Loading...
HomeMy WebLinkAboutReso 2013-2045RESOLUTION NO. 2013- —904 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING DEDUCTIVE CHANGE ORDERS NO. 8-12 TO AGREEMENT WITH SHORELINT FOUNDATION, INC. FOR THE NEWPORT FISHING PIER DEMOLITION AND CONSTRUCTION PROJECT, IN A TOTAL AMOUNT OF TWO HUNDRED SEVENTY -THREE THOUSAND EIGHT HUNDRED EIGHT DOLLARS AND THIRTY -TWO CENTS (S273,808.32), ATTACHED HERETO AS EXHIBIT "A'; AUTHORIZING THE CITY N ANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on September 16; 2010 via Resolution No. 2010 -1605, the City Commission approved an Agreement with Shoreline Foundation. Inc. to provide professional construction services for the demolition and construction of the Historic Sunny Isles Beach/Newport Fishing Pier at Pier Park, in an amount not to exceed Three Million Seven Hundred Seventy -Seven Thousand Eight Hundred Sixty -Six Dollars ($3,777,866.00); and WHEREAS, on June 21, 2012 via Resolution No. 2012 -1927 the City Commission approved Change Order Numbers 1 -4 with Shoreline Foundation, Inc., decreasing the Agreement amount by Eight Hundred Eighteen Thousand One Hundred Fifty -Eight Dollars and Seventy -Nine Cents ($818,158.79), bringing the total Agreement amount not to exceed to Two Million Nine Hundred Fifty -Nine Thousand Seven Hundred Seven Dollars and Twenty-One Cents (S2,959,707.21); and WHEREAS, on June 21, 2012 via Resolution No. 2012 -1928 the City Commission approved Change Order No. 5 with Shoreline Foundation, Inc., increasing the Agreement in an amount not to exceed Thirty-Seven Thousand Six Hundred Five Dollars ($37,605.00), bringing the total amount not to exceed to Two Million Nine Hundred Ninetv -Seven Thousand Three Hundred Twelve Dollars and Twenty -One Cents ($2,997,312.21); and WHEREAS, on July 19, 2012 via Resolution No. 2012 -1942 the City Commission approved Change Order No. 6 to install eight (8) 18" round auger cast piles increasing the Agreement in an amount not to exceed Thirteen Thousand Two Hundred Ninety -Eight Dollars and Forty -Six Cents ($13,298.46), and increasing the contract time by fifteen (15) days, bringing the total amount not to exceed to Three Million Ten Thousand Six Hundred Ten Dollars and Sixty-Seven Cents ($3,010,610.67); and WHEREAS, on November 15, 2012 via Resolution No. 2012 -2000 the City Commission approved Change Order No. 7 and No. 13 for painting of the pier and for additional costs for the Permitted Set of Design Drawings issued on July 19, 2012 in an amount not to exceed Seven Hundred Sixty -Four Thousand One Hundred Dollars and Forty Cents ($764.100.40), bringing the total amount not to exceed to Three Million Seven Hundred Seventy -Four Thousand Seven Hundred Eleven Dollars and Seven Cents (S3,774,711.07). and increasing the contract time by one hundred twenty -seven (127) calendar days; and WHEREAS, on January 30, 2013 via Resolution No. 2013 -2021 the City Commission approved Change Order No. 14 to paint the piles of the pier to add color uniformity to the Newport Pier, in an amount not to exceed Thirty -Eight Thousand One Hundred Two Dollars and Eight Cents 82013- Shoreline CO 8 -12 Fishing Pier Page I of 2 ($38,102.08), bringing the total contract amount not to exceed to Three Million Eight Hundred Twelve Thousand Eight Hundred Thirteen Dollars and Fifteen Cents ($3,812,813.15); and WHEREAS, the City has a tax incentive program in place for the City to purchase materials directly from the subcontractor on behalf of the contractor exempting the City from paying tares resulting in a savings decreasing the Agreement, in an amount of Two Hundred Seventy -Three Thousand Eight Hundred Eight Dollars and Thirty -Two Cents ($273,808.32), and approve Change Orders No. 8 -12 with Shoreline Foundation, Inc., attached hereto as Exhibit "A ", bringing the total contract amount not to exceed to Three Million Five Hundred Thirty -Nine Thousand Four Dollars and Eighty-Three Cents ($3,539,004.83). