieldsFort Lauderdale, Florida Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. Construction cost is estimated at $3.3 million, with completion scheduled for December, 2016. CGA’s fees: $379,000. Check if project performed with current firmX 2016 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSoccer Field Conversion at Weston Regional Park Weston, Florida The city of Weston will be converting two soccer fields to synthetic turf, these conversions will be the first of two park field conversions in the city. The selected synthetic turf option uses an organic infill material rather than the standard black rubber material. These fields will be cooled down with the use of long range rotors specifically designed for synthetic turf cooling & cleaning. Services included Civil Engineering as well. CGA’s fees: $350,000.00. Check if project performed with current firmX 2015 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDFootball Field Conversion at Cypress Bay High School Weston, Florida Prepared detailed site plans and irrigation plans for the conversion of an existing turf football field park to synthetic turf. The selected turf option is to use an organic fill material rather than the standard black rubber material. This required a cooling system and for cost saving a specialized booster pump with 4 custom ports where created in order to use a self-reeling watering wheel system. Services included Civil Engineering as well. CGA Fees: $100,000. Check if project performed with current firmX 2002 2006 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDVista ParkWeston, Florida CGA developed the master plan for Vista Park which is adjacent to Cypress Bay High School. With four soccer fields and four baseball fields, this park is well utilized by Weston residents as well as the high school. Special detailing of the edges of the fields were designed to address the clay and sod areas by creating header curbs to separate those areas. The design, construction documents and construction administration was provided by CGA. Cost: $5.5 million Check if project performed with current firmX 2012 Ongoing (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMiddle Beach Recreational CorridorMiami Beach, Florida Responsible for all irrigation design for a 2-mile long multi-use trail linear park to be constructed on State lands. The irrigation design is consistent with the City's standards for product selection, specification and maintenance. The system was designed for water conservation strategies and minimal impacts to the environment. CGA’s fees: $534,000. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 MARCOS MENDOZA LANDSCAPE ARCHITECT IRRIGATION/SITE DESIGN 24 20 108 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE MASTER OF ENGINEERING, UNIVERSITY OF FLORIDA, 2011B.S., CIVIL ENGINEERING, FLORIDA STATE UNIVERSITY, 2009 Mr. Kanelidis’ background experience encompasses site design, civil, geotechnical, surface water management, water, and wastewater services to both the private and public sector. He also had significant involvement with his prior firm in representing Sunshine Water Control District as District Engineer working on numerous Capital Improvements Projects. As a Project Manager at CGA, his responsibilities include preparing proposals and labor breakdowns, developing and managing project schedules, hydrologic and hydraulic modeling, executing quantity take-offs and cost estimates, preparing engineering plans and technical specifications, permitting, bidding assistance and bidder evaluations, construction project management, addressing Contractor RFI’s, reviewing shop drawings, negotiating and reviewing change orders, as-built reviews, and final project certifications. As an engineer with previous design and field experience, he is versatile in his ability to perform the tasks at each individual project stage. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2018 2018-Present (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDPines Village Water Main Replacement – Phase 1Pembroke Pines, Florida Project Manager for a residential project to replace 20,000 linear feet of undersized and corroded galvanized water main with new PVC and DIP piping. The buildup of rust in the existing mains resulted in numerous complaints about the water color and low pressure. The project also included relocating water meters to the front of the properties and replacement of private water services including dual check valves and the installation of a thermal expansion control device at the house connection. Approximately half of the existing water mains are located in the backyards of the single family residential properties. Along with relocating the water meters, they were also replaced to allow for future automatic meter readings (AMR’s). Project responsibilities included design, permitting, reviewing and incorporating Geotechnical findings, preparing quantity take-offs, cost estimating, preparation of technical specifications, addressing Bidder RFI’s and evaluation of bidders, and attending neighborhood meetings with the City to address resident questions and concerns. CGA is currently under contract to provide services during construction that include reviewing shop drawings, addressing RFI’s, conducting interim inspections, and final certification. Check if project performed with current firm 2014-2015 2015-2016 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLloyd Estates Residential and Industrial ImprovementsOakland Park, Florida Project Engineer for the design and modification of a stormwater conveyance system in order to improve flooding within the Lloyd Estates Neighborhood. The project included a stormwater pump station and floodgates for major storm events. New seawalls were designed and constructed downstream of the station that ultimately discharged to the ocean via the South Florida Water Management District (SFWMD) C-13 Canal. The pump station site provided means for erosion control that included rip-rap design. We also coordinated and assessed the environmental impacts with SFWMD and the Army Corps of Engineers (ACOE). In addition to stormwater discharge improvements, several areas included upgrades to the water distribution system for fire protection services. The project funding was driven by a FEMA grant. Project responsibilities included hydraulic modeling, design, review of construction plans, permitting, preparing quantity take-offs, cost estimating, preparing technical specifications, bidding assistance, shop drawing review, addressing RFI’s, reviewing change orders, and coordinating final certification. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 NICHOLAS W. KANELIDIS, PE CIVIL ENGINEER 7 4 PROFESSIONAL ENGINEER #78536CIVIL ENGINEERING, FLORIDA 2015 2015 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDNE 57th Street Water Main ReplacementFort Lauderdale, Florida Project Manager for a residential water main replacement project where water quality and age of the existing infrastructure were the primary issues. Approximately 1,850 linear feet of a new looped system with fire hydrants was designed and constructed. Project tasks included design, checking compliance with local and state standards, permitting, conducting routine construction inspections, and final project certification. Check if project performed with current firmX 109 2013-2018 2018-Present (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDNatalie’s Cove Drainage ImprovementsCooper City, Florida Project Engineer for the design and modification of a stormwater conveyance system for drainage improvements in the local neighborhood. A drainage model and analysis was conducted for the entire basin, and it was determined that significant improvements could be attained by increasing conveyance pipe sizes throughout the system. Also, stormwater level of service would be improved by increasing the existing lake storage capacity and by dredging along the bank to create wetlands on a littoral shelf. In addition to these stormwater improvements, the project consisted of roadway resurfacing and ADA compliance for pedestrian sidewalks. Project responsibilities included hydraulic modeling, design, permitting, addressing agency comments, preparing quantity take-offs, cost estimating, preparing technical specifications, and providing professional services during bidding. CGA is currently under contract to provide services during construction that include reviewing shop drawings, addressing RFI’s, construction inspections, and final certification. Check if project performed with current firmX 2015-2016 2016 (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLift Station No. 52 ReplacementCooper City, Florida Project Manager for a municipal sewer pump station replacement project. Improvements were needed due to the expiring service life of the pumps and their insufficient operating capacity during peak flows. Tasks included design, permitting, interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, monitoring geotechnical work, and coordinating with other professional disciplines. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 2014-2015 2015-2017 (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBid Pack 9 Infrastructure ImprovementsOakland Park, Florida Project Engineer during the construction phase of a large scale infrastructure improvements project that included replacement of three municipal lift stations, approximately 20,000 linear feet of water main, 5,600 linear feet of force main, and significant drainage improvements throughout the 500 acre site. Responsibilities included shop drawing reviews, attending progress meetings, engineering during construction, as-built reviews, reviewing change orders, and coordinating final certifications. Check if project performed with current firmX 2015-2018 N/A (1) TITLE AND LOCATION (City and State) g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBid Pack 8 Infrastructure ImprovementsOakland Park, FL Project Engineer for the water and sewer improvements project. Design included approximately 18,000 linear feet of water main replacement, 800 linear feet of new drainage with exfiltration trench, 2,500 linear feet of new sidewalk, rehabilitation of a sewer pump station, and installation of four sewer combination air valves (SCAV). The system upgrades consisted of replacing two and four-inch diameter water main with either six or eight-inch pipes. Additional fire hydrants were designed to adequately provide fire protection for the residential neighborhoods. In addition to these water main improvements and SCAV’s for the force main sewer transmission, the sewer pump station improvements were a critical component of this project. The station was experiencing failure due to extended run times because of an increase in the collected wastewater flows and discharge force main pressures. Electrical upgrades and the design of variable frequency drives were required to handle the various flow conditions. Project responsibilities included water main and hydrant design, preparing quantity take-offs, cost estimating, preparing technical specifications, permitting, and addressing Bidder RFI’s. Check if project performed with current firmX 2017-2018 2018 (1) TITLE AND LOCATION (City and State) h. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLift Station No. 9 RehabilitationDavie, FL Project Manager for a municipal sewer pump station rehabilitation project. The existing pumps failed when the mechanical room flooded with sewage backflow from the adjacent wet well. Since the station was being operated 24 hours/day by a portable diesel-powered bypass pump in a residential neighborhood, it quickly became a priority project for the Town. The project was unique in that the station is located within the City of Hollywood. Therefore, additional coordination was required between the two municipalities for permitting and construction scheduling. The project scope included site visit documentation, pump manufacturer coordination and specifications, sewer flow analysis, hydraulic calculations, ventilation system sizing, electrical and instrumentation, sump pump and piping replacement, cost estimating, permitting, preparation of contract documents for bidding, addressing Bidder questions, reviewing bids for award of contract, shop drawings reviews, addressing Contractor RFI’s, reviewing and negotiating change orders, construction inspections, and final project certification. Check if project performed with current firmX 110 2015-2017 2018 (1) TITLE AND LOCATION (City and State) i. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBayshore Drive Drainage and ImprovementsFort Lauderdale, FL Project Manager for the analysis and design of drainage system improvements in the Central Beach Alliance Neighborhood off of A1A. The scope included preparation of a drainage model of the existing site conditions by using ICPR and utilizing survey, record drawings, and LIDAR for calibration. A full drainage report summarized the different options for improvements in the area with associated costs. Some of the proposed alternatives included exfiltration trenches, drainage injection wells, and tidal check valves. Ultimately, the City asked us to design tidal check valves on the outfall pipes and additional stormwater structures and conveyance piping in areas with significant ponding. Additionally, the City requested traffic improvements and the addition of a median at the unique intersection of Bayshore Drive, Riomar Street, and Antioch Avenue. CGA conducted a traffic safety study to justify the proposed median and sidewalk layout. The intersection design included some re-grading for drainage, pavement markings, signage, and permitting through Broward County. CGA also provided typical services during construction including shop drawing review, addressing RFI’s, and coordinating final certifications. Check if project performed with current firmX 2015-2017 2017-2018 (1) TITLE AND LOCATION (City and State) j. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSewer Pump Station D-41 ReplacementFort Lauderdale, FL Project Manager for a municipal sewer main and pump station replacement project. Upgrades to the station’s operating capacity were needed due to excessive flows, frequent surcharging, and accommodation for future development sewer contributions. The scope entailed replacement and relocation of the existing station and redirection of the sewer conveyance network. Tasks included analysis of existing sewer flow contributions, review of existing force main pressures, hydraulic calculations for designing new force main and submersible pumps, valve vault design, electrical and instrumentation, permitting, coordinating with other disciplines including Geotechnical, preparing technical specifications, bidding assistance, addressing Contractor RFI's, reviewing and negotiating change orders, shop drawing reviews, routine inspections, as-built reviews, and final certifications. Coordination played a major role in this project as the proposed location for the pump station and design of the new sewer main had to be planned with the neighboring development and their design team. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 2015-2017 2017-2018 (1) TITLE AND LOCATION (City and State) k. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSewer Pump Station B-10 RehabilitationFort Lauderdale, FL Project Manager for a municipal sewer pump station rehabilitation project. Existing pumps were reaching the end of their service life, and the existing concrete wet well was consistently leaking into the dry station. Tasks included analyzing existing flow and pressure conditions, hydraulic calculations, specifying new pumps, new electrical and ventilation design, permitting, development of bidding documents, bidding assistance, addressing Contractor RFI's, reviewing shop drawings, conducting routine inspections, reviewing and negotiating change orders, as-built review, and final certification. Check if project performed with current firmX 2017-2018 2018-Present (1) TITLE AND LOCATION (City and State) m. