Loading...
HomeMy WebLinkAboutReso 2013-2046RESOLUTION NO. 2013 - ZOy(o A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO UTILIZE GENERAL CONSULTING FIRMS ON THE APPROVED LIST TO PROVIDE PROFESSIONAL ENGINEERING AND SURVEYING SERVICES FOR VARIOUS CITYWIDE PROJECTS, IN AN AMOUNT NOT TO EXCEED ONE HUNDRED THOUSAND DOLLARS (S100,000.00), PROVIDED THAT CONTRACTS WITH THE CONSULTING FIRMS ARE REVIEWED AND APPROVED BY THE CITY ATTORNEY; AUTHORIZING THE CITY MANAGER AND THE CITY ATTORNEY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Sunny Isles Beach issued Request for Qualifications No. 12 -04 -02 for Continuing Professional Architectural & Engineering Services Firms Only (CCNA) for the provision of general architectural and engineering services to the City; and WHEREAS, on November 15, 2012 via Resolution No. 2012 -1997 the City Commission approved the following shortlisted qualified firms to perform engineering, architectural, landscape architectural and land surveying services: Bermello Ajamil & Partners, Inc., Calvin Giordano & Associates. Inc., RJ Behar & Company, Inc., and CES Consultants; and WHEREAS, the current City policy limits the amount of payments to a single vendor in a single fiscal year to $25,000.00 in aggregate, and once this limit is reached, all purchases must be presented to the City Commission for approval delaying projects or portions of projects; and WHEREAS, the City Commission wishes to authorize the City Manager to utilize these General Consulting Firms to provide professional engineering and surveying services for various Citywide projects in an amount not to exceed One Hundred Thousand Dollars ($100,000.00). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Authorization of City Manager. The City Commission hereby authorizes the City Manager to utilize General Consulting Firms on the approved list to provide professional engineering and surveying services for various Citywide projects, in an amount not to exceed One Hundred Thousand Dollars ($100,000.00), provided that contracts with the Consulting Firms are reviewed and approved by the City Attorney. This authority provided to the City Manager shall sunset on October 1, 2014. Section 2. Authorization of City Manager and City Attorney. The City Manager and the City Attorney are hereby authorized to do all things necessary to effectuate this Resolution. 82013- En¢ And Sun -eying Sn• Blanket Authority Page I of 2 Section J. Effective Date. This Resolution %will become effective upon adoption. PASSED AND ADOPTED this 18d' day of April 2013 ATTEST: Jane A. Hines. CMC. ity Clerk AND Vote: 6 —(7 TO FORM fFICIENCY: Cly Attorney S. Edelcup, Mayor Moved by: t r A f "r,j a Seconded by: l.ZMnMG& nr3sez Lsy 'o Mayor Edelcup ✓(Yes) _(No) Vice Mayor Aelion ✓(Yes) (No) Commissioner Gatto (Yes) (No) Commissioner Levin Yes) (No) Commissioner Scholl (Yes) _(No) 82013- Eng And Su eying Sry Blanket Authority Page 2 of 2 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947 -0606 City Hall (305) 949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Bill Evans, Assistant City Manager Helen Gray, PE, City Engineer DATE: 4/18/2013 RE: A Resolution Authorizing the City Manager to Utilize General Consulting Firms on an Approved List to Provide Professional Engineering and Surveying Service for Various Citywide Projects RECOMMENDATION: We recommend City Commission approve the resolution. REASONS: Current City policy limits the amount of payments to a single vendor in a single fiscal year that can be approved administratively by the City Manager to $25,000 in aggregate. Once this limit is reached, all purchases must be presented to City Commission for approval including ratification of funds expended on previously approved work, materials, or services. In order to implement either capital or repair and maintenance projects, the City processed an RFQ for professional consulting services for companies to perform professional engineering, land surveying, architectural and landscape architectural services. Four firms were selected and subsequently approved by City Commission to perform related services and include Calvin, Giordano & Associates, Bermello Ajamil & Partners, Inc., RJ Behar & Company Inc. and CES Consultants, Inc. We have found that current City policy may result in delays to projects or portions of projects pending formal Commission approval of various professional services contracts; the delay could be as much as six weeks. Increasing the current $25,000 threshold will facilitate more rapid implementation of projects or portions of projects. This Agenda Item No. IOF Date 1/182013 141 request is to increase that threshold to $100,000. In this fiscal year, the following Work Authorizations have already been approved administratively: Calvin Giordano & Associates totals $23.502.50 and includes: Engineering services related to utility service line design, permitting and installation at the Public Works modular under the Lehman Causeway in the amount of $5,675.25. Preparation of an Elevation Certificate for the Public Works Modular under the Lehman Causeway as required by Florida Building Code in the amount of $625.00. Engineering services related to electrical and lighting design for area lighting at Gwen Margolis Park for installation by the contractor installing artificial turf at the park in the amount of $6,373.50. Land surveying services for the preparation of a route survey in support of the solid wall under the Lehman Causeway in the amount of $5,027.50. Field Inspection, Construction Administration and Closeout services for the utility line installation from Collins Avenue to the pier project in the amount of $5,801.25. CES Consultants. Inc. totals $3.450.00 includes: Geotechnical investigations, laboratory evaluation and engineering analysis and report for soils conditions on the Intracoastal Park in support of foundation design (by others) in the amount of $3,450.00. COST: None at this time. FUNDING SOURCE: Funding is available in the respective capital projects budget. ATTACHMENTS: e Resolution Agenda Item No.I OF Dare 1/18/2013 142