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Orders No. 8 -12. The City Commission hereby approves Change Orders No. 8 -12 to the Agreement with Shoreline Foundation, Inc., decreasing the Agreement in an amount of Two Hundred Seventy -Three Thousand Eight Hundred Eight Dollars and Thirty -Two Cents ($273,808.32), and approve Change Orders No. 8 -12 with Shoreline Foundation, Inc., attached hereto as Exhibit "A ", bringing the total contract amount not to exceed to Three Million Five Hundred Thirty -Nine Thousand Four Dollars and Eighty-Three Cents ($3,539,004.83). Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 18'h day of Anril 2013. Cr , ATTEST: Jane'A. Hines, CMC, City Clerk APPROVED %AS TO FORM AND LEC7 . AFFICIENCY: Attorney Vote: 5 —O Mayor Edelcup i(Yes) Vice Mayor Aelion _A4(Yes) Commissioner Gatto t/(Yes) Commissioner Levin Yes) Commissioner Scholl V (Yes) Seconded by: SC.NDL-L (No) (No) _(No) _(No) _(No) 82013- Shoreline CO 8 -12 Fishing Pier Page 2 of 2 int., Calvin, Giordano 8 Associates, Inc. E X C E P T I O N A L S O L U T I O N S a Fort Lauderdale Office - 1800 Eller Drive, Suite 600, Fun Lauderdale, Florida 33316 Phone:954.921.7781 Fax: 954.921.8807 ❑ Palm Beach Office - 560 Village Blvd, Suite 340, Nest Nim Beach, Florida 33409 Phone: 561.684.6161 • Fax: 561.684.6360 DATE: 04/10/13 TO: Bill Evans, Asst City Manager FROb1: Chris Giordano, Project Manager SUBJECT: Direct Purchase Option Change Orders PROJECT: Newport Fishing Pier CC: Joel Wadsworth, Project Manager Bill, Memorandum Please see the attached Change Order 8 -12 for the Tax Savings Deductive Purchase Options. The change orders are as follows: CO Ir Description Total Amount Tax Savings Amount CO 8 Steel Rebar ($32,994.80) $1,914.80 C09 Piles ($92,157.10) $5,263.61 CO 10 HVAC Unit ($52,647.20) $3,027.20 CO 11 Railings ($26,340.01) $1,538.11 CO 12 Windows & Doors ($69,669.21) $3,990.71 If you have any questions or would like to discuss this further, please do not hesitate to contact me. Thank you, J�0_ -�� Chris Giordano Project Manager CAUSEM1COI0RDANOIDESKI Ol'VbI EMO 20130410 DPO Ca.WGE ORDERS PIER.DOC CHANGE ORDER No.8 PROJECT: Newport Fishing Pier Demolition & Construction DATE OF ISSUANCE: 7/12/12 EFFECTIVE DATE: 11/06/12 OWNER: City of Sunny Isles Beach OWNER CONTRACT NO.: 10 -07 -02 ENGINEER CONTRACT NO.: 11 -4239 CONTRACTOR: Shoreline Foundation, Inc ENGINEER: Calvin, Giordano & Associates, Inc. You are directed to make the following changes in the Contract Documents Description: Direct Purchase Option for G Proulx DPO No. 12-0001874-100 & 12-0001874-001 Reason for Change Order: Direct Purchase Option Attachments: DPO 12- 0001874 -100 & 12-0001874-001 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times $3,777,866.00 Substantial Completion: 330 calendar days Ready for final payment: 360 calendar days days w dates Net changes from previous Change Orders No. -0- No. Z Net change from previous Change Orders No. -0- No. -7- $ (138,154.93) 142 days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 472 calendar days $3,639,711.07 Ready for final payment: 502 calendar days days or dates Net increase of this Change Order Net Increase of this Change Order $(32,994.80) 0 days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 472 calendar days 53,606,716.27 Ready for final payment: 502 calendar days days of dates RECOMf31ENDED: By: mil/ �-✓ /�_ Joel Wadsworth Calvin, Giordano & ss ciates, Inc. Date: 1 PPRO ED: By: Chris Russo City of Sunny Isles Beach City of Sunny Isles Beach Finance Department SHIP 18070 Collins Avenue To Sunny Isles Beach FL 33160 vEM 60. c n VP0nT.X T,T,(' Purchase Order 11/06/12 City of Sunny Isles Beach DATE 18070 Collins Avenue 12- 0001874 -100 Sunny Isles Beach, FL 33160 No. Tel: 305.947.0606 Fax: 305.949.3113 Purchase Order No. must appear on anlmoices, TOTAL N 31080.00 1. Exempt tram local, Stale, and Federal taxes. 3. Substitutions will not be accepted vvithout prior approval. . 2. C.O.D. or collect shipments will not be accepted. Pmaxva by A4rl Sri S"Cm 0+0awss16100 4, Normal receiving hours are Monday — Friday, 8:30 a.m. to 5:00 p.m. City of Sunny Isles SHIP Finance Department TO 18070 Collins Avenue Sunny Isles Beach / nn^T1 V T T I Beach 1 Purchase Order FL 33160 City of Sunny Isles Beach DATE 9/28/12 18070 Collin Avenue 12-0001874-001 Sunny Isles Beach, FL 33160 No. Tel: 305.947.0006 Fax: 305.949.3113 Purchase Order No. must appear on all Imroices, 1. Exempt from local, State, and Federal taxes. 3. Subsillullons will not be accepted vrithoul prior approval. 2. C.O.D. or collect shipments vdll not be accepted. Produced by AdMNlP S.M. Oea3Cr50: atca 4. Normal receiving ho:as am Monday — Friday, 8:30 a.m. to 5:00 p.m. A AMMO y N.40R NAME SUPPLY VENEOR.NAME SUPKY VENDOR AD4MMV B FLT Et.VO(m oe NUNISER btSGRtPtPON OFP.EZO'I861' SALES TAX 6AVINMs FO hI: �EjEr'4'Io -utog — Malekidli LAmIlB Con(reel : S:SalosTag ' 3 ;N91AmVfcrF dhas 4 2i78ct.w:. 2,Y b5.2,0 :. X0,320 Additional Rebar $23,200.40 $1,360.40 521,840.00 Additional Rebar$CCa FL46rB$ 4y, qvJ f �4, K-0 1 (i}711fsde•tho an;�unt fabododudtod R'orrcenlrao'Fbl -0IiatOo�iUAr xf'f�F.t^'CcNI.�L. °iL' L5 Sao C- 611+✓)X:1wJ (3} 1`UsoPio�lni of ih4, s�1Gg.lay IrwlUd�81u- 1$p�n7gtoifo� purchGSaline item aUp "Tod bylha dotflteatc; (r.�r..i �o :� {vl - nravn7 xr E.�olcc,k�i�n���j 3)Tfte:aotcun� t� Ue aced ii�jPUrahe51h,9 fA marto Iho m'etor�e) purehoso peraha e?nlra:'ate eTaedqusflEll(bs A 'O Sloav '-(- . C>�o - 2 k \9, 20 Su. o0 City of Sunny Ides Beach Finance Department SHIP 18070 Collins Avenue Purchase O r d e r To Sunny Isles Beach FL 33160 6/09/11 City of Sunny Isles Beach DATE ;T' „p 18070 Collins Avenue 11-0001187-100 vakral9d1. = _ i:_ Sunny Isles Beach, FL 33160 No. _ Tel: ,05.0 :7.0605 Fax: 305.949.3113 CORESLAB STRUCTURES TAMPA"'- Purchase Order No. must appear on all lnvoloes. VENDOR correspondence, packages, and shipping papers. 6301 N. 56TH STREET _I TAMPA FL 33610 I Flcrida Sales Tax Exempt No. 65- 8012694687CA 1.00 it JB ! CONSTRUCTION MATERIALS j 1 35- 600.5670 i t i I , 1 I i I I I i i I r I i I ' i I I , I j 239609.50 239609.56 ;239609.56 MTULLOCH IR_�._`,`• \ /-- -- 1. Exemptirom lora. Stale. and Federal taxes. 3. Subslilulions ', - ^I '•n nccnpted wilhmmt prior approval. 2. C.O.D. or cn!l.,cl shipments %6'1 not be accepted. 4. ticnnal recehkirr pro Monday - Friday. 