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCroissant Park Small Water Main ImprovementsFort Lauderdale, FL Project Manager for a residential project to replace 16,000 linear feet of undersized and deteriorating water main with new PVC and DIP piping. Additionally, the existing piping did not provide proper fire protection to the neighborhood. Local residents were also filing complaints regarding water discoloration which was caused by corrosion of the existing cast iron mains. The project scope included design, permitting, reviewing and incorporating Geotechnical report findings, coordinating subsurface utility exploration for conflict resolutions, preparing quantity take-offs, cost estimating, preparing technical specifications, and addressing Bidder RFI’s. CGA is currently under contract to provide services during construction that include reviewing shop drawings, addressing Contractor RFI’s, conducting interim inspections, and final certification. Check if project performed with current firmX 2016-2017 2017-2018 (1) TITLE AND LOCATION (City and State) l. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLift Station No. 21 ReplacementCooper City, FL Project Manager for a municipal sewer pump station replacement project. The station is located within an HOA and required mechanical, aesthetic, and immediate odor control improvements. Due to its close proximity with adjacent residences and frequent complaints, the station was relocated across the street. This required a sewer conveyance, landscape, and irrigation redesign. Tasks included design, permitting, interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, preparing specifications, permitting, shop drawing reviews, addressing Contractor RFI’s, routine construction inspections, and final certification. Check if project performed with current firmX 111 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.S., CIVIL ENGINEERING, UNIVERSITY OF DAYTON, 2005 Mr. Messick’s experience includes both the private and public sectors of civil engineering. Responsibilities include general site development for public engineering projects, design of septic/lift stations, large scale stormwater management systems, sewage collection and transmission systems, and water distribution systems, along with the permitting of stormwater management systems, utilities and local roadway improvements to Florida Department of Transportation, Florida Department of Environmental Protection, and Florida Department of Health, along with applicable south Florida counties, municipalities and local agencies, and detailed experience with engineering services during construction.. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2014-2015 2016-2018 (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity Center Parking LotPembroke Pines, Florida Lead designer for parking lot to serve future City Center development in the City of Pembroke Pines, Florida. Parking lot modifications included driveway connectivity and roadway relocation to provide ease of access and reduce impacts from existing FPL transmission lines and associated power poles throughout previously permitted design. Project includes modifying drive aisles locations, parking lot reconfiguration, ADA accessibility, pavement marking and signage, and drainage modifications to previously permitting project. Project was construction with construction costs of 7.5 million and design fees of $354,000. Check if project performed with current firmX 09/2009-10/2015 Future (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBasin 5 Stormwater Master Plan, Phase IIDania Beach, Florida Project manager for initial design and permitting for the improvements contained in the recommendation of the Storm Water Master Plan of Basin 5, Phase II in the Dania Beach, Florida. Project consists of three duplex pump stations, more than 20,000 linear feet of high capacity storm sewer improvements to improve storm water conveyance, increase of discharge outfall structure efficiency and exfiltration trenches to improve area water quality. Mr. Messick leads to redesign of this project to provide a bio-swale located on county maintained tidal intercostal West Lake Park, and will reduce storm stages with the construction of the three duplex pumps. Phase II includes verifying existing utilities are not in conflict and providing upgrades to several intersections to meet ADA criteria. Total construction costs anticipated for this project are $12.2 million and engineering design fees of $405,000. Check if project performed with current firmX 12/2014-04/2015 06/2015-12/2015 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSW 17th St & SW 83rd Ave Roadway ImprovementsNorth Lauderdale, Florida As project manager, Mr. Messick was in charge of complete streets roadway design for this project located in the City of North Lauderdale, Florida. Project consists of lane widening and curb/gutter drainage for an existing undersized collector road, which provides access to two elementary schools and surrounding residential neighborhoods. Project improvements included de-mucking a portion of existing roadway, mill/resurfacing, roadway widening and ADA compliance sidewalk and driveway crossings for the heavy pedestrian traffic from the existing school. Design also includes converting an existing non-stop roadway intersection into a stop warranted raised intersection with school crossing. Permitting has been completed through North Lauderdale Water Control District, Broward County Traffic and City of North Lauderdale, and construction completed in early 2016. Project was awarded and construction for approximately $1.2 million with design fees of $78,000. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 JAMES MESSICK, PE WATER/SEWER ENGINEER 14 4 PE STATE OF FLORIDA NO. 70870 2014-2015 2015-2016 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLloyd EstatesOakland Park, Florida Assisted with the lift station outparcel for an improved stormwater management system to aid in the reduction of flood duration and elevation during storm events within the Lloyd Estates neighborhood. The improvements included a bioswale and typical driveway design. Grant services were provided for this project that resulted in approximately $4 Million of funding from the FEMA Hazard Mitigation Grant Program. Project was awarded for approximately $7.8 Million and is currently under construction and with professional civil engineering design fees of $888,000. Check if project performed with current firmX 112 12/2013-04/2018 07/2018-Present (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDNatalie’s Cove Drainage ImprovementsCooper City, Florida As Engineer of Record and Project Manager, Mr. Messick was in charge of complete drainage improvements to this local neighborhood in the City of Cooper City, Florida. After a basin wide drainage analysis, it was determined that significant improvements to level of service may be achieved by increasing conveyance pipe sizes from adjacent neighborhoods to existing stormwater management system. In addition to pipe upsizing, project includes increasing lake storage by the donation of wetland creation along eastern lake bank, roadway milling and resurfacing and ADA compliance for all surrounding pedestrian sidewalks. Permitting will be completed to both South Florida Water Management District and Central Broward Water Control Districts for modifications to existing drainage permits, with an estimated bid date of November 2016. Anticipated construction costs for drainage improvements are $2.3 million with design fees at approximately $226,000. Check if project performed with current firmX 2012-2014 01/2015-09/2015 (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBoca Bath and Tennis Water Main ImprovementsBoca Raton, Florida Mr. Messick is the direct lead designer of the proposed water main improvements project located in Boca Raton, Florida. This 4,000 linear foot ductile iron pipe replacement project included residential service design, milling and resurfacing of the asphalt along the length of pipe to be replaced. Services provided by James included preparation of construction documents and specifications, permitting to both local health department and utility agencies, bid assistance, and construction management. This project was completed on time and under budget in the summer of 2015. Project was construction for approximately 635,000 with design fees of approximately $103,000. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 01/2013-02/2018 N/A (1) TITLE AND LOCATION (City and State) g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBid Pack 8Oakland Park, Florida Engineer of Record for the water and sewer improvements project located within the City of Oakland Park. Design included approximately 18,000 linear feet of water main replacement, rehabilitation of lift station B-1 and installation of 4 sewer combination air valves (SCAV) to alleviate compressed air within the City’s sanitary sewer force main system. The water system upgrades consisted of replacing two (2) and four (4) inch diameter lines with either six (6) or eight (8) inch mains, and additional fire hydrants are spaced to adequately provide water pressure for fire protection of the existing residential neighborhoods. In addition to these water main improvements and SCAV for force main sewer transmission, lift station improvements are a critical component for this project. Lift Station B-1 was experiencing failure due to extended run times because of an increase in the collected wastewater flows and discharge force main pressure, electrical upgrades and the design of a variable frequency drive is included to handle various flow conditions. Project is currently slated for bid in summer of 2016 and construction to commence in early fall 2016. Total anticipated construction costs for this project are 4.7 million with approximate engineering fees of $366,000. Check if project performed with current firmX 06/2015-02/2017 06/2017-06/2018 (1) TITLE AND LOCATION (City and State) h. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSunflower Townhomes Water Main ImprovementsBoca Raton, Florida Mr. Messick served as the Engineer of Record for the City of Boca Raton Sunflower Townhomes Water Main Improvements project. His oversight of design for the small diameter water main replacement project played an important role, as the use of trenchless technologies will allow the contractor to navigate around heritage landscape trees while not impacting existing parking lot areas. With the use of HDPE and directional drilling, the replacement of approximately 4,500 linear feet of 2” and 4” water mains will be possible within existing utility easements. As this design criteria was established by the City of Boca Raton, Mr. Messick’s insight into this construction practice helped keep construction estimates within City of Boca Raton’s anticipated project budget. Permitting to the Palm Beach County Health Department is currently taking place, and advertisement for bid is anticipated in summer 2016. Total anticipated construction costs for this project are $673,000 with approximate engineering fees of $72,000. Check if project performed with current firmX 113 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.S. CIVIL ENGINEERING, FLORIDA INSTITUTE OF TECHNOLOGY Mr. McSweeney, PE, has more than 27 years of local experience in South Florida including permitting, design, project management, and construction administration. His main focus over the past 12 years has been in construction administration for municipal/governmental and private sector clients. This work has involved large scale FDOT roadway projects, utility and neighborhood improvement projects, and roadway reconstruction/traffic calming for multiple municipalities. Mr. McSweeney has the experience to serve the City of Weston, having served as a contract administrator for multiple continuing services contracts providing engineering service to municipal clients including the Town of Surfside, the City of Fort Lauderdale, the City of Pompano Beach, and the City of Deerfield Beach. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL Ongoing (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDTown of Surfside Miscellaneous Engineering Services Contract, Project Manager / Engineer-of-Record Project Manager/Engineer-of-Record for an ongoing town-wide infrastructure improvements project inclusive of sewer main and lateral rehabilitation/replacement; sewage pump station(s) rehabilitation; storm drainage system upgrades with new storm water pump stations; and water main and services replacements. Performing continuing services by providing general engineering, and consulting services to the municipality on an as needed basis. Perform review of development plans, utility plans and service upgrades; represent Town as Town Engineer and provide representation/liaison services; provide cost estimating, perform required permitting and assist in Capital Improvements determinations. CGA’s fees: $20,000/year annual contract. Check if project performed with current firmX 2010 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity of Pompano Beach Miscellaneous Engineering Services Contract, Contract Manager / Engineer-of-Record Contract Manager/Engineer-of-Record for the continuing services contract which provided general engineering, and surveying and mapping services to the municipality on an as needed basis. Projects provided under this contract included reclaimed/reuse water main, and force main design and construction administration, Pompano Beach Sidewalk Construction Program, facility assessment reporting, municipal pier renovation inspections, Broward County/Pompano Beach Branch Library site engineering design, and bridge and culvert improvements. CGA’s fees: $300,000. Check if project performed with current firmX 2010 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity of Deerfield Beach, FL, Miscellaneous Engineering Services Contract, Contract Manager Contract Manager/Engineer-of-Record of an ongoing continuing services contract providing as needed General Engineering, and Surveying and Mapping services to the municipality. Projects provided under the contract included: A-1-A “S-Curve” Beach Roadway and Beautification Redevelopment; Intersection improvement design of Goolsby and Hillsboro Boulevards; Intersection improvement design of Century and Hillsboro Boulevards; and Hillsboro Boulevard CEI Services. CGA’s fees: $400,000. Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) d.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSunny Isles Beach Pier Utility Improvements Sunny Isles, Florida Served as contract manager for the emergency design, permit, and replacement of a partially failed seawall located at the Intracoastal Park. The $1.5 Million project included the construction of two new precast concrete panel Seawalls along with required reprap remediation. Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDTown of Surfside Seawall Replacement Phase ISurfside, Florida Served as contract manager for the investigation, design, permitting, grant application, and construction of the $1 Million Phase I of the project. The project included the construction of five (5) new precast concrete panel seawalls throughout the Town. CGA was successful in obtaining a 50/50 grant match from F. I. N. D. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 ROBERT MCSWEENEY, PE CONSTRUCTION ADMINISTRATION 27 7 PE FLORIDA NO. 47506 114 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE BROWARD COMMUNITY COLLEGE, 1972UNIVERSITY OF MICHIGAN UTILITY MANAGEMENT COURSE, 1979 Mr. Bernard’s experience and education has been obtained through on the job training within related fields. Beginning with the plumbing trade in the early 1970s, he was able to progress to public and private utility plant and field operations work over ten years. He advanced to public sector management for twenty years. During his tenure in the public sector, Mr. Bernard gained knowledge of drainage concepts and installation, water and wastewater design and installation, roadway construction, and trail system management, and wetland requirements. He served for nine years as Department Director for Public Works and Capital Projects. Mr. Bernard gained experience in right-of-way maintenance, Capital Improvement construction and administration, and coordinating of projects through governmental agencies. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2013-Ongoing (1) TITLE AND LOCATION (City and State) a.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDMiromar Lakes Community Development DistrictFort Myers Florida Asset Manager for Miromar Lakes Community Development District. Provide excavation re-grading on lake bank slopes behind houses. Check if project performed with current firmX 2007 2011 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBay Harbor Island Community Improvements Phase 2 and 3Bay Harbor Island, Florida Roadway improvements including new water mains, water service connections, replacement of valley gutter and curbing, roadway and parking space reconstruction, pavement overlay and markings. CGA served as owner representative on the projects. CGA’s fees : $1.21 million. Check if project performed with current firmX 2008 2013 (1) TITLE AND LOCATION (City and State) c.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDInfrastructure RehabilitationSurfside, Florida Engineer’s field coordinator for water and sewer roadway and drainage improvements. Project included milling and overlay of 90% of Surfside. CGA’s fees: $1.543 million. Check if project performed with current firmX 2009 2010 (1) TITLE AND LOCATION (City and State) d.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBay Harbor Islands - 92nd Street ParkBay Harbor Island, Florida Designing and construction services for passive park, dog park, fitness stations, parking lot, curbing, irrigation, landscaping and site lighting. CGA’S fees: $ 88,000. Check if project performed with current firmX 2011 2014 (1) TITLE AND LOCATION (City and State) e.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCollege Ave Roadway ImprovementsDavie, Florida Roadway widening with medians, irrigation, landscaping, drainage reconstruction and lighting improvements. CGA’s fees: $260,000. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 BRUCE BERNARD OPERATION MANAGER/FIELD SUPERVISOR 44 12 CERTIFICATE OF TRAINING-DISASTER RECOVERY• Disaster Debris Management• FEMA Emergency Management• Utility Terrorism Preparation and Response• Asphalt Pavement Maintenance• Licensed in Water and Wastewater Plant Operations 2016 2017 (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDBal Harbour Sanitary ImprovementsBal Harbour, Florida CGA construction division provided owner’s representative services for this project. CGA’s fees: $110,000.Check if project performed with current firmX 115 2017 2018 (1) TITLE AND LOCATION (City and State) g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity of Fort Lauderdale Loymeyer Wastewater PlantFort Lauderdale, Florida Inspection services for City for installation of new yard piping on Phase 1 Project to replace aging infrastructure as owners representative. CGA's fee's $225,000. Check if project performed with current firmX 2017 2018 (1) TITLE AND LOCATION (City and State) h. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDCity of Pembroke Pines Water Plant Ion ExchangeCity of Pembroke Pines, Florida Inspection services to refurbish Ion Exchange units and install new unit piping and valves as owners representative, CGA fee's $45,000 Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 116 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE BSLS, PURDUE UNIVERSITY, 1984, LAMBDA SIGMA: LAND SURVEYING HONORARY Mr. Watts has over 33 years of experience as a Professional Surveyor and Mapper registered in the State of Florida, Having spent his entire surveying career working in Broward County, he is extremely knowledgeable of the rules, requirements and has the experience in providing surveying and mapping services to South Florida municipalities. He specializes in public work and engineering design type surveys, land acquisition, easements, title research, and computer mapping. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL Ongoing $45,000.00 (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping ServicesNorth Lauderdale, Florida Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for the City of North Lauderdale. Additional responsibilities include project surveyor for the topographic survey of the municipal complex, GIS, water control district and utility mapping, Hampton Pines Park and Silver Lakes Middle School ball field renovation. Check if project performed with current firmX 2015 $75,000.00 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping ServicesFlorida Power & Light Boundary and Topographic Surveys for FPL Boxcar Substation, Boundary Survey of Northwest Service Center - FPL surplus property. Construction stake out of 55 proposed pole locations in Palmetto Bay, Florida. Boundary & Topographic Survey for Port Everglades\Eller Sub-Station Site. Check if project performed with current firmX 2010/2011 $6,000.00 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDPublic Works/Facility Management CompoundCity of Coconut Creek, Florida As-Built and Engineering Design Survey for new Public Works Building; Boundary & Topographic Survey, Legal Descriptions, FEMA Flood Elevation Certificates for proposed and finished construction. Check if project performed with current firm 2014 $125,000.00 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping ServicesPompano Beach, Florida Boundary and Topographic Surveys: Community Park, Canal Point Park, Legal Descriptions: Avondale Fishing Piers; Topographic Surveys: Pompano Beach Air Park; Taxiway “N” – Pavement Widening, Runway 15-Runway Protection Zone, Magnetic Headings Runways 6-24, 15-33, 10-28 Check if project performed with current firmX 2014 $25,000.00 (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping ServicesCoral Springs, Florida Boundary, Topographic and Design Surveys: City Hall North, NW 85th Ave., NW 95th Ave., Shadow Wood Blvd. Remsberg Dr., Westside Maintenance Facility, Wiles Road Terminus Linear Park. Sketch & legal Descriptions: Pedestrian Easements Coral Springs Medical Center. Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 STEVE WATTS, PSM SURVEY AND MAPPING 33 4 FLORIDA PSM NO. 4588 117 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE MIAMI DADE COLLEGE Mr. Dominguez has 18 years of experience as a surveyor and mapper. Having spent his entire surveying career working in South Florida, he is extremely knowledgeable of the rules, requirements and specifications for completing surveying and mapping projects in the South Florida area. He specializes in Digital Terrain Mapping (DTM) type surveys, design surveys, right of way surveys, hydrographic surveys, 3D laser scanning surveys as well as construction stake out projects, land acquisition and computer mapping. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2013 (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGIS SystemKey West, Florida Location of all power poles and transformer pads belonging to Keys Energy between mile marker 1 (Key West) thru mile marker 40 (Big Pine Key) along US-1 and community roads for purpose of GIS map also including Tank Island. Utilizing GPS Handheld and GPS RTK instruments. Check if project performed with current firmX 2012 (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping Services Pompano Beach, Florida Location and elevations of all drainage structures within the city of Pompano Beach including inverts, pipes and boxes material and sizes for drainage study to improve drainage system. For the city of Pompano Beach, FL. Check if project performed with current firmX 2009 (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping Services Miami Beach, Florida 3D laser scanning of Fontainebleau Hotel interior and exterior walls for the purpose of generating civil plans to refurbish the historic look. Check if project performed with current firm 2008 (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping Services Marathon, Florida Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures, measure inverts, check cross sections along US-1 for FDOT. Check if project performed with current firm 2006 (1) TITLE AND LOCATION (City and State) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping Services Islamorda, Florida Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures, measure inverts, check cross sections along US-1 for FDOT. Check if project performed with current firm 2004 (1) TITLE AND LOCATION (City and State) f. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDGeneral Surveying & Mapping Services Miami Beach, Florida Locate right of way corners and all above ground improvements along Harding Ave and Collins Ave including 25’ beyond right of way using the Electronic Field Book (EFB) DOS Base for the purpose of a three dimensional surface. Also performed the same task for 71 Street in Miami Beach Check if project performed with current firm STANDARD FORM 330 (REV. 8/2016) PAGE 2 PABLO DOMINGUEZ SURVEY AND MAPPING 18 < 6 N/A 118 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for Each key person.) 19. RELEVANT PROJECTS 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE B.A. ARCHITECTURAL STUDIES (1991)MASTER OF URBAN PLANNING (1993) Silvia is a professional planner with 25 years of public and private sector experience in community planning and design. Silvia holds a Bachelor’s degree in Architectural Studies and a Master’s degree in Urban Planning from the University of Kansas. Silvia’s practice focuses on helping local governments design and execute creative planning processes to engage their stakeholders. Silvia’s work includes many comprehensive and strategic plans; visioning, neighborhood, district, downtown and corridor plans; grant preparation; parks and recreation master plans; institutional campus master plans; and site-scale planning. Her efforts have been recognized with numerous awards and speaking opportunities. Silvia is actively engaged in advancing the planning profession through APA, both locally and nationally. She currently serves a 4-year term on the AICP Commission. She is also a member of ULI’s Women’s Leadership Initiative (WLI), and has consulted as an expert to The American Architectural Foundation’s Sustainable Cities Design Academy. CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL 2012 N/A (1) TITLE AND LOCATION (City and State) a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDSt. Charles Parish Parks + Recreation Master PlanSt. Charles Parish, Louisiana Closely following the adoption of the “Bridge to the Future” 2030 Comprehensive Plan (which she also led), Silvia helped St. Charles Parish develop their first parks and recreation master plan. The goals were to build on Bridge to the Future’s vision of an efficient, cohesive, interconnected system of parks and open spaces, and to give the parish a framework for strategic, equitable decision-making about parks and recreation. One of the challenges was to reduce a disproportionate fiscal burden caused by the need for duplicate facilities, equipment, programming and personnel on each side of this river parish. The master plan included an objective evaluation and prioritization framework for existing park sites based on factors of accessibility, utilization, and recreation value. The master plan recommended that the parish consider disposing of lowest ranking sites by exploring lease terminations or ownership/maintenance transfers (e.g., to homeowners’ associations). The plan also shifted the parish’s focus to the provision of fewer larger, more centralized community or large neighborhood parks rather than many smaller, scattered neighborhood parks or pocket parks. Immediate site opportunities and future target areas were identified, based on the 2030 Future Land Use Map. Role: Project Manager/Planner/Facilitator; Cost: $79,000 Check if project performed with current firmX 2012 N/A (1) TITLE AND LOCATION (City and State) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDOff-Highway Vehicle Trails Feasibility StudyMiami-Dade County, Florida Silvia served as Project Manager for an ambitious effort by Miami-Dade County to identify possible locations for an off-highway vehicle (OHV) trails facility. In the aftermath of several accidents in which OHV drivers were injured while riding their OHVs on the street, due to the lack of dedicated facilities, the OHV-enthusiast community clamored for the County to help provide a safe environment for their activity. In the study, Silvia and her team studied best national practices for OHV-trail facilities, developed a set of criteria for identifying and ranking sites, and then proceeded to apply the criteria to find, characterize and rank 15 sites publicly owned throughout Miami-Dade County. The long list was further narrowed by applying a second tier of criteria, as well as though the input of stakeholders in the public engagement process. The stakeholder engagement, which required a great degree of tact, included multiple OHV-enthusiast organizations, various County and external agencies, and property owners adjacent to the sites. Role: Project Manager/Planner/Facilitator; Cost: $ 98,000 Check if project performed with current firmX 2014 N/A (1) TITLE AND LOCATION (City and State) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDPlanLafayette Small Area PlansLafayette, Louisiana Concurrent with the preparation of a new parish-wide comprehensive plan, Silvia led the creation of three small area plans which provided a template for planning in urban, suburban and rural parts of Lafayette Parish. The plans were based on public input gathered during design charrettes conducted with stakeholders from each small area. Each plan includes urban design principles, proposed land use, connectivity opportunities, mobility improvements, open space plans, and a proposed street section. Role: Project Manager/Planner/Facilitator; Cost: $49,000 Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 SILVIA VARGAS, AICP, LEED AP PUBLIC INFORMATION OUTREACH 25 < 1 Year AICP, 1997 (087875)LEED AP (2002) 119 2017 N/A (1) TITLE AND LOCATION (City and State) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETEDLand Use Plan, Major Street Plan and Ordinance UpdateCity of Mobile, Alabama In 2015, the City of Mobile completed “Map for Mobile: Framework for Growth.” This plan suggests that the City’s Zoning Ordinance and associated documents must be revised or replaced to create the development policies and regulations necessary to implement the vision identified during the planning process. Silvia assisted Mobile in updating the City's Future Land Use Map and the Major Street Plan, which provides guidance for right-of-way dedication during subdivision and rezoning approval processes. Neither document had been replaced in almost 50 years, and had only be amended in piece-meal fashion. The update process involved a series of technical agency and stakeholder engagements designed to (1) ascertain the alignment of current plans and policies with Map for Mobile; (2) identify investment and capital priorities; and (3) formulate a long-term land use pattern and linked transportation network to help the City meet the Map for Mobile mandate, while informing the zoning and LDR update. Silvia worked with the consultant team to design new or revise existing zoning districts and development regulations, consistent with the new FLUM and MSP. Role: Professional in Charge/Facilitator Cost: $32,000 Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) PAGE 2 120 20. EXAMPLE PROJECT KEY NUMBER 2012 Ongoing F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)01 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDSAGE BEACH - OFFSITE ROADWAY IMPROVEMENTS; CITY OF HOLLYWOOD, FL Property Markets Group CGA was retained by PMG Driftwood LLC to provide civil site planning, permitting, and preparation of Construction Documents for two new residential towers located on Iris Terrace, east of SR A1A in Hollywood, FL. The project consisted of civil site as well as the offsite improvement within City R/W and CRA jurisdiction on Iris Terrace, South Surf Road and Jasmine Terrance. The roadway was regraded in order to tie into the new, higher finish floor elevations required. New sidewalk, landscaping, lighting, underground utilities and drainage were included in the complete roadway reconstruction of the adjacent streets. CGA provided the “utility layout” sheet