Loading...
HomeMy WebLinkAboutReso 2013-2056 RESOLUTION NO. 2013 -. lo A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH,FLORIDA,APPROVING CHANGE ORDER NO. 1 TO AGREEMENT WITH USA SHADE & FABRIC STRUCTURES, INC. FOR THE INSTALLATION OF A PLAYGROUND CANOPY AT HERITAGE PARK, IN AN AMOUNT NOT TO EXCEED SEVEN THOUSAND FIVE HUNDRED THIRTY- FIVE DOLLARS, ($7,535.00), ATTACHED HERETO AS EXHIBIT "A", BRINGING THE TOTAL CONTRACT AMOUNT TO THREE HUNDRED FORTY-TWO THOUSAND ONE HUNDRED FIFTY- EIGHT DOLLARS (S342,158.00); AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on July 1, 2011, the City advertised and issued Request for Proposals (RFP) No. 11-10-01 for the design,permitting,and installation of the playground canopies at Heritage Park and Golden Shores Park; and WHEREAS, on December 22, 2011 via Resolution No. 2011-1830 the City Commission approved an Agreement with USA Shade & Fabric Structures, Inc. for the design, permitting, and installation of the playground canopies at Heritage Park and Golden Shores Park, in an amount not to exceed Three Hundred Thirty-Four Thousand Six Hundred Twenty-Three Dollars($334,623.00);and WHEREAS, in the course of performing the work, the installers encountered an unknown underground condition, specifically an asphalt parking lot that delayed the project and incurred additional expenses in equipment rental and personnel to complete the project; and WHEREAS,USA Shade&Fabric Structures,Inc.is seeking compensation to account for the additional scope of work that was unknown at the time of contract award,and provided the City with Change Order No. 1 in an amount not to exceed Seven Thousand Five Hundred Thirty-Five Dollars ($7,535.00); and WHEREAS, the City wishes to approve Change Order No. 1 to the Agreement with USA Shade& Fabric Structures, Inc. for the additional scope of work for the installation of a Playground Canopy at Heritage Park, in an amount of Seven Thousand Five Hundred Thirty-Five Dollars ($7,535.00), attached hereto as Exhibit "A", bringing the total contract amount not to exceed to Three Hundred Forty-Two Thousand One Hundred Fifty-Eight Dollars ($342,158.00). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order No. 1 to Agreement. The City Commission hereby approves Change Order No. 1 to Agreement with USA Shade & Fabric Structures, Inc. for the installation of a playground canopy at Heritage Park, in an amount not to exceed Seven Thousand Five Hundred Thirty-Five Dollars ($7,535.00), attached hereto as Exhibit "A", bringing the total 82013-USA Shade CO Ito Agmt Canopy at Heritage Pk Page I of 2 contract amount not to exceed to Three Hundred Forty-Two Thousand One Hundred Fifty-Eight Dollars ($342,158.00). Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 16th day of May 2013. C.- t ` &t. No an S. Edelcup; Mayor 1- ATTEST: • ; t t ` IS.ir b t a _s `• `Jane,A. Hines, CMC, City Clerk .(, o . •.3 - APPROVED AS TO FORM AND c,AL SUFFICIENCY: "(if �• s I inot.City Attorney • Moved by: N v 2 MetOY 1\4A_t 0 Seconded by: Cpmvn.SStOucce G A770 Vote: S-0 Mayor Edelcup ✓(Yes) _(No) Vice Mayor Aelion V(Yes) (No) Commissioner Gatto _V(Yes) (No) Commissioner Levin t/ (Yes) _(No) Commissioner Scholl V(Yes) (No) 82013-USA Shade CO Ito Agmt Canopy at Heritage Pk Page 2 of 2 111111 SUNNY ISLES BEACH ORDER or SON CHANGE ORDER NUMBER: 1 DATE: 3-11-2013 PROJECT: DESIGN AND BID NUMBER: 11-10-01 CONSTRUCTION OF CANOPY STRUCTURES AT HERITAGE PARK AND GOLDEN SHORES PARK RE SOLUTION NUMBER: ORIGINAL DOLLAR CONTRACT AMOUNT: $334,623.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: I $0.00 DOLLAR AMOUNT OF THIS CHANGE ORDER: l $7,535.00 CREDIT/DIRECT PURCHASES: I $0 NEW DOLLAR CONTRACT AMOUNT: I $342,158.00 • ORIGINAL CONTACT COMPLETION DATE TOTAL OF PREVIOUS CHANGE ORDER DAYS: AMOUNT OF DAYS PER THIS CHANGE ORDER: NEW CONTRACT COMPLETION DATE: • DESCRIPTION OF SCOPE OR WORK CHANGES: Underground Obstructions NOTE: Unless specifically stated clearly elsewhere on this page, this change order does NOT indude an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, ma w: materials, overhead, profit and delay relating to the issues set forth in this document. r , tjl CONTRACTOR USA Shade CITY ATTORNEY: Hans Ottinot PROJECT MANAGER: Susan Simpson La I Y MANAGER: Christopher Russo sotNY ``° City of Sunny Isles Beach ^ 18070 Collins Avenue Sunny Isles Beach, Florida 33160 '''.•; ) iS3 s4 (305)947-0606 City Hall �e rho e r' o. sun ''" (305)949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Susan Simpson, Cultural and Community Services Director DATE: 5/16/2013 RE: Approval of Change Order No. 1 to Agreement with USA Shade & Fabric Structures, Inc. for the Installation of a Playground Canopy at Heritage Park RECOMMENDATION: We recommend that the City Commission approve the attached resolution to approve Change Order No. 1 to Agreement with USA Shade & Fabric Structures, Inc. for the Installation of a Playground Canopy at Heritage Park in an amount not to exceed $7,535.00 (Seven Thousand, Five Hundred Thirty Five Dollars). Approval of this Change Order will increase the total contract price from $334,623.00 to $342,158.00 for both Golden Shores Park and Heritage Park. REASONS: The City approved Contract Number C 1112-008 with USA Shade & Fabric Structures, Inc. for the installation of playground canopies at Golden Shores Park and Heritage Park in the amount of $334,623. In the course of performing the work at Heritage Park, the installers encountered an unknown underground condition, specifically an asphalt parking lot and miscellaneous debris that delayed the project and incurred additional expenses in equipment rental and personnel to complete the project. USA Shade is seeking compensation to account for the additional scope of work that was unknown at Heritage Park at the time of contract award. The City was advised of and inspected the site at the time and confirmed the condition. Agenda Item No.IOC Date 5/162013 68 ADDITIONAL INFORMATION: The City's Engineer reviewed the submittal and concurs that the charges are consistent with the scope of work. The additional work at Heritage Park as specified in the Change Order attached is completed. There is an open item regarding the seams of the safety surfacing that is being managed through the retention. Although approval is requested for the Change Order, final payment to USA Shade will not be made until final approval of all work is issued. FUNDING SOURCE: Funding is available in account number#35-600-5663 ATTACHMENTS: • Resolution • Change Order No. 1 Agenda Item No.IOC Date 5/16/2013 69