8:30 a.m. to 5:00 p.m. VroEUatlM MINIrTWe $v s•.s MCIVDI8VV CHANGE ORDER I= PROJECT: Newport Fishing Pier Demolition & Construction DATE OF ISSUANCE: 7/12/12 EFFECTIVE DATE: 9/28/12 OWNER: City of Sunny Isles Beach OWNER CONTRACT NO.: 10 -07 -02 CONTRACTOR: Shoreline Foundation, Inc ENGINEER CONTRACT NO.: 11 -4239 ENGINEER: Calvin, Giordano & Associates, Inc. You are directed to make the following changes in the Contract Documents Description: Direct Purchase Option for Florida Rock and Sand DPO 12-0001876-001 Reason for Change Order: Direct Purchase Option Attachments: DPO 12- 0001876 -001 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times $3,777,866.00 Substantial Completion: 330 calendar days Ready. for final payment: 360 calendar days days or dates Net changes from previous Change Orders No. Q No. Net change from previous Change Orders No. g No. -8- $ (171.149.73) 142 J el Wads orth days Contract Price prior to this Change Order Contract Times prior to this Change Order mes Roy Substantial Completion: 472 calendar days $3,606,716.27 Ready for final payment: 502 calendar days Shore 16 Foun days w dates Net increase of this Change Order Net Increase of this Change Order $(92,157.10) 0 Date: days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 472 calendar days 53,514,559.17 Ready for final payment: 502 calendar days days or dates COMME (BED: APPROVED: ACCEPTED: By: B By: J el Wads orth ris Russo mes Roy Calvin, Giordan & A oci to Inc. City of Sunny Isles Beach Shore 16 Foun ion, I c. Date: 1 Date: Date: City of Sunny Isles Beach SNIP Finance Department TO 18070 Collins Avenue Nn�Sunny Isles Beach FL 33160: VE4%pp Wpp 5 ! ' VENDOr$LORIDA ROCK & SAND PRESTiY •' PRECAST CO, INC 15900 SW 408TH STREET SUITE B HOMESTEAD FL 33034 Purchase Order Gity of Sunny Isles Beach DATE 9/28/12 18070 Collins Avenue Sunny isles Beach, FL 33160 No. 12- 0001876 -001 Tel: 305.947.0606 Fax: 305.949.3113 Purchase Order No. must appear on ell Invoices. correspondence, packages, and skip ' papers. r 9/28/2012 1. Fxampt from local. Slate, and Federal taxes. 3. Subsfitutt ms 011 not be accepted without pdor approval. 2. C.O.D. or Collect sidlxnents v,111 not oe accepted. ProDxoE b/MJ9NSCSIK ac . 7r3Nxe1 8103 4. Normal receiving hours am Monday— Friday, 8:30 a.m. to 5:00 p.m 57 SALES TAX-SAVW-1 FORM NAME SUPPCYV---?NIDOR NAME 7J-4,s CeA su P pl?, JN DO B,3 Ao SUPPL,,,..,[-:NDOR PJiON8l4U*M, OLIR -2i17 -11,L 0MV.':tfii,-V OF PROJL'O,'r (4J7hls 15 amount to bo.deducted from chem, . tar lin !!am suppOd qdfitraoWpa CHANGE ORDER No.10 PROJECT: Newport Fishing Pier Demolition & Construction DATE OF ISSUANCE: 11/21/12 EFFECTIVE DATE: 10/18/12 OWNER: City of Sunny Isles Beach OWNER CONTRACT NO.: 10 -07 -02 ENGINEER CONTRACT NO.: 11 -4239 CONTRACTOR: Shoreline Foundation, Inc ENGINEER: Calvin, Giordano & Associates, Inc. You are directed to make the following changes in the Contract Documents Description: Direct Purchase Option for CHM Solutions HVAC DPO 13- 0000168 -100 Reason for Change Order: Direct Purchase Option Attachments: DPO 13- 0000168 -100 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times $3,777,866.00 Substantial Completion: 330 calendar days Ready for final payment: 360 calendar days days or dates Net changes from previous Change Orders No. Q No. -9- Net change from previous Change Orders No. -0- No. -9- $ (263.306.83) 142 days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 472 calendar days $3,514,559.17 Ready for final payment: 502 calendar days days or dates