which incorporated the design from each of the utility providers and put them on one plan sheet with the other roadway, drainage, water and sewer improvements shown in order to verify horizontal and vertical clearances as well as fit the required equipment within the right-of-way. A Surface Water Management License for the new facilities was obtained from Broward County Environmental Resources and Growth Management Department for the work within the City’s R/W requiring approximately 250 LF of exfiltration trench under the roadway. Two FDOT permits were also required to complete the streetscape improvements where Iris Terrace intersects SR A1A. An FDEP drainage well permit was obtained in order to install two drainage wells, one for each of the two buildings. The services provided were completed in a timely manner and under budget. The project is currently in the final stages of construction. Firm’s fees: $180,250 Aaron SinnesConstruction Director 305.917.1070 Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Civil Site Planning, Permitting, Construction Documents b. c. d. e. STANDARD FORM 330 (REV. 8/2016) PAGE 3 121 20. EXAMPLE PROJECT KEY NUMBER 2010-2013 2013 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)02 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDUTILITY REHABILITATIONSURFSIDE, FLORIDA Town of Surfside Calvin, Giordano & Associates, Inc. (CGA) managed the Utility Rehabilitation Project from start to finish. The project consisted of investigating the existing potable water, storm sewer and sanitary sewer systems while identifying and performing cost benefit analyses on each required improvement. The potable water system investigation included fire flow analysis, coupon sampling and as-built review. The new system was designed to increase / maximize available fire flow, and replace deteriorating or known problem areas within the existing system. The project also relocated the back of yard water services and meters with front yard services which included AMR (microwave readable) water meters, which resulted in a operating cost savings to the Town. Service sizes were increased to provide for both domestic and landscape water meters thus allowing for a savings to the water charges. The final design included the replacement of over 32,000 LF of water main, 1,587 water services, 1,278 new water meters and 46 additional fire hydrants. The sanitary sewer system analysis included video analysis of the existing gravity system, Inflow/Infiltration (I/I) testing, and a review of water consumption vs sewage transmission. Based on the system analysis and facility design life, over 50,000 LF of sanitary sewer main was CIPP lined or replaced. In addition, the Town’s two (2) sewage pump stations were completely rebuilt with updated and more efficient pumps including SCADA controls. The force mains from the pump stations to the shared transmission main were also replaced. The Town has observed the post construction reduction in I/I has reduced their monthly sewage transfer and disposal costs by over 30%, thus bringing the Town back into compliance with the County issued Consent Decree. The storm sewer system was upgraded to include three (3) SCADA controlled pump stations, nine (9) shallow injection drainage wells, twenty (20) control structures and the required RCP pipeline to interconnect the existing gravity drainage system with the newly installed pumped well system. Recent analysis has shown that the utilization of pressure wells has reduced the TMDL discharge into Biscayne Bay by 90%. The reduction in TMDLs was a key requirement in obtaining the over $1Million in FDEP grant funding. CGA also administered the installation of over 45,000 LF of curb and gutter replacement as well as 167,000 SY of asphalt roadway resurfacing. CGA assisted the Town by obtaining the required funding for this project, which included the Miami Dade Building Better Communities General Obligation Bond, FDEP Grants, Regions Bank publically bid bond issuance and the FDEP’s State Revolving Loan Program. Construction Cost: $20,000,000.00Firm Fee's: $1,700,000.00 Guillermo OlmedilloTown Manager 305.861.4863 Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Prime b. c. STANDARD FORM 330 (REV. 8/2016) PAGE 3122 20. EXAMPLE PROJECT KEY NUMBER 2014 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)03 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDNE 3rd Avenue and Artists Alley - Streetscape Paving Design; Delray Beach, FL Delray Beach CRA CGA has just completed the conceptual design and engineering for an important streetscape branding project in Delray’s CRA. The objective of the design is to serve as a passive drainage strategy, while communicating a strong identity of the Pineapple Grove neighborhood. The streetscape is envisioned as an important component to the revitalization efforts of the area with the future construction of an abutting artist’s incubator facility. The NE 3rd Avenue streetscape & Artist Alley will serve as the venue for future artists events and weekend fairs. The project has completed its public outreach phase and is presently in design development and engineering. It is programmed to be constructed in the first half of 2015. The project encompasses NE 3rd Avenue between NE 3rd Street and NE 4th Street; NE 3rd Street between NE 2nd Avenue and the railroad tracks; and Artist Alley between NE 3rd Street. The intent of this project is to continue the design aesthetics established for the rest of the public realm areas within the Pineapple Grove District with the goal of promoting the resurgence of an eclectic mix of galleries, restaurants, cafes and boutiques, but with a strong focus on exciting public artwork and working artist galleries and workshops. As an emerging arts area, Artist Alley is made up of an authentic and thriving working colony of accomplished artists collaborating to inspire artistic expression, incubate new artist and create innovative art work. Timothy T Tack, PEtack@mydelraybeach.com 561.243.7315 Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Prime - Landscape Architecture, Hardscape Design, Surveying, Civil Engineering, and Electrical Engineering b. c. d. e. STANDARD FORM 330 (REV. 8/2016) PAGE 3123 20. EXAMPLE PROJECT KEY NUMBER 2015-Ongoing N/A F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)04 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDTamarind AvenueWest Palm Beach, FL City of West Palm Beach Suzanne Berglund, PE, Engineering Manager 561.494.1075 Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Prime b. STANDARD FORM 330 (REV. 8/2016) PAGE 3 Calvin, Giordano & Associates, Inc. CGA was retained by the City of West Palm Beach to provide all of the civil engineering and landscape architecture services for its ambitious Tamarind Avenue Streetscape Project. This twophase project will add bicycle and pedestrian improvements as well as drainage and utility improvements to 0.7 miles of Tamarind Avenue in the City of West Palm Beach. The streetscape improvements are LAP funded (the LAP Phase). The underground utility improvements are funded by the Town (the Utility Phase). The project was split into two construction contracts to facilitate the LAP funding schedule. The first project to be constructed will be the underground improvements which include the replacement of 90 year old clay drainage pipes, installation a new 24” water main on 7th Street, and the replacement of 90 year old shallow clay sewer mains. This project will also remove the 90 year old concrete base below the roadway which was originally constructed in concrete in 1927 and then overlaid with asphalt over the years to be between 4 and 11 inches thick. The 90 year old cracks in the concrete have reflected in the roadway surface and this will all be replaced. The LAP Phase includes an overlay of the 0.7 mile of roadway, the addition of sharrow bicycle accommodation, concrete sidewalks on both sides of the roadway, decorative pavement features, pedestrian crossings, on-street parking, signing and pavement marking layout and improvements to the turn lanes at both ends of the project. Other improvements included extensive landscaping, pedestrian level street lighting. Services provided by CGA included civil engineering, landscape architecture, and surveying. 124 20. EXAMPLE PROJECT KEY NUMBER 2011-2013 2013 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)05 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDNEWPORT FISHING PIERSUNNY ISLES BEACH, FLORIDA City of Sunny Isles Beach The City had already completed several CIP projects with CGA, so when it came time to select the turn-key Project Managers for the Newport Fishing Pier demolition, design, permitting and reconstruction, CGA was again selected. The design and permitting of the pier required coordination with FDEP, DRER, USACE, USCG, MD Fire Department and the City’s building department. The scope of work also included site inspections, vibration & settlement monitoring, and the administration of all budgets, claims, change orders, RFI and contract addenda. After successfully permitting the pier, CGA managed the demolition of the existing pier and the construction of the 776-foot long pier, which included a 6,200 sf restaurant and second story lifeguard office and observation tower. The pier decking was placed atop 24”x24” precast-driven piles. The project also required the design, permitting and installation of new utility lines from Collins Ave. CGA is proud to announce the Newport Fishing Pier opened on time and $127,000 under budget with a grand opening party being held on the pier on June 16, 2013. Aerial footage of Newport Fishing Pier: http://www.calvin-giordano.com/cga-videos/ Construction Cost: $4,000,000.00Firm Fee's: $467,000.00 Bill EvansAssistant City Manager 305.947.0606 Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Prime b. c. d. STANDARD FORM 330 (REV. 8/2016) PAGE 3 125 20. EXAMPLE PROJECT KEY NUMBER 2011-2018 2018 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)06 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDSUNNY ISLES BEACH NORTH BAY ROAD BRIDGE; SUNNY ISLES BEACH, FLORIDA City of Sunny Isles Beach CGA was retained by the City of Sunny Isles Beach to survey, design, permit, and administer the construction of the North Bay Road Bridge, spanning a canal between 174th St. and 172nd St. along North Bay Road. The principal function of the bridge is to provide pedestrian access across the canal. The proposed 263’ span will also provide access across the canal to emergency vehicles as a bypass to Collins Ave. during periods of heavy traffic congestion. The project included several work efforts adjacent to the bridge, including the construction of an observation deck in Town Center Park, located at the eastern end of the canal, and a boardwalk connecting the deck to the North Bay Road bridge. Associated drainage, roadway, utility, and hardscape improvements were made along 174th St. and 172nd St. to account for the increased drainage and other impacts to the surrounding infrastructure. The project involved intensive coordination with regulatory agencies, utilities, government entities, and local stakeholders. The CGA team was able to procure all necessary permits to conduct the work on schedule. CGA provided construction engineering and inspection services throughout the duration of construction, which was completed in early 2018. Construction Cost: $7.8 MFirm Fee's: $1.2 M Elka Linton-DorsettCIP Program Manager 305.792.1939 Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Prime b. c. d. e. STANDARD FORM 330 (REV. 8/2016) PAGE 3 126 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 29. EXAMPLE PROJECTS KEY NUMBER 1 3 2 4 5 NUMBER 6 8 7 9 10 TITLE OF EXAMPLE PROJECT (From Section F) Sage Beach - Offsite Roadway Improvements NE 3rd Avenue and Artists Alley - Streetscape Paving Design Surfside Tamarind Avenue Newport Fishing Pier TITLE OF EXAMPLE PROJECT (From Section F) Sunny Isles Beach North Bay Road Bridge G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)1 52 63 7 948 10 X XCurt A. Keyser, PE Project Manager X XJenna Martinetti, PE Roadway/Drainage Engineer XMohammed Sharifuzzaman, PE Roadway/Drainage Engineer XMatthew Iles, EI Roadway/Drainage Designer X XXXRobert W. Roush, PE Electrical Engineer Jorge R. Cervantes, PE Electrical Engineer XXXTammy Cook-Weedon, ASLA, RLA, LEED AP BD+C Landscape Architect Michael Conner, ASLA, RLA Lead Landscape Architecture X XMarcos Mendoza Landscape Architect Irrigation/Site Design Nicholas W. Kanelidis, PE Civil Engineer X XJames Messick, PE Water/Sewer Engineer X XRobert McSweeney, PE Construction Administration X XBruce Bernard Operation Manager/Field Supervisor X XNicholas B. Mahon, PE Utility Coordinator XXXJose Jimenez Electrical Engineer/Lighting Design Rainier Gonzales, EI Utility Coordinator XSteve Watts, PSM Survey and Mapping Pablo Dominguez Survey and Mapping Silvia Vargas, AICP, LEED AP Public Information Outreach STANDARD FORM 330 (REV. 8/2016) PAGE 4 127 128 129 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)130 Richard C. Wohlfarth, P.E. Dir. of Engineering/ Principal-In-Charge 32 27 Nutting Engineers of Florida, Inc., Miami, Florida University of Florida - B.S. Civil Engineering Florida Professional Engineer #50858 Registered Building Inspector BN #3580 SBCCI #6528 ACI Level 1, UBCI Florida Engineering Society- Past Chapter President, National Society of Professional Engineers, Treasure Coast Builders Association, American Red Cross First Aid & CPR Certification Miami-Dade County, Florida (Qualification Based Contract), Multiple Depts. inc. DERM, Public Works, Parks & Rec., Aviation, Fire Rescue, ongoing since '00 ongoing Performing geotechnical exploration/engineering, construction materials testing and/or inspection services per a qualification-based continuing service contract. Projects include MIA multiple concourses-new, reconstruction, repairs and multiple runway repair, North Terminal Program, various parks and marinas inc. Halley Park Marina, Sunny Isles Fire Rescue Building, multiple road and drainage improvements. City of Miramar, Florida, Various Departments ongoing ongoing Provide geotechnical engineering, construction materials testing and inspection services per a qualification based continuing service contract. Projects include the City of Miramar Overflow Parking Facility, Fire Station #107, Police Department, East Miramar fire hydrant and line improvements, Old City Hall site, Ansin Sports Complex, Miramar Multi-Service Center, numerous parks and infrastructure improvement projects. City of Miami, Florida (via Consultant), SW 15th Avenue Drainage Improvements 2016 2016 Performed geotechnical exploration/engineering services for the design of hardscape/ landscape improvements and redesign of drainage along SW 15th Avenue. South Florida Water Management District, Florida, Multiple Sites ongoing ongoing Recent projects include the G-87 replacement, the G-13 culvert replacement and the G-103 Weir replacement with gates. Gates and culvert replacements in Miami-Dade, Broward, Palm Beach and Osceola County. Qualification based continuing contract since 2007 for geotechnical engineering, construction materials testing , special inspection services. City of Coconut Creek, Florida, Various Projects ongoing ongoing Providing geotechnical engineering and construction materials testing services for various project throughout the City including storm drain improvements, water mains, various roadway projects, crosswalk repairs, NW 76th Place bridge, C-5 Canal widening, Lyons Road median enhancement, Hosfort Park, Sable Pines Park ballfield improvements, County turn around, Lyons Gate, and NW 39th Street reclaimed water station. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS STANDARD FORM 330 PAGE 2(REV. 3/2013) a. b. c. d. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm 131 Stephen J. Mrachek, P.E. Project Manager/Engineer 14 1 Nutting Engineers of Florida, Inc., Port St. Lucie & Boynton Beach, Florida University of Florida - B.S. Civil Engineering Florida Professional Engineer (PE) #70784 USACE Quality Management for Contractors Certification #36236 Qualified Stormwater Management Inspector 10 Hour OSHA Construction Safety and Health Homestead WWTP Influent Pump Station, Homestead, Florida 2017 Performed geotechnical exploration/engineering services for the secondary evaluation of existing soils for construction of a new influent pump. Nicklaus Children's Hospital, Miami, Florida 2017 Performed geotechnical exploration/engineering services for the construction of a new electrical room. The electrical room will be constructed on a combination of the existing ground floor slab and newly constructed monolithic slab on grade with non-load bearing CMU infill exterior walls. Palmetto Senior High School, Miami-Dade County Public Schools, Florida (Qualification Based Contract) 2017 Performed geotechnical exploration/engineering services for the phased demolition and construction of a new single-story cafeteria building, single-story classroom building, single-story black box theater building, three-story classroom building, landscape area and other related improvements. Mills Pond Park, Fort Lauderdale, Florida 2017 Performed supplemental geotechnical exploration/engineering services for the construction of new soccer and lacrosse fields, parking areas, associated light standards, and a 4 FT high retaining wall. U.S. Army Corp of Engineering, Various Locations, Florida 2013 Performed construction materials testing services for various Army Corp of Engineering projects including but not limited to: Dredge material management area 641A, Palm Beach County; replacement of culverts FC1 and HP7 Herbert Hoover Dike, Glades County; Kissimmee River public use area S-65 D boat ramp, Okeechobee County. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS STANDARD FORM 330 PAGE 3(REV. 3/2013) a. b. c. d. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm 132 Miami Dade County, Florida, Qualification Based Continuing Contract - Public Works Departments, Various Projects 2000 - Present ongoing Miami Dade County Public Works Tyrone Brown/ Joaquin Menendez 305-876-0529/ 305-876-0529 This CCNA continuing services contract is one of our many continuing services contract. Since 2000, we have performed environmental services (Phase I/II Environmental Assessments), geotechnical exploration and engineering, construction materials testing and inspections as well as special/ threshold inspections to various department of Miami Dade. Project under this contract for the Public Works Department include but are not limited to: 2018 - Sanitary Sewer Connection at Blue Lakes Park, (PROS) 2017 - Roadway Improvements, SW 142 Avenue from SW 26 Street to SW 8 Street - Drainage Improvements, SW 125 Avenue - Dranage Improvements, NW 36 Street, NW 75 Street and NW 44 Street 2016 - Drainage Improvements, NW 102 Street - Drainage Improvements, Various Locations (ongoing since 2015) - Intersection Improvements, Various Locations (ongoing since 2015) 2015 - Alley North of SW 81 Avenue - Roadway Resurfacing, 9 Locations 2014 - Drainage Improvements, NW 53 Terrace from NW 72 Avenue to NW 69 Avenue, SW 60 Street and SW 70 Avenue, NW 191 Street from NW 10 Court to NW 5 Court, NW 12 Avenue from NW 193 Street to NW 196 Terrace - Drainage Improvements, NE Miami Court from NE 139 Street to NE 135 Street, NW 67 Street from NW 33 Avenue to NW 32 Avenue, SW 73 Avenue and SW 12 Street Other Projects - Drainage studies & related improvements at Amerifirst Park - Subdivisions: Zunjik States, Sleepy Holly, Nikis, Costa Brava, Crestview, Sunset Cove, Century Garden Village, Bibiana States - Port of Miami Rip Rap Project @ Pilot Station Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm - full scope of services 1 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 4(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 133 Miami Dade County, Florida, Qualification Based Continuing Contract - Aviation Departments, Various Projects 2000 - Present ongoing Miami Dade County Aviation Dept. Tyrone Brown/ Joaquin Menendez 305-876-0529/ 305-876-0529 This CCNA continuing services contract is one of our many continuing services contract. Since 2000, we have performed environmental services (Phase I/II Environmental Assessments), geotechnical exploration and engineering, construction materials testing and inspections as well as special/ threshold inspections to various department of Miami Dade. Projects under this contract for the Aviation Department include but are not limited to: North Terminal Re-Development Program at Miami International Airport, Miami The overall scope of the program involved the transformation of Concourses A through D from a finger type configuration to a more efficient mile long linear configuration, newly named the North Terminal. The project includes the addition of nine additional gates for a total of 50 gates, 20 refurbished jet bridges, 28 new jet bridges, 1.8 M SF of renovated space including exterior renovations and 1.9M SF of new construction. It also included the additional construction of a 400,000 SF federal inspection building and a mile-long roof-top Skytrain, connecting one end of the terminal to the other with various stops along the way. Other Recent Projects: - Homestead General Airport Runway and taxiway connectors re-paving, 2018 - Opa Locka Executive Airport, 2017 - MIA Taxiway Q8 & Gates H10A & H12 pavement repairs, 2017 - MIA SPOT-22 between H & J pavement papairs, 2017 - Miami Executive Airport (TMB) Taxiway D and connection asphalt paving investigation, 2017 - Miami Executive Airport Taxiway Runway incursion mitigation phase I/II, 2017 - MIA Taxiways R, S & T, 2016 - Miami Dade Aviation Dept. Parking Lot Exp., 2016 - Opa Locka Fueling Facility Access Drive, 2016 - MIA CC-E & F SPOT - 18 Taxiway Pavement, 2015 - MIA Runway 9-27L Light Repair, 2015 - MIA Building 845 Parking Lot Improvements, 2015 - Homestead General Aviation Airport X51, 2014 - Opa Locka Airport Taxiway & Apron Rehab, 2014 - Dade Collier Training & Transit Facility, 2014 - Opa Locka Airport Pavement Thickness Cores, 2014 - MIA Fuel Facility, 2013 - Kendall Tamiami Pavement Study, 2013 - MIA Taxiway 12 & Runway 9/27 Underground Exploration, 2013 Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm - full scope of services 2 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 5(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 134 Miami Dade College, Multiple Campuses, Florida Qualification Based Continuing Contract 2014 - Present ongoing Miami Dade College Gloria Garzon/Judy Gonzales 305-237-2740 Nutting Engineers of Florida, Inc. (NE) holds a qualification based continuing service contract with Miami Dade College to provide geotechnical engineering, construction materials testing and inspection services. Medical Campus New Parking Garage, 2018 Performing pile installation monitoring, construction materials testing and special inspection services for the construction of a new 6-level, ~525,000 square foot parking garage. Construction includes the installation of ~330 16-inch diameter, 60' length auger cast piles, cast-in-place reinforced concrete, precast concrete double “T”'s, and concrete masonry unit. Homestead Campus Double Ring Infiltration Testing, 2017 Performing geotechnical exploration/ engineering services to evaluate the drainage at the site. Softball/Baseball Batting Cages, 2017 Performing geotechnical exploration/ engineering services for the installation of new 10' tall lighting fixtures at each corner of the existing batting cages. MDC Parking Lots 55, 56, 57, 2016 Performed geotechnical exploration/ engineering services for the proposed construction of a new parking lot with marquees/pedestrian/vehicular monuments and other amenities. Medical Center Campus, 2016 Performed geotechnical exploration/ engineering, including test pit excavations and construction materials testing services for the construction of a new 5-story, ~150,000 SF educational building. EEC Campus Parking Lot Lighting, 2014- 2015 Performed geotechnical exploration/ engineering and construction material testing services for the design and installation of approx. ten (10) new lighting fixtures, ~25' in height, on precast concrete poles installed along the perimeter at the referenced parking lot. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm - full scope of services 3 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 6(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 135 Miami Dade Public School District, Florida - Various K-12 Schools (Qualification Based Continuing Contract) ongoing ongoing Miami Dade Public Schools Mr. Juan Salinas 305-995-4696 Miami Dade Public School District is one of the many School Districts which we have a Qualification Based Contract for Geotechnical Engineering, Construction Materials Testing and Structural (Special/ Threshold) Inspections and Environmental Services. We have held this contract since 2000, mere months after opening our Miami office/ lab location. This award was especially gratifying since it was our first time presenting to that School District. Since 2000, we have maintained a presence on at least 2 sites at any given time. RECENT PROJECTS: State School SSS-1/ Medical Technologies Senior High School, Homestead - Retrofit of the existing Homestead Hospital into a classroom building. Interior renovations included demolition of interior walls, installation of new columns, and modification to the existing foundations. Exterior renovations included creation of a drop off area, right of way improvements, asphalt resurfacing and potential abandonment or removal of underground storage tanks. Services include geotechnical services and construction material testing and inspections. Miami Norland Senior High School Expansion- Construction of three (3) new one, two, and three-story buildings at the existing school complex, and installation of a new drainage system. Services include geotechnical services and construction materials testing. New Prototype High School YYY- ~300,000 SF (1,700 student stations) of new construction inc. administration, media center, electives and academic wings, food service, chiller building, PE shelter, teachers, parent and student parking, associated athletic courts and fields. Services inc. geotechnical services, monitoring services, South Miami Middle School-project includes the installation of an 8” diameter PVC by approximately 600 foot long sanitary sewer line. Services include geotechnical engineering, monitoring services, materials testing and special inspections. Our experience including drainage evaluations, classroom buildings, libraries, athletic buildings, affiliated fields, bill boards, concessions stands, parking and driving areas, associated land purchases, etc. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full scope of services 4 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 7(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 136 City of Miami Beach, Florida, Qualification Based Continuing Contract - Various projects Ongoing Ongoing City of Miami Beach and Consultants Mr. Hermes Diaz, P.E. 305-673-7080 Since 2009 Nutting Engineers of Florida, Inc. (NE) has been holding this Qualification Based Contract to provide geotechnical engineering and construction materials testing services for various departments within the City of Miami Beach. We have also worked on multiple projects in Miami Beach with other engineering firms, general contractors and architects. Projects under this contract to date include: Capital Improvements Projects Office: Normandy Shores Golf Course Club House Replica: NE provided geotechnical engineering and construction materials testing services for the construction of a new ~8,000 SF one-story replica of the 1940's club house building. Neighborhood #8E - Sunset Islands 1 and 2: NE provided geotechnical engineering and construction materials testing services for the installation of new storm water sewers and portable water lines. - Bayshore 8D - Sunset Islands 3 and 4 - Neighborhood #8E - Sunset Islands 1 and 2 Outfall - Flamingo Park Football Field Improvements - Bayshore #8E - Sunset Islands 1 and 2 Right-of-Way Public Works Department- Engineering Division - Hibiscus and Palm Islands - Neighborhood #9 - City Center South Beach Bicycle - 17th Street Signalization Projects via Consultants: - Altos del Mar Park, Collins Avenue between 76th & 77th Street - Espanola Way Streetscape, between Drexel Avenue & Washington Avenue - Central Bayshore South Neighborhood Improvements New Outfall Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full scope of services 5 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 8(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 137 Town of Miami Lakes, Florida, Qualification Based Continuing Contract - Various Projects Ongoing Ongoing Town of Miami Lakes Mr. Mario Palo 305-364-6100 Nutting Engineers of Florida, Inc. was retained by the Town of Miami Lakes to perform geotechnical exploration/engineering services, laboratory testing, and construction materials testing services for various park improvement projects. Optimus Park Clubhouse, 6411 NW 162nd Street, Miami Lakes Construction of a new approximately 4,000 SF clubhouse building and associated drainage improvements. Sevilla Estates Park Improvements, NW 169th Terrace and NW 89th Court, Miami Lakes Construction of a new picnic shelter, playground, basketball half court, observation pier, and asphalt paved walkways. Park East Park Improvements, 6023 NW 154th Street, Miami Lakes Construction of a new youth Center, basketball court, two (2) picnic areas, and a dumpster enclosure. Town of Miami Lakes Government Center, 15501 NW 67th Avenue, Miami Lakes Construction of a new 2-story, ~25,000 SF Government Center and associated parking lot. At the completion of the on-site work, the representative soil samples collected in the field were returned to our laboratory to classify the soils and to determine natural water content, organic content, and/or sieve analysis. An engineering report including graphic logs of our findings, a test boring location plan, a description of our findings and general site preparation and foundation design recommendations for support of the proposed improvements was provided. Projects via Consultants - Miami Lakes Rubberized Sidewalk, Miami Lake Way North btwn. NW 153rd Street and Miami Lake Drive East - Miami Lakes Emergency Generator, 16547 NW 87th Avenue Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full scope of services 6 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 9(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 138 City of Hallandale Beach, Florida - Various Projects ongoing ongoing City of Hallandale Beach Mr. Gregg Harris 954-451-3029 Nutting Engineers of Florida, Inc. has performed geotechnical exploration/engineering, construction materials testing and/or inspection services for the City of Hallandale Beach since 2001. Most recent projects include, but are not limited to: - Hallandale Beach Stormwater 42 Year Community Development Block Grant, 2017: Installation of drainage pipes, catch basins, manholes, and exfiltration trenches throughout the referenced project area. - SW-SE Hallandale Beach Drainage Improvements, 2017: Installation of 72-inch to 18-inch diameter DIP Force Mains (approx. 3,900 l.f.), Pump Stations, Control Structures, and Drainage Structures - Bluesten Park, 2016: Construction of a new community recreation center, swim sports facility, field house, pool and children's area, multiple sports courts and two (2) baseball fields on a 16.5 acre site. - Golden Isles Tennis Complex and Dog Park, 2015: Construction of a new restroom facility, pro shop area, the reconfiguration of the existing tennis courts and paved parking area. - Fire Station #7, 2015: Performed exfiltration testing for the drainage evaluation of existing soils. - OB Johnson Park, 2014: Construction of a 2 to 3-story, ~45,000 SF building with associated site amenities. - City of Hallandale Beach Main Fire Station, 2014: Construction of a new 2 to 3-story fire station and emergency operation center with a footprint of ~20,000 SF. