HomeMy WebLinkAboutReso 2013-2061 RESOLUTION NO. 2013 - 20(„I • A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING THE THIRD AMENDMENT TO AGREEMENT WITH BEISWENGER, HOCH AND ASSOCIATES, INC. (BH&A), TO PROVIDE POST DESIGN SERVICES FOR THE SUNNY ISLES BEACH/NEWPORT FISHING PIER, IN AN AMOUNT NOT TO EXCEED FIFTEEN THOUSAND DOLLARS (S15,000.00), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on March 17; 2011 via Resolution No. 2011-1693, the City Commission ratified an Agreement with Beiswenger, Hoch and Associates to provide post design services for the Sunny Isles Beach Pier a/k/a Newport Fishing Pier located at 16701 Collins Avenue, in a total amount not to exceed Forty-One Thousand Dollars ($41,000.00); and WHEREAS, on May 10, 2012 via Resolution No. 2012-1911, the City Commission approved the First Amendment to Agreement with Beiswenger, Hoch and Associates, Inc., to provide post design services for the Sunny Isles Beach/Newport Fishing Pier, in an amount not to exceed Eleven Thousand Three Hundred Thirty-Seven Dollars and Fifty Cents ($11,337.50), for a total contract amount of Fifty-Two Thousand Three Hundred Thirty-Seven Dollars and Fifty Cents ($52,337.50); and WHEREAS, on June 21, 2012 via Resolution No. 2012-1923. the City Commission approved the Second Amendment to Agreement with Beiswenger, Hoch and Associates, Inc., to provide post design services for the Sunny Isles Beach/Newport Fishing Pier, in an amount not to exceed Seven Thousand Three Hundred Ten Dollars ($7,310.00), bringing the total contract amount to Fifty-Nine Thousand Six Hundred Forty-Seven Dollars and Fifty Cents ($59,647.50); and WHEREAS, the City now desires to approve the Third Amendment with BH&A and their sub-consultants for post design services for the Sunny Isles Beach/Newport Pier Project; and WHEREAS, Beiswenger, Hoch and Associates has expressed their ability and desire to provide these services subject to the terms and conditions contained within the Third Amendment to Agreement, and submitted a proposal to provide these services for the Sunny Isles Beach/Newport Pier Project; and WHEREAS, the City wishes to approve the Third Amendment to Agreement with Beiswenger. Hoch and Associates to provide post design services for the Sunny Isles Beach/Newport Fishing Pier, in an amount not to exceed Fourteen Thousand Two Hundred Fifty Dollars ($14,250.00), and an additional Seven Hundred Fifty Dollars ($750.00) for any incidentals that may come up for a total amount not to exceed Fifteen Thousand Dollars, ($15,000.00), attached hereto as Exhibit "A", bringing the total amount of this contract to Seventy-Four Thousand Six Hundred Forty-Seven Dollars and Fifty Cents ($74,647.50). R2013-BHA 3rd Amendment to Agmt Pier Page 1 of 2 NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approving the Third Amendment to Agreement. The Third Amendment to Agreement with Beiswenger. Hoch and Associates, Inc., to provide post design services for the Sunny Isles Beach Newport Fishing Pier, in an amount not to exceed Fifteen Thousand Dollars (S15,000.00), attached hereto as Exhibit "A", be and the same, is hereby approved. Section 2. Authorization of Mayor. The Mayor is hereby authorized to execute said Agreement. Section 3. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 4. Effective Date. This Resolution will become effective upon adoption. PASSED AND. L; ADOPTED this 16th day of May 2013. aC : I // f N• an S. Edelcup, Mayor 'AT TEST: (.; : • 1`t °I itatta- Pc . 'Jane A. Hines; CMC, City Clerk ,. 1 'i - a . .#.\i > APPROV PAS TO FORM AND L• • S FFICIENCY: IibJ•4rs I' trot, C ty Attorney Moved by: n l_,pryNVMSSt oioxQ c a� Seconded by: �mw cc.1ok.A.2 -TrO Vote: S-O Mayor Edelcup ✓(Yes) (No) Vice Mayor Aelion 1/(Yes) (No) Commissioner Gatto ✓(Yes) _(No) Commissioner Levin / (Yes) (No) Commissioner Scholl ✓(Yes) (No) R2013-BHA 3`1 Amendment to Agmt Pier Page 2 of 2 THIRD AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF SUNNY ISLES BEACH AND BEISWENGER, HOCH AND iy D ASSOCIATES, INC. CONTRACT NO. C1213-028 This Third Amendment to the Agreement between the City of Sunny Isles Beach and Beiswenger. Hoch and Associates, Inc., executed this 16th day of May, 2013, is made a part of the original Agreement, C1011-031 ("Agreement"), approved by Resolution No. 2011-1693 on March 17, 2011 and incorporated herein by reference, between the City of Sunny Isles Beach ("City") and Beiswenger, Hoch and Associates, Inc. ("Consultant") a business corporation licensed in the State of Florida. whose Federal Identification II is 59.0751610. The City and Consultant hereby agree as follows: 1. ADDITIONAL SERVICES TO BE PERFORMED. The scope of services, as set forth in Section 2 of the original Agreement, is hereby amended to include the Third Revision to Sunny Isles Beach Pier & Restaurant as more particularly described in Attachment "A", which is attached hereto and incorporated herein by reference. 