Net increase of this Change Order Net Increase of this Change Order $(52,647.20) 0 days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 472 calendar days $3,461,911.97 Ready for final payment: 502 calendar days days or dates RECOMME DE APPROVE ACCEPTED: By:� By: By: Joel Wadsworth Chris Russo James oyo Calvin, Giordano &�so�ates, Inc. City of Sunny Isles Beach Shoreli Fou a io Inc. Date: / Date: Date: C City of Sunny Isles Beach Finance Department sNlp 18070 Collins Avenue To Sunny Isles Beach FL 33160 VEDA; �0. CNH SOLUTIONS, INC VENDO%917 VISTA PARKWAY NORTH •••� SUITE 2 WEST PALM BEACH FL 33411 Purchase Order 10/18/12 City of Sunny Isles Beach DATE 18070 Collins Avonue 13- 0000168 -100 Sunny Isles Beads FL 33160 No. Tel: 305.947.0606 Fax: 305.949.3113 Purchase Order No. must appear on all Imoioes, corresoondence. Dackaaes. and sHoohno DeDers. NET 3a 1. Exempt from local, Slate, and Federal taxes. 3. 6uhsti:ubons "it not Fs ecn:Ned ailhoul prior approval. 2. C.O.D. or collect shipments will not ba accepted. 4. r §anal unciving hours nn: r.1anday — Friday, 8:30 am to 5:00 p.m Pry Dy A6itiisunle Se D403'0:018100 A t] SALES TAX SAVINGS FORM CONTRACT # RFP #10 -07 -02 AWARDED VENDOR NAME Shoreline Foundation, Inc. SUPPLY VENDOR NAME CIVIH Solutions, Inc. SUPPLY VENDOR ADDRESS 14100 Palmetto Frontage Rd Suite 114, Miami Lakes, FL 33016 SUPPLY VENDOR PHONE NUMBER 305 - 824 -8841 DESCRIPTION OF PROJECT Newport Fishing Pler HVAC Units (2) Materials 1 Amt in Contract 2 Sales Tax 3 Net Amt for Purchase AHU -1- 15 Ton Unit 1£ AHU -2- 5 Ton Unit 53,093.40 3,473.40 49,620.00 (1) This is the amount to be deducted from contract by change order (2) The amount of the sales tax included in the material purchase line item supplied by the contractor (3) The amount to be used by Purchasing to make the material purchase per the contractor's stated quantities CHANGE ORDER No. 11 PROJECT: Newport Fishing Pier Demolition & Construction DATE OF ISSUANCE: 11/21/12 EFFECTIVE DATE: 10/05/12 OWNER: City of Sunny Isles Beach OWNER CONTRACT NO.: 10 -07 -02 CONTRACTOR: Shoreline Foundation, Inc ENGINEER CONTRACT NO.: 11 -4239 ENGINEER: Calvin, Giordano & Associates, Inc. You are directed to make the following changes in the Contract Documents Description: Direct Purchase Option for Saftron DPO 1 3- 00001 7 1 -001 Reason for Change Order: Direct Purchase Option Attachments: DPO 13- 0000171 -001 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times $3,777,866.00 Substantial Completion: 330 calendar days Ready for final payment: 360 calendar days days or dates Net changes from previous Change Orders No. -0- No. -10- Net change from previous Change Orders No. -0- No. -10- $ (315 954.03) 142 day. Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 472 calendar days $3,461,911.97 Ready for final payment: 502 calendar days days or dates Net increase of this Change Order Net Increase of this Change Order $(26,340.011 0 days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 472 calendar days $3,435,571.96 Ready for final payment: 502 calendar days days or dates ECOMMENDED: By: Joel Wadsworth Calvin, Gior ano & ss ciates, Inc. Date: ti/ 1 l-? PPROVE 8y: Chris Russo City of Sunny Isles Beach ACCEPTED: By: q ame Royo Shore ne Fou Inc. Date City of Sunny Isles Beach Finance Department SHIP 18070 Collins Avenue 4. TO Sunny Isles Beach FL 33160 VE4e59o• F SAFTRON +" VENDOR r' 6012 33RD STREET EAST BRADENTON FL 34203 'Purchase Order 10/05/12 City of Sunny Isles Beach DATE 18070.CoillnsAvenue 13-0000171-001 Sunny Isles Beach, FL 33150 No. Tel: 3D5.947.0606 Fax: 305.949.3113 Purdmae Order No. must appear on all invoices, Nn 1. Exempt from kcal. State, and Federal taxes. 