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm - full scope of services 7 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 10(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 139 City of Hollywood, Florida - Various Projects ongoing since '02 ongoing City of Hollywood, Various Depts. See Below See Below Nutting Engineers of Florida, Inc. has a relationship with the City of Hollywood dating back to 2002 with a geotechnical study and asphalt coring services for the Ocean Walk (for Mr. Moe Anuar). Since then we have provided dozens of geotechnical studies as well as provided construction material testing, laboratory testing and inspection services directly for Hollywood personnel. 2017 Projects: Water Main Replacement Program Hollywood Boulevard from Johnson Street to Hollywood Boulevard and 60th Avenue to North 53rd Avenue (64,000 lf) (Geotechnical) Water Main and Sewer Replacement Hollywood Boulevard, north of Pembroke Road, west of South Federal Highway and east of South Dixie (60,000 lf) (Geotechnical) 2015 Projects: Water Main Replacement Program South 26th Avenue to Dixie Highway (Testing) 2014 and 2013 Projects: WTP Scrubber System Expansion, Hollywood Boulevard and North 35th Avenue (Geotechnical) Alleyways between 54th and 55th Avenue (Geotechnical) Hollywood WWTP @ 1621 North 35th Avenue (Testing) 2012 and 2011 Projects: Drainage Study @ NW 29th Street between NW 6th Avenue and Florida Turnpike 14th Avenue Drainage Improvements @ North 14th Avenue & various streets west of North 14th Avenue Dixie Corridor Septic to Sewer Conversion, Dixie Highway between Pembroke Road and Sheridan Street; between Sherman Street and Taft Street New Pipeline on Arthur Street to Hollywood Boulevard, Arthur Street and North 12th Avenue to North 14th Avenue DIW Booster Pump Station @ Hollywood WTP, Hollywood Boulevard Signal and Road Improvements @ Taft Street and North 21st Road City Personnel Contact: Mr. Clece Aurelus, 954-921-3930, Mr. Leslie Pettit, 954-921-3995, Mr. James Mortel, 954-621-3930 Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm - full scope of services 8 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 11(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 140 Florida Keys Aqueduct Authority, Monroe County, Florida - Numerous Projects 1995 - ongoing ongoing Florida Key Aqueduct Authority Mr. Ray Shimokubo/Mr. Tom Walker, P.E. 305-296-2454 Nutting has been providing geotechnical engineering and construction materials testing services to the Florida Keys Aqueduct Authority for over 20 years. Projects include: Distribution Pump Station Directional Drilling @ 18 Mile Stretch Cross Key Pump Station Tower Key Largo Maintenance Building Ocean Reef Distribution System Improvements - Phase II Main R.O. Warehouse Rockland Key Property (Site I & II) North Crawl Key Ocean Reef Vacuum/Pump Station Key Largo Pump Station Key Largo WWTP Duck Key Waste Water and Water Line Conch Key WWTP Layton Key Waste Water and Water Line Installations Distribution System Upgrades along US-1 Islamorada Pump Station Projects via consultants include: FKAA J. Robert Dean Water Treatment Plant, Florida City FKAA - Eden Pines and Pine Channel Estates, Big Pine Key FKAA Outer Islands, Big Pine Key, Ramrod Key, Little Torch Key, Lower Sugarloaf Key FKAA - Cudjoe Key Waste Water Collection System, Lower Sugar Loaf Pump Station FKAA-Key Haven Utility Improvements FKAA Force Main, Boca Chica FKAA Building, 615 33rd Gulf, Marathon Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full scope of services 9 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 12(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 141 Richard Wohlfarth, PE Principal/Dir. of Engineering Stephen Mrachek, PE Senior Engineer Miami Dade County - Qualification Based Contract Public Works Dept. Miami Dade County - Qualification Based Contract Aviation Dept. Miami Dade College - Qualification Based Contract Miami Dade Public Schools - Qualification Based Contract City of Miami Beach - Qualification Based Contract Town of Miami Lakes - Qualification Based Contract City of Hallandale - Various Projects City of Hollywood - Various Projects Florida Keys Aqueduct Authority - Numerous Projects G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table.26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT Place "X" under project key number for participation in same or similar role.)(From Section E, Block 12) (From Section E, Block 13) 12345678910 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 6 2 7 3 8 4 9 5 10 STANDARD FORM 330 PAGE 13(REV. 3/2013) 142 143 144 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)145 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Charles R Faust Jr 13. ROLE IN THIS CONTRACT account management 14. YEARS EXPERIENCE a. TOTAL 4 b. WITH CURRENT FIRM 4 years 15. FIRM NAME AND LOCATION (City and State) US Utility Potholing & Air Excavation 16. EDUCATION (DEGREE AND SPECIALIZATION) High School Diploma 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Utility Locating Certificate 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) 14-7216.2 Nova Dr Improvements (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for the purpose of verifying underground utilities horizontal and vertical locations for Nova Dr widening. Our cost $ 34,110.00 b. (1) TITLE AND LOCATION (City and State) FDOT I-95 Expressway (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for the purpose of verifying utility locations for future foundations of widening I-95 in Broward County. our cost $18,970.00 c. (1) TITLE AND LOCATION (City and State) Dania Beach Catch Basin 5, Dania Beach, FL (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for engineering design purposes for Calvin Giordano & Associates our cost $11,955.00 d. (1) TITLE AND LOCATION (City and State) FDOT 826 / I-75 Expressway Lanes (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for the purposes of verifying locations of underground utilities for placement placement of mast arm bases. This is an ongoing contract as needed. e. (1) TITLE AND LOCATION (City and State) Mount Sinai Hospital, Miami Beach, FL (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for design purposes for Kimley-Horn Engineering for raising structures and new construction at Mount Sinai Hospital in Miami our cost $17,855.00 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) MANDATORY USE DATE OF FORM 6/2004 146 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Christopher T Manno 13. ROLE IN THIS CONTRACT Field Operations Advisory 14. YEARS EXPERIENCE a. TOTAL 36 years b. WITH CURRENT FIRM 4 years 15. FIRM NAME AND LOCATION (City and State) US Utility Potholing & Air Excavation 16. EDUCATION (DEGREE AND SPECIALIZATION) Cardinal Gibbons High School Diploma Ft Lauderdale, FL 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) OSHA Competent Person, OSHA Confined Space Training, All Methods Tunneling Dewatering, Storm Water WSP California, SWPPP- QSP- Qualified Storm Practioner 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) 14-7216.2 Nova Dr Improvements (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for the purpose of verifying underground utilities horizontal and vertical locations for Nova Dr widening. Our cost $ 34,110.00 b. (1) TITLE AND LOCATION (City and State) FDOT I-95 Expressway (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for the purpose of verifying utility locations for future foundations of widening I-95 in Broward County. our cost $18,970.00 c. (1) TITLE AND LOCATION (City and State) Dania Beach Catch Basin 5, Dania Beach, FL (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for engineering design purposes for Calvin Giordano & Associates our cost $11,955.00 d. (1) TITLE AND LOCATION (City and State) FDOT 826 / I-75 Expressway Lanes (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for the purposes of verifying locations of underground utilities for placement placement of mast arm bases. This is an ongoing contract as needed. e. (1) TITLE AND LOCATION (City and State) Mount Sinai Hospital, Miami Beach, FL (2) YEAR COMPLETED 2015 PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Collected SUE Data for design purposes for Kimley-Horn Engineering for raising structures and new construction at Mount Sinai Hospital in Miami our cost $17,855.00 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) MANDATORY USE DATE OF FORM 6/2004 147 20. EXAMPLE PROJECT KEY NUMBER 2016 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)1 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDFDOT 826 / I-75 Expressway Lanes Community, Condotte, De Moya US Utility Potholing & Air Excavation was requested to locate mark and physically verify existing utilities that may be of conflict with proposed mast arms. We verified the utilities with the use of vacuum excavation methods and depths measured with grade rod. Our crews collected data and marked with either PK Nails and Paint or Stake and Feather for the survey crews to shoot. This is an ongoing contract and work as needed by client. Antonio Diaz (786) 543-7166 Community, Condotte, De Moyaa.Doral, FL Construction and Engineering Conglomerate b. c. d. e. STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 148 20. EXAMPLE PROJECT KEY NUMBER 2016 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)2 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDFDOT I-95 Expressway, Broward County FDOT US Utility Potholing & Air Excavation was responsible for collecting SUE Data to aid in the design and installation for future foundations for the widening of I-95 Expressway. We were requested to locate mark and physically verify existing utilities that may be in conflict with proposed foundations on the widening of I-95 Expressway Overpasses. Requested utilities were verified with the use of vacuum excavation methods and depths measured with grade rod. Our crews collected data and marked with either PK Nails and Paint or Stake and Feather along with providing the Surveying Firm of Hadonne a detailed report of utilities located. Cost of our services on this project were $18,970.00 Abraham Hadad (305) 207-6845 Hadonnea.Doral, FL Surveying Firm b. c. d. e. STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 149 20. EXAMPLE PROJECT KEY NUMBER 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)3 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDDania Beach Catch Basin 5, Dania Beach, FL Dania Beach We were asked by client to collect SUE Data on potential conflicts of existing utilities for the design of Catch Basins in Dania Beach, FL. We located, measured depth and size of existing utilities by the use of standard utility locating methods, GPR and Vacuum Excavation methods. We then compiled the data into a detailed SUE Report along with marking on pavement or grass with PK Nails, Paint or Stake/ Feathers for future survey. CGA James Messick (954) 766-2789 Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Engineering Design b. c. d. e. STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 150 20. EXAMPLE PROJECT KEY NUMBER Utility Verification F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)4 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED17-7216.2 Nova Dr Improvements, Davie, FL Broward County Verification of existing utilities for street widening on Nova Dr and also clearing utilities for future mast arm. Total cost of our services $34,110.00 Jenna Martinetti (954) 921-7781 MBR Construction a.Fort Lauderdale, FL Prime Contractor b. c. d. e. WSD Constracting Fort Lauderdale, FL Underground Contractor STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 151 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)5 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDFIU Miami Campus, Miami, FL FIU Provided utility verification on specific utilities that client had designated to aid in design purposes. Our fees on this project were $4310.00. Marty Rossi (Miller Legg)(954) 436-7000 Miller Legga.Fort Lauderdale, FL Engineering b. c. d. e. STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 152 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)6 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDCVS #74943 CVS Client asked us to go to new site of CVS to locate and verify existing utilities to aid in the design of new CVS Store location. We located utilities through standard utility locating methods and GPR and verification was performed with the use of Vacuum Excavation. Total cost of our services on this project was $2,975.00. John Hillman (Kimley-Horn)(561) 404-7238 Kimley-Horna.Delray Beach, FL Design Engineering Firm b. c. d. e. STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 153 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)7 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDUtility Locate / Vertification, Bal Harbor, FL DOT This was a small project to locate using air vacuum excavation methods existing utilities in the area where a new mast arm would be installed for a traffic light. We were hired by the utility locating company GeoView. Project Cost $1000.00 GeoView Craig Fusaro (727) 479-6338 NV5a.Miami Lakes, FL Engineering Firm b. c. d. e. GeoView Boca Raton, FL Utility Locator STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 154 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)8 23. PROJECT OWNER’S INFORMATION 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 21. TITLE AND LOCATION (City and State) a. PROJECT OWNER (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETEDPine Ave Drain ImprovementsLauderdale by the Sea, FL State Contracting & Engineering To verify and mark the elevation of existing utilities with the use of Air Vacuum Excavation methods. Utilities were all marked using paint. Paul Carty (954) 931-3857 State Contracting & Engineeringa.Hollywood, FL Prime Contractor b. c. d. e. STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 155 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 29. EXAMPLE PROJECTS KEY NUMBER 1 3 2 4 5 NUMBER 6 8 7 9 10 TITLE OF EXAMPLE PROJECT (From Section F) FDOT 826 / I-75 Expressway Lanes Dania Beach Catch Basin 5, Dania Beach, FL FDOT I-95 Expressway, Broward County 14-7216.2 Nova Dr Improvements, Davie, FL FIU Miami Campus Miami, FL TITLE OF EXAMPLE PROJECT (From Section F) CVS #74943 Pine Ave Drain Improvements, Lauderdale by the Sea, FL Utility Locate/Verificaiton, Bal Harbor, FL G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)1 52 63 7 948 10 X XX XX XX XCharles R Faust Account Management/ Field Work X XX XX XX XChristopher Manno President of field operations/Supervisor STANDARD FORM 330 (1/2004)AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 156 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 33. NAME AND TITLE STANDARD FORM 330 (1/2014) 08/28/2018 Charles R Faust Jr, Managing Member AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 157 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2d. STATE 2e. ZIP CODE 5. OWNERSHIP b. Discipline c. Number of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue IndexNumber (see below) STANDARD FORM 330 (1/2004) 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If Block 2a is a Branch Office) 8c. UNIQUE ENTITY IDENTIFIER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. c. NAME AND TITLE a. Function Code a. Profile Code b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater Other Employees a. TYPE LLC 2a. FIRM (or Branch Office) NAME US Utility Potholing & Air Excavation 2b. STREET 4630 NE 11th Avenue 2c. CITY Oakland Park 6a. POINT OF CONTACT NAME AND TITLE Chuck Faust 02 Administrative Codes; Standards, Ordinances Construction Management Cost Estimating Educational Facilities Env Impact Studies, Assess or Stat Hwys; Streets; Airfield Paving; Park Hospital & Medical Facilities Irrigation; Drainage Zoning; Land Use Studies Water Supply; Treatment and Distri Urban Renewals; Community Devel Traffic & Transportation Engineerin Storm Water Handling & Facilities Surveying Sewage Collection, Treatment Planning Site Planning Community Office Building; Industrial Parks Landscape Architecture Chemical Engineers Civil Engineers Construction Inpsector Electrical Engineers Landscape Architects Planners: Urban/Regional Sanitary Engineers Permitting Specialist Surveyors Computer CADD Technicians Field Surveyors GIS/Data Technology Specialist Environmental Specialists Environmental Field Crew Landscape Designers/Inspectors Biologist(s)/Indoor Air Quality 10 12 15 21 39 47 52 38 08 38 29 24 39 07 6c. E-MAIL ADDRESS CFaust@USUtilityPotholing.com FL 33334 6b. TELEPHONE NUMBER 954-937-1488 3.YEAR