3. Substitutions vAl not be accepted vAlhout prior approval. 2. C.O.D. or collect shipments will not be aaepted. R.w by A7ri•Yo-c.. s.Iw. o ' ;oroo A. Normal receNing hours ere Monday — Friday, 8:30 am. to 5:00 p.m. m UNIT COST 1.00 JB ADDU*TIONAL RAILING MATERIALS 24801.90 24801.9 I( I 35- 600.5670 $24801.90 TOTAI. j 24801.9 1. Exempt from kcal. State, and Federal taxes. 3. Substitutions vAl not be accepted vAlhout prior approval. 2. C.O.D. or collect shipments will not be aaepted. R.w by A7ri•Yo-c.. s.Iw. o ' ;oroo A. Normal receNing hours ere Monday — Friday, 8:30 am. to 5:00 p.m. W48 TPDXI�ACN08 FORM -00MMAUTO ppp � to-d-T-652 AWARDED VENDOR NAME -SV1 PLY VI_Ntibk NAP4E :SHBt'LY 3Lcgb.Q*g �4ORPP —1�=Jz %C - .Z1h I F� JFL '--04—gnejS .SlJP.PLY.-VEND0J9 PHO( NIJMBhEk DESCRIPTION OF'PROJECT omiroslifo Atjabo deducted from'conlraqtjbpohan*Sj.order ?W�iQ(A 66�4S;49�aZi�4� (2) Thda`m0Phf,.&-th6 sales:jax includdIn thomplorw puzam. =0.qvpp-ke4 b -VQTj--c &',r 7S/ - AoJ,-.Q used by-Purchasing to. make the Mate-Ml omrowtv at , atedqugqfj(163 AdditiVal Railing Bata Lals $ - 26,3iO.02 $1,538.11 $24,601.90 omiroslifo Atjabo deducted from'conlraqtjbpohan*Sj.order ?W�iQ(A 66�4S;49�aZi�4� (2) Thda`m0Phf,.&-th6 sales:jax includdIn thomplorw puzam. =0.qvpp-ke4 b -VQTj--c &',r 7S/ - AoJ,-.Q used by-Purchasing to. make the Mate-Ml omrowtv at , atedqugqfj(163 CHANGE ORDER No. 12 PROJECT: Newport Fishing Pier Demolition & Construction DATE OF ISSUANCE: 11121/12 EFFECTIVE DATE: 9/28/12 OWNER: City of Sunny Isles Beach OWNER CONTRACT NO.: 10 -07 -02 CONTRACTOR: Shoreline Foundation, Inc ENGINEER CONTRACT NO.: 11 -4239 ENGINEER: Calvin, Giordano & Associates, Inc. You are directed to make the following changes in the Contract Documents Description: Direct Purchase Option for CGI Windows and Doors DPO 12- 0001875 -001 Reason for Change Order: Direct Purchase Option Attachments: DPO 12-0001875-001 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times $3,777,866.00 Substantial Completion: 330 calendar days Ready for final payment: 360 calendar days days or dates Net changes from previous Change Orders No. -0- No. -11- Net change from previous Change Orders No. -0- No. -11- $ (342.294.041 142 days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 472 calendar days $3,435,571.96 Ready for final payment: 502 calendar days days or dates Net increase of this Change Order Net Increase of this Change Order $(69,669.21) 0 days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 472 calendar days $3,365,902.75 Ready for final payment: 502 calendar days days or data, OM,,,M ///Eff�y�pp-FEEppp /f PPROVED: ACCEPTED: By: By: ( /- 6 By: tcel Wadsworth Chris Russo amen yo Calvin, Giordano & Aysogiates, Inc. City of Sunny Isles Beach Shoreline ound ti , Inc. Date: �/ / —�� Date: Date: City of Sunny Isles Bcach Finance Department TOHIP 18070 Collins Avenue Purchase Order Sunny Isles Beach FL 33160 City of Sunny Isles Beach 18070 Collins Avenue VEFY6�0. Sunny Isles Beach, FL 33160 No. V .'`° •3 Tel: 305.947.0606 Fax: 305.949.3113 GI IMPACT RESISTANT WINDba; Purchase Order No. must VENDOF� ..- correspontlenee, package & DOORS 10100 NW 25TH STREET MIAMI Fig 33172 1.00 I JB ( WINDOWS & DOORS 20- 600.5670 j 9/28/201 Flora':, :;ales Tax Exeml $65678.50 i I TOTAL DATE 9/28/12 12- 0001875 -001 appear s. and s 65678.5 Ira City Manager 1. Exempt from load, Slate, and Federal tares. 3, vAll not M scmoled ai" od pdn; :yyunval. 2. C.O.D. or tolled shipments rd0 not ac accepted. a. IJonnal receivGn: hours au Monday - - riday. 11:30 am. to 5:DO p.m. fkWG gbaYC "Y V ScMM C40= 111 MCa 65678.50 65678.50 FI CONTRACT fl AWARDED VEND-OH SUPPLY VENDOR HA SUPPLY VENDOR ALL)PF"'S • SUPPLY VENDOR I'l-1ki::FR DESCRIPTION OF PROJECT SAt.f-ST-):-' FP'7" I ar & Doors ';iami. 33172 0,142 (1) m C Windows & Da ors per clL eic 315; — ---------- . ..... (1) This is the; mci!,ii t-, :,c fr.wi cc.n:m—. (2) The amount of we sa4a tax inc :jljpc: in the im.:.,.i by the contrac�^r (3) The amour: lo be asr: I by °• -iisr 9 to :n-Ke stated quantitie-, id Doo I lirect Purchase Ix j X0.71 :;plied ;�"'J: ": , '! ; ' '!!o co; -Ictor's City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947 -0606 City Hall (305) 949.3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Bill Evans, Assistant City Manager DATE: 4/18/2013 RE: A Resolution Approving a Construction Change Order #8 through #12 to Agreement with Shoreline Foundation, Inc. for the Newport Pier Project. RECOMMENDATION: We recommend the City Commission approve the attached Resolution REASONS: The City has a tax incentive program in place which allows the City to recognize additional savings after construction projects have been awarded to a contractor. The savings are recognized when the City purchases materials directly from the subcontractor on behalf of the contractor for the benefit of the public project. The City is exempt from paying tax, where the contractor is not. The authority to make these purchases is under the master contract. As a result of these direct purchases, the City prepares a deductive change order (for the gross amount) to recognize the decrease in direct contractual obligation to the vendor. Attached includes deductive change orders #8-12 for a total of $273,808.32, the City recognize a savings on these change orders for $15,734.43. ADDITIONAL INFORMATION: Attached is a recap of the Shoreline Contract. ATTACHMENTS: • Contract Summary • Resolution • Change Orders . Aeenda Item No IOE Nate 3/182013 119 Contract Impact on rac Balance Enter Into Contract with Shorel I ne Foundation - 3,777,866.00 Description of Change Orders Already Presented to Commission Change Order 41 DPO- Coreslab (250,000.00) 3,527,866.00 Change Order #2 DPO- Florida Rock & Sand Piles (408,474.40) 3,119,391.60 Change Order 113 DPO -G. Proulx, LLC (42,789.20) 3,076,602.40 Change Order 94 DPO- Saftron- Railing (116,895.19) 2,959,707.21 Change Order #5 Remobilizatlon Costs 37,605.00 2,997,312.21 Change Order 96 Install 8 -18" round auger cast plies In lieu of 6- 24" x 24" piles 13,298.46 3,010,610.67 Change Order #7 and #13 Changes related the the Permitted Set of es gn Drawings an updating the paint colors. 764,100.40 3,774,711.07 Change Order #14 Updating the paint colors for the Piles. 38,102.08 3,812,813.15 Description of Change Orders To Be Presented to Commission Today Change Order #8 DPO -G. Provlx, LLC (32,994.80) 3,779,818.35 Change Order #9 OPO- Florida Rock & Sand Piles (92,157.10) 3,687,661.25 Change Order #10 DPO-CMH Solutions (52,647.20) 3,635,014.05 Change Order #11 DPO- Saftron - Railing (26,340.01) 3,608,674.04 Change Order 012 DPO -CGI Windows and Doors (69,669.21) 3,539,004.83