ESTABLISHED 2014 4. DUNS NUMBER 85-9310166 Charles R Faust Jr, Managing Member b. DATE DS 18-014 1 08/28/2018 25 20 0 8 8 24 AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004) 158 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) LICENSES AND CERTIFICATIONS 159 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) State of Florida Department of State I certify from the records of this office that CALVIN, GIORDANO & ASSOCIATES, INC.is a corporation organized under the laws of the State of Florida,filed on June 27, 1985. The document number of this corporation is M17373. I further certify that said corporation has paid all fees due this office through December 31, 2018,that its most recent annual report/uniform business report was filed on January 2, 2018,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital, this the Second day of January, 2018 Tracking Number: CC7752276398 To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 160 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Florida Department of Transportation RICK SCOTT GOVERNOR 605 Suwannee Street Tallahassee, FL 32399-0450 MIKE DEW SECRETARY www.fdot.gov May 15, 2018 Dennis J. Giordano, President CALVIN, GIORDANO & ASSOCIATES, INC. 1800 Eller Drive, Suite 600 Ft. Lauderdale, Florida 33316 Dear Mr. Giordano: The Florida Department of Transportation has reviewed your application for prequalification package and determined that the data submitted is adequate to technically prequalify your firm for the following types of work: Group 3 -Highway Design -Roadway 3.1 -Minor Highway Design 3.2 -Major Highway Design Group 6 -Traffic Engineering and Operations Studies 6.1 -Traffic Engineering Studies 6.2 -Traffic Signal Timing Group 7 -Traffic Operations Design 7.1 -Signing, Pavement Marking and Channelization 7.2 -Lighting 7.3 -Signalization Group 8 -Survey and Mapping 8.1 -Control Surveying 8.2 -Design, Right of Way & Construction Surveying 8.4 -Right of Way Mapping Group 10 -Construction Engineering Inspection 10.1 -Roadway Construction Engineering Inspection 10.3 -Construction Materials Inspection 10.4 -Minor Bridge & Miscellaneous Structures CEI 161 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) www.fdot.gov Group 13 -Planning 13.4 -Systems Planning 13.5 -Subarea/Corridor Planning 13.6 -Land Planning/Engineering Group 15 -Landscape Architect Your firm is now technically prequalified with the Department for Professional Services in the above referenced work types. The overhead audit has been accepted, and your firm may pursue in the referenced work types with fees of any dollar amount. This status shall be valid until June 30, 2019 for contracting purposes. Approved Rates Home/ Branch Overhead Field Overhead Facilities Capital Cost of Money Premium Overtime Reimburse Actual Expenses Home Direct Expense Field Direct Expense 122.68%88.44%0.170%Excluded No 4.44%7.54%* *Rent and utilities excluded from field office rate. These costs will be directly reimbursed on contracts that require the consultant to provide field office. Should you have any questions, please feel free to contact me by email at carliayn.kell@dot.state.fl.us or by phone at 850-414-4597. Sincerely, Carliayn Kell Professional Services Qualification Administrator 162 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)163 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)164 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Florida Corporate and Engineering Licenses 165 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Licenses 166 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Occupational Licenses Municipality 167 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Florida Department of Transportation RICK SCOTT GOVERNOR 605 Suwannee Street Tallahassee, FL 32399-0450 MIKE DEW SECRETARY www.fdot.gov March 5, 2018 Kristina Berryman, Business Development Manager NUTTING ENGINEERS OF FLORIDA INC 1310 Neptune Drive Boynton Beach, Florida 33426 Dear Ms.Berryman: The Florida Department of Transportation has reviewed your application for qualification package and determined that the data submitted is adequate to technically qualify your firm for the following types of work: Group 9 -Soil Exploration, Material Testing and Foundations 9.1 -Soil Exploration 9.2 -Geotechnical Classification Laboratory Testing 9.4.1 -Standard Foundation Studies Your firm is now technically qualified with the Department for Professional Services in the above referenced work types. Your firm may pursue projects in the referenced work types with fees estimated at less than $500,000.00. This status shall be valid until March 5, 2019 for contracting purposes. Should you have any questions, please feel free to contact me by email at carliayn.kell@dot.state.fl.us or by phone at 850-414-4597. Sincerely, Carliayn Kell Professional Services Qualification Administrator 168 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) State of Florida Department of State I certify from the records of this office that CC AMERICAN ENTERPRISES LLC is a limited liability company organized under the laws of the State of Florida,filed on April 28, 2014,effective April 28, 2014. The document number of this limited liability company is L14000072780. I further certify that said limited liability company has paid all fees due this office through December 31, 2018,that its most recent annual report was filed on May 16, 2018,and that its status is active. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital, this the Twenty-seventh day of August, 2018 Tracking Number: CU2448397934 To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 169 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)170 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA)171 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) PROJECT ORGANIZATION CHART 172 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) City of Sunny Isles Beach Principal-in-Charge and Project Manager Curt A. Keyser, PE Calvin, Giordano & Associates, Inc. Roadway / Drainage Jenna Martinetti, PE Mohammed Sharifuzzaman, PE Matthew Iles, EI Calvin, Giordano & Associates, Inc. Lighting Robert W. Roush, PE Jorge R. Cervantes, PE Calvin, Giordano & Associates, Inc. Landscape Architecture / Irrigation Tammy Cook-Weedon, ASLA, RLA, LEED AP BD+C Michael Conner, ASLA, RLA Marcos Mendoza Calvin, Giordano & Associates, Inc. Water / Sewer Nicholas W. Kanelidis, PE James Messick, PE Calvin, Giordano & Associates, Inc. Construction Administration Robert McSweeney, PE Bruce Bernard Calvin, Giordano & Associates, Inc. Utility Coordination Nicholas B. Mahon, PE Jose Jimenez Rainier Gonzales, EI Calvin, Giordano & Associates, Inc. Surveying Steve Watts, PSM Pablo Dominguez Calvin, Giordano & Associates, Inc. Public Information Outreach Silvia Vargas, AICP, LEED AP Calvin, Giordano & Associates, Inc. Subsurface Utility Engineer Christopher Manno Charles "Chuck" R. Faust Jr. US Utility Potholing & Air Excavation Geotechnical Richard C. Wohlfarth, PE Stephen J. Mrachek, PE Nutting Engineers of Florida, Inc. Subconsultants 173 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) PROJECTS 174 City of Sunny Isles Beach |Request for Qualifications No. 18-08-01 27 PROJECT VERIFICATION FORM Proposer shall have provided Underground Consultation Services for at least three (3) Projects over the past five (5) years of similar size, nature and complexity with a construction amount exceeding $1,000,000 and provide evidence using the spaces below. 1) Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Contract Amount: $__________________________________________________ 2) Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Contract Amount: $__________________________________________________ 3) Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:_____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Contract Amount: $__________________________________________________ END OF SECTION Sage Beach (Property Markets Group) Aaron Sinnes Civil site planning, permitting, and preparation of construction documents, City of West Palm Beach 401 Clematis Street, 4th Floor, P.O. Box 3366 West Palm Beach, FL 33402 Suzanne Berglund, PE Engineering Manager SBerglund@wpb.org 561.494.1075 Civil engineering and landscape architecture services. Town of Surfside 9293 Harding Avenue Surfside, Florida 33154 Guillermo Olmedillo Town Manager GOlmedillo@townofsurfsidefl.gov 305.861.4863 2015 - Ongoing Construction Director 1441 Brickell Avenue, Suite 1510 Miami, FL 33131 ASinnes@propertymg.com 305.917.1070 May 2013 - Current (Pending final payments) 180,250.00 Infrastructure Improvements - Water, Sewer, Stormwater January 2010 - December 2013 $750,000.00 10,000,000.00 175 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) FIRM REFERENCES AND SIMILAR WORK COMPLETED 6 176 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 6. FIRM AND REFERENCES AND SIMILAR WORK COMPLETEDExamples of Similar Work The CGA project team has experience providing similar services in the South Florida area - and is fully qualified to perform the services outlined in this RFQ. Examples of similar work performed by the team is outlined below. Additional project experience and references can be found in Section 5. Qualification Information and Assigned Personnel of the SF330 form.Town of Surfside9293 Harding Avenue | Surfside, FL 33154 Guillermo Olmedillo, Town ManagerTel: 305.861.4863Fax: 305.861.1302E-Mail: GOlmedillo@townofsurfsidefl.gov Project Title: Various ProjectsLocation: Surfside, FL Description of Work:Calvin, Giordano & Associates, Inc. (CGA) managed the Town of Surfside’s Utility Rehabilitation Project from start to finish. The project consisted of investigating the existing potable water, storm sewer, and sanitary sewer systems while identifying and performing cost benefit analyses on each required improvement. The potable water system investigation included fire flow analysis, coupon sampling and as-built review. The new system was designed to increase / maximize available fire flow, and replace deteriorating or known problem areas within the existing system. The project also relocated the back of yard water services and meters with front yard services which included AMR (microwave readable) water meters, which resulted in a operating cost savings to the Town. Service sizes were increased to provide for both domestic and landscape water meters thus allowing for a savings to the water charges. The final design included the replacement of over 32,000 LF of water main, 1,587 water services, 1,278 new water meters and 46 additional fire hydrants. The sanitary sewer system analysis included video analysis of the existing gravity system, Inflow/Infiltration (I/I) testing, and a review of water consumption vs sewage transmission. Based on the system analysis and facility design life, over 50,000 LF of sanitary sewer main was CIPP lined or replaced. In addition, the Town’s two (2) sewage pump stations were completely rebuilt with updated and more efficient pumps including SCADA controls. The force mains from the pump stations to the shared transmission main were also replaced. The Town has observed the post construction reduction in I/I has reduced their monthly sewage transfer and disposal costs by over 30%, thus bringing the Town back into compliance with the County issued Consent Decree.The storm sewer system was upgraded to include three (3) SCADA controlled pump stations, nine (9) shallow injection drainage wells, twenty (20) control structures and the required RCP pipeline to interconnect the existing gravity drainage system with the newly installed pumped well system.In conjunction with these infrastructure improvements, CGA oversaw the planning and installation of underground conduits at all planned future roadway crossings for existing overhead wire utilities to be converted to underground. CGA coordinated with FPL, Atlantic Broadband, and AT&T to relocate the existing overhead wire utilities to underground while the roadways were already disrupted with the infrastructure construction. After significant coordination efforts, the Town eventually elected to install only PVC conduit at all roadway crossings in preparation for a future undergrounding of these overhead utilities. CGA oversaw the planning and installation of the conduits at all planned roadway crossings. CGA obtained all necessary permits, such as, Department of Environmental Resources Management (DERM) and Florida Department of Transportation (FDOT) Utility Connection, Florida Department of Environmental Protection (FDEP) and provided construction services throughout construction duration. CGA assisted the Town by obtaining the required funding for this project, which included the Miami Dade Building Better Communities General Obligation Bond, FDEP Grants, Regions Bank publically bid bond issuance and the FDEP's State Revolving Loan Program. Year Completed: 2013 Proposed Team Member's ExperienceCurt A. Keyser, PE; Jenna Martinetti, PE; Robert W. Roush, PE; James Messick, PE; Robert McSweeney, PEBruce Bernard; Nicholas B. Mahon, PE 177 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Sage Beach (sub-consultant to Property Markets Group)1441 Brickell Avenue, Suite 1510Miami, FL 33131 Aaron Sinnes, Construction DirectorTel: 305.917.1070Fax: N/AE-Mail: ASinnes@propertymg.com Project Title: Sage Beach - Offsite Roadway ImprovementsLocation: Hollywood, FL Description of Work:CGA was retained by PMG Driftwood LLC to provide civil site planning, permitting, and preparation of Construction Documents for two new residential towers located on Iris Terrace, east of SR A1A in Hollywood, FL. The project consisted of civil site as well as the offsite improvement within City R/W and CRA jurisdiction on Iris Terrace, South Surf Road and Jasmine Terrance. The roadway was regraded in order to tie into the new, higher finish floor elevations required. New sidewalk, landscaping, lighting, underground utilities and drainage were included in the complete roadway reconstruction of the adjacent streets. CGA provided the “utility layout” sheet which incorporated the design from each of the utility providers and put them on one plan sheet with the other roadway, drainage, water and sewer improvements shown in order to verify horizontal and vertical clearances as well as fit the required equipment within the right-of-way. A Surface Water Management License for the new facilities was obtained from Broward County Environmental Resources and Growth Management Department for the work within the City’s R/W requiring approximately 250 LF of exfiltration trench under the roadway. Two FDOT permits were also required to complete the streetscape improvements where Iris Terrace intersects SR A1A. An FDEP drainage well permit was obtained in order to install two drainage wells, one for each of the two buildings. The services provided were completed in a timely manner and under budget. The project is currently in the final stages of construction. Year Completed: Ongoing Proposed Team Member's ExperienceCurt A. Keyser, PE; Jenna Martinetti, PE; Mohammed Sharifuzzaman, PE; Matthew Iles, EI; James Messick, PE; Robert McSweeney, PE; Bruce Bernard; Nicholas B. Mahon, PE 178 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) City of West Palm Beach401 Clematis Street4th FloorP.O. Box 3366West Palm Beach, FL 33402 Suzanne Berglund, PE, Engineering ManagerTel: 561.494.1075Fax: N/AE-Mail: SBerglund@wpb.org Project Title: Tamarind AvenueLocation: West Palm Beach, FL Description of Work:Calvin, Giordano & Associates, Inc. CGA was retained by the City of West Palm Beach to provide all of the civil engineering and landscape architecture services for its ambitious Tamarind Avenue Streetscape Project. This twophase project will add bicycle and pedestrian improvements as well as drainage and utility improvements to 0.7 miles of Tamarind Avenue in the City of West Palm Beach. The streetscape improvements are LAP funded (the LAP Phase). The underground utility improvements are funded by the Town (the Utility Phase). The project was split into two construction contracts to facilitate the LAP funding schedule. The first project to be constructed will be the underground improvements which include the replacement of 90 year old clay drainage pipes, installation a new 24” water main on 7th Street, and the replacement of 90 year old shallow clay sewer mains. This project will also remove the 90 year old concrete base below the roadway which was originally constructed in concrete in 1927 and then overlaid with asphalt over the years to be between 4 and 11 inches thick. The 90 year old cracks in the concrete have reflected in the roadway surface and this will all be replaced. The LAP Phase includes an overlay of the 0.7 mile of roadway, the addition of sharrow bicycle accommodation, concrete sidewalks on both sides of the roadway, decorative pavement features, pedestrian crossings, on-street parking, signing and pavement marking layout and improvements to the turn lanes at both ends of the project. Other improvements included extensive landscaping, pedestrian level street lighting. Services provided by CGA included civil engineering, landscape architecture, and surveying. Year Completed: Ongoing Proposed Team Member's ExperienceRobert W. Roush, PE; Tammy Cook-Weedon, ASLA, RLA, LEED AP BD+C; Marcos Mendoza; Jose Jimenez 179 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) References and Past Performance Projects Mr. Mario Lobato, Mr. Richard Ziel Miami Dade County - Water and Sewer Department 3071 S.W. 38th Avenue Miami, Florida 33146 p: 786.268.5308 /786.268.5422 e: mvlob01@miamidade.gov;ZieR@miamidade.gov Projects:Various Water & Sewer Projects (2018- 2013) Nutting performed/performing the geotechnical exploration/engineering and/or our full scope of construction material testing for the Pump Station Improvement Program (PSIP) consisting of managing the upgrades to the MDWASD Wastewater Collection and Transmission System (WCTS) that includes sanitary sewer collection system, pump stations and force mains upgrades. Additional projects include the SDWWTP High Level Disinfection upgrades, Sludge Dewatering Facility expansion at SDWWTP, emergency installation of 64-inch water main, South Miami High Water Treatment Plant, Alexander Orr Underwater Treatment Plant, installation of 16-inch HDPE and 12-inch force main at Bear Cut Channel. (Not a complete list for this time frame.) Mr. Sean Compel City of Miami c/o Stantec Consulting Services 901 Pone deLeon Boulevard, Suite 900 Coral Gables, Florida 33134 p: 305.445.2900 e: Sean.Compel@Stantec.com Projects:Various Roadway Projects (2016 - 2018 time frame) Nutting performed/performing the geotechnical exploration/engineering for multiple roadway improvement projects including drainage & roadway improvements along Solana Road between Crawford & Poinciana Avenues, drainage & roadway improvements along SW 60th Avenue & SW 83rd Street, Kiaora Street roadway improvements, improvements along NW 18th Avenue from NW 3rd Street to NW 1st Street. Mr. Michael Jones, Director City of Margate 6199 NW 10th Street Margate, Florida p: 954.972.6458 e: MAJones@margatefl.com Projects:Varied (2018 - 2017) Southeast Park Restroom Project: Performed the geotechnical exploration/engineering on behalf of the City for the future demolition and replacement of existing one-story restroom building. 180 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) References and Past Performance Projects Marina Park Restroom Project: Performed the geotechnical exploration/engineering on behalf of the City for the proposed construction of a new restroom building. 2108 Water Main Improvements Project, Phase 1: Performed the geotechnical exploration/ engineering on behalf of the City via Chen Moore and Associates for the various improvements to the City's water main at 7 locations. SFWMD C-14 Canal Crossing: Performed the geotechnical exploration/engineering on behalf of the City via Chen Moore and Associates along Rock Island Road between NW 1st Street & Southgate Boulevard. Roadway Evaluation, NW 8th Street: Performed the geotechnical exploration/engineering on behalf of the City via Chen Moore and Associates to evaluate roadway settlement evaluation. Projects: 181 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) US UTILITY POTHOLING & AIR EXCAVATION'S REFERENCES: Miller LeggContact: Marty Rossi5747 N Andrews WayFort Lauderdale, FL 33309Phone: 954.936.7000Fax: 954.493.6539 Project Title: FIU Miami CampusLocation: Miami, FL Description of Work:Provided utility verification on specific utilities that client had designated to aid in design purposes. Hadonne Inc.Contact: Hermes Aguilar1985 NW 88th Ct, Ste 201Doral, FL 33172Phone: 305.266.1188Fax: 305.207.6845 Project Title: FDOT I-95 ExpresswayLocation: Broward County Description of Work:US Utility Potholing & Air Excavation was responsible for collecting SUE Data to aid in the design and installation for future foundations for the widening of I-95 Expressway. We were requested to locate mark and physically verify existing utilities that may be in conflict with proposed foundations on the widening of I-95 Expressway Overpasses. Requested utilities were verified with the use of vacuum excavation methods and depths measured with grade rod. Our crews collected data and marked with either PK Nails and Paint or Stake and Feather along with providing the Surveying Firm of Hadonne a detailed report of utilities located. Kimley HornContact: Jason Webber1615 S Congress Ave, Ste 201Delray Beach, FL 33445Phone: 561.330.2345Fax: 561.863.8175 Project Title: CVS #74943 Description of Work:Client asked us to go to new site of CVS to locate and verify existing utilities to aid in the design of new CVS Store location. We located utilities through standard utility locating methods and GPR and verification was performed with the use of Vacuum Excavation. Total cost of our services on this project was $2,975.00. 182 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) CORPORATE STANDING AND AUTHORIZED SIGNATORY 7 183 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 7. CORPORATE STANDING AND AUTHORIZED SIGNATORY Calvin, Giordano & Associates, Inc. and its team of sub-consultants are in good standing with State of Florida. A list of the officers of the company are provided below. 184 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) VARIATIONS/EXCEPTIONS 8 185 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 8. VARIATIONS/EXCEPTIONS The CGA team does not have any variations/exceptions. 186 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) LITIGATION STATEMENT 9 187 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 9. LITIGATION STATEMENT AUGUST 2018 Customer satisfaction is CGA’s primary objective for every project undertaken by the firm. As such, CGA endeavors to complete each project on time and within budget. CGA is proud to assert that CGA has not failed to provide products, perform services, or furnished goods for which we have been contracted. 1. Armando E. Silva, and Robin Silva, both individually and as natural parents and next friends of Spencer Silva and Heather Silva, minors, v. South Broward Hospital district, d/b/a Memorial Regional Hospital, Hardrives of Delray, Inc., d/b/a Hardrives, Inc., a Florida Profit Corporation, Calvin, Giordano & Associates, Inc., a Florida Profit Corporation, and ANF Group, Inc., a Florida Profit Corporation, filed suit on October 25, 2013 in the Broward County Circuit Court. NO. CACE13023917. A lawsuit for compensation was brought against Calvin, Giordano & Associates (CGA) by Armando Silva as a result of a motor cycle accident on a road designed by CGA. This case was settled. 2. Kevin Young vs. Calvin, Giordano, & Associates, Inc., Case NO: 0:13-cv-61870-Scola/Otazo-Reyes, filed in United States District Court for the Southern District of Florida, Fort Lauderdale Division. ADA lawsuit. The parties have dismissed this case with prejudice in accordance with Federal Rule of Civil Procedure 41(a)(1)(A)(ii). Dismissal with prejudice, ECF No. 66) on December 19, 2014. 3. Hummer v. CTS1, Inc., Russell Engineering, Inc., Calvin Giordano & Associates, Inc, and AE Engineering, Inc. CACE 16-008549. This lawsuit relates to an alleged bicycle accident that occurred within the boundaries of the construction project known as the A1A washout project along A1A in Fort Lauderdale, Florida [Broward County]. The nature of the project related to widening sidewalks, reducing traffic lanes, adding traffic signals, and adding a seawall along A1A Sunrise Boulevard North to NE 18th Street. 188 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) FORMS AND ATTACHMENTS 10 189 City of Sunny Isles Beach |Request for Qualifications No. 18-08-01 26 REQUIRED FORMS PRIME FIRM Role Name of Individual Assigned to Project Number of Years’ Experience Education, Degree Principle-in-Charge: Project Manager Asst. Project Manager Other Key Member Other Key Member REFERENCES Name Firm Providing Reference Phone # Email Address Curt A. Keyser, PE Jenna Martinetti, PE 28 Bachelor of Science in Mechanical Engineering 14 Bachelor of Science in Civil Engineering Guillermo Olmedillo Town Manager Town of Surfside 305.861.4863 GOlmedillo@townofsurfsidefl.gov Suzanne Berglund, PE Engineering Manager City of West Palm Beach 561.494.1075 SBerglund@wpb.org Aaron Sinnes Sage Beach (Property Markets Group) 305.917.1070 Curt A. Keyser, PE 28 Bachelor of Science in Mechanical Engineering Nicholas B. Mahon, PE 12 Bachelor of Science in Civil Engineering Robert McSweeney, PE 27 Bachelor of Science in Civil Engineering ASinnes@propertymg.com 190 City of Sunny Isles Beach |Request for Qualifications No. 18-08-01 28 DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue, 4th Floor Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICATIONS SECTION 6 RESPONDENT SUBMITTAL FORMS OPENING: 2:30 P.M. Tuesday, September 4, 2018 NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Genesis Cuevas Date Issued: 08/10/2018 This Qualification Submittal Consists of all required forms, including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No. 18-08-01 CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) Firm Name ________________________________________ Commodity Code(s): RETURN ONE ORIGINAL AND FOUR COPIES OF QUALIFICATION SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 31 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE Calvin, Giordano & Associates, Inc. 191 192 City of Sunny Isles Beach |Request for Qualifications No. 18-08-01 30 RESPONDENT SUBMITTAL FORM CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This RFQ will remain subject to acceptance for 90 days after the day of RFQ opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that: The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. 193 194 City of Sunny Isles Beach |Request for Qualifications No. 18-08-01 33 AFFIDAVITS 195 196 197 198 199 200 201 202 203 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement onthis certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACTPRODUCERNAME:PHONE FAX(A/C, No, Ext):(A/C, No): E-MAILADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIODINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXPTYPE OF INSURANCE POLICY NUMBER LIMITSLTRINSD WVD (MM/DD/YYYY) (MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGG $JECT OTHER:$ COMBINED SINGLE LIMITAUTOMOBILE LIABILITY $(Ea accident) ANY AUTO BODILY INJURY (Per person) $OWNED SCHEDULEDAUTOS ONLY AUTOS BODILY INJURY (Per accident) $ PROPERTY DAMAGEHIREDNON-OWNED (Per accident)$AUTOS ONLY AUTOS ONLY $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $$ PER OTH-WORKERS COMPENSATION STATUTE ERAND EMPLOYERS' LIABILITY Y/NANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $N/AOFFICER/MEMBER EXCLUDED?(Mandatory in NH)E.L. DISEASE - EA EMPLOYEE $If yes, describe underDESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED INACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03)© 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD CALVI-2 OP ID: RC 01/02/2018 954-776-2222 Brown & Brown of Florida, Inc.1201 W Cypress Creek Rd # 130P.O. Box 5727Ft. Lauderdale, FL 33310-5727Eric Martin Woodling 954-776-2222 954-776-4446 Nat'l Fire Ins Co of Hartford 20478 Transportation Insurance Co.20494Calvin, Giordano &Associates, Inc.Attn: Dennis Giordano1800 Eller Drive #600Ft. Lauderdale, FL 33316 Continental Insurance Co.35289 Valley Forge Ins. Co.20508 Landmark American Ins. Co.33138 A X 1,000,000 X 500,000GL604548766301/01/2018 01/01/2019 15,000 1,000,000 2,000,000 X 2,000,000 Emp Ben 1,000,000 B 1,000,000 X C6043661816 01/01/2018 01/01/2019 C X X 10,000,000 CUE6043661850 01/01/2018 01/01/2019 10,000,000 X 0 Prod/CoOp 10,000,000 D X WC6043661847 01/01/2018 01/01/2019 1,000,000 1,000,000 1,000,000 E Prof Liab LHR765209 08/27/2017 08/27/2018 Each 3,000,000 Ded: $200,000 RETRO 8/27/1959 Aggregate 3,000,000 For bid purposes only CALVING Calvin, Giordano & Associates, Inc 1800 Eller Drive #600 Ft Lauderdale, FL 33316 204 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? INSR ADDL SUBRLTRINSD WVD PRODUCER CONTACTNAME:FAXPHONE(A/C, No):(A/C, No, Ext): E-MAILADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person)$OWNED SCHEDULED BODILY INJURY (Per accident)$AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH-STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A(Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED INACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIODINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement onthis certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD DRODRIGUEZ Suzanne Nelson 07/02/2018 NUTTENG-01 C CUP9K037904 B 8109K027007 D UB9K037904 A 6609K024564 E 03101378 1,000,000 1,000,000 1,000,000 10,000 5,000,000 5,000,000 PIP 10,000 2,000,000 1,000,000 2,000,000 5,000 100,000 1,000,000 1,000,000 X X X X X X X X F 03101377 07/01/2018 07/01/2019 07/01/2018 07/01/2019 05/12/2018 05/12/2019 07/01/2018 07/01/2019 07/01/2018 07/01/2019 05/12/2018 05/12/2019 Certificate holder is included as additional insured for ongoing and completed operations for General Liability per CGD414, and Auto Liability when required by written contract. General Liability is primary and non-contributory when required by written contract. Waiver of subrogation applies to General liability, Auto liability, and Workers' compensation for the certificate holders when required by written contract. Umbrella extends over general liability, auto liability and employer’s liability. Cancellation applies as per policy terms, conditions and exclusions Collinsworth, Alter, Lambert, LLC23 Eganfuskee StreetSuite 102Jupiter, FL 33477 (561) 427-6730(561) 868-6291 Nutting Engineers of Florida Inc. & Nutting Environmental of Florida INc. 1310 Neptune Drive Boynton Beach, FL 33426 Nutting Engineers of Florida, Inc.; & Nutting Environmental of Florida, Inc. 1310 Neptune DriveBoynton Beach, FL 33426 Charter Oak Fire Ins Co Travelers Indemnity Co. of America Travelers Property & Casualty Co. of America Travelers Casualty & Surety Company Allied World Surplus Lines Ins Co Allied World Assurance Company 19489 25615 25666 25674 Snelson@calllc.com As required by contract Agg $5 mm-Per Occurr Agg $5 mm-Per Occurr 2,000,000 2,000,000 Professional Liab Pollution Liability 205 City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) 08/30/2018 The Fairway Insurance Group, LLC 5461 North Federal Highway Fort Lauderdale FL 33308 Caryn Osborne (954) 772-9819 (954) 772-9564 CC American Enterprises LLC, DBA: US Utility Potholing & Air ExcavationExcavation 4630 N.E. 11th Avenue Oakland Park FL 33334 Arch Specialty Insurance Co. Progressive Express Insurance Company 10193 Associated Industries Insurance Company 23140 Founder's Professional CL1881615008 A 0100041657-0 08/14/2018 08/14/2019 2,000,000 100,000 Excluded 1,000,000 2,000,000 2,000,000 B 1,000 Ded. 03240940-4 08/14/2018 08/14/2019 1,000,000 C AWC1104307 04/12/2018 04/12/2019 1,000,000 1,000,000 1,000,000 D Professional Liability Inc Pollution 71948W181APL 01/25/2018 01/25/2019 Aggregate 2,000,000 Ea. Incident 2,000,000 Pollution Liab.500,000 Certificate is subject to policy forms & endorsements. Location: 4360 NE 11 Avenue. Oakland Park, FL 33334 RE: Hallandale Drainage Improvements CGA Proposal No. 09-2591.22 Calvin, Giordano & Associates, Inc. 1800 Eller Drive Suite 600 Fort Lauderdale FL 33316 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?(Mandatory in NH) DESCRIPTION OF OPERATIONS belowIf yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIREDAUTOS ONLY 206