2. COST. The payments to the Consultant, as set forth in Section 4 of the original Agreement, is hereby amended to include additional compensation for the additional services to be performed, in an amount not to exceed Fifteen Thousand Dollars ($15,000.00), bringing the total contact amount not to exceed Seventy Four Thousand Six Hundred Forty Seven Dollars And Fifty Cents ($74,647.50). 3. OTHER PROVISIONS REMAIN IN EFFECT: Except as specifically modified herein, all terms and conditions of the original Agreement between the parties, dated March 17, 2011, and the First and Second Amendment thereto shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this document as of the date mentioned above. WITNESS: BEISWENGER, HOCH AND ASSOCIATES, INC. Signature BY: Print Name Signature and Title ATTEST: CITY OF SUNNY ISLES BEACH BY: Jane A. Hines, CMC, City Clerk BY: ' �1 - //�.,/ N. an S. Edelcup, Mayor APPROVED AS TO FORM AND LEGAL SUFFIIII/ENCYY BY: _eI� ` H. Ottinot, ity Attorney Slg ENGINEERS B H ARCHITECTS 510 Shotgun Road, Suite 400 PLANNERS Sunrise, Fl 33326 WWW.BHAENG.US I TYPSA GROUP I WWW.TYPSA-ES FEID No. 59-0751610 Phone (954)-334-9000/Fax (954)-334-2800 Invoice Revised: May 8,2013 To: City of Sunny Isles Beach Date Prepared:January 26, 2013 Attn:Account Payable Invoice No. 11 18070 Collins Avenue BHA Job. No. 266,Task 004 Sunny Isles Beach, FL 33160 Post Design Services Newport Fishing Pier Replacement Contract No. C1011-031 ,Services: July 23, 2012 thru November 26, 2012 Total Lump Sum Fee $74,647.50 ($41,000+$ 11,33 7.50(1)+57,310.00(2)+515,000(3) Fee Earned to Date $70,517.50 Less Previous Billings $59,627.50 Fee Remaining $4,130.00 Amount Due This Invoice $10,890.00 PROGRESS REPORT 1.Work performed from July 23,2012 thru November 26,2012 2. Refer to attachments for Backup Information nn �� `/f 7 BOTAS: 17 Hrs x $ 120.00 = $ 2,040.00 BHA: 22.75 Hrs x $ 120.00 = $ 2,730.00 Project Caine: 79 Hrs x $ 120.00 = $ 9,480.00 $ 14,250.00 Left in the Contract 4, 130.00 $ 10, 1 02 00 k/(C° ,:eite(14 (c. ta- J " Si as BHA AND BOTAS WORK FROM NOVEMBER 26, 2012 TO THE PRESENT SIB Shop Drawings/ RFI's/ Clarifications received after November 26, 2012 meeting to Present Hours Description 0.25 1. Restaurant Chimney Roofing (email from CGA dated 11/28/2012 - BHA 2. Grease Trap, Salt Water Distribution & Fire Protection Shop Drawings (74Rev3)- Project Caine 1 3. Restaurant Slab Ultrasonic Testing email from CGA dated October 18,2012) - Botas 0.5 4. Paint for PVC Piping (Submittal No. 95) - BHA 5. RFI # 107 Restaurant-Kitchen Exhaust fan & duct Relocation- Project Caine 6. Mechanical Submittals: Revised Submittal # 29M-Rev-1-Fire Damper& New Submittal # 97M60"x60"-Return Air Vent- Project Caine 0.25 7. RFI # 107 Restaurant-Kitchen Exhaust fan & duct Clarification - BHA 8. RFI # 106 Proposed Return Air Vent & CMU in Mechanical Rook - Project Caine 0.25 9. RFI # 108 Soffit Attachment Detail - BHA 2 10. Concrete Patching Material- BHA 11. UPS Submittal (email CGA dated December 18, 2012) - Project Caine (Items 11 & 16) N/C 12. RFI # 114-Clarification on Wall Finishes - BHA N/C 13. RFI # 113- Clarification on Drywall Framing System - BHA 0.25 14. Restaurant Plumbing Pipes not constructed as shown on the plans- BHA N/C 15. Need Pier Painting Clarification- BHA 16. Newport-UPS Submittal Unistar III - Project Caine (Included in Item 11) N/C 17. RFI # 114 Clarification on Wall Finishes (Third email) - BHA 18. Submittal No. 20 Switchgear- Project Caine 19. Light Fixtures- Project Caine 0.25 20. Insulation Requirement (CGA email dated January 8, 2013) - BHA 21. Mechanical Submittals -60"x60" Return Air Vent (Silencer+Grill) - Project Caine 0.25 22. RFI # 115 Proposed Mechanical Duct Layout Plan-2nd Floor) - BHA 23. Submittal 27(R1)-Greenheck EVH602 Louvers - Project Caine 0.25 24. Stair Soffit (email from CGA dated January 16, 2013) - BHA 3 25. Railing Submittal from SAFTRON - BHA 26. Return Air Grille & Silencer submittal - Project Caine 0.5 27. RFI # 107 Restaurant - Kitchen Exhaust fan & duct - BHA(0.5 hrs) 28. Newport Pier-Concrete Mix Design, Submittal 103- Concrete Mix Design - For 2" Topping And 2 Curb Mechan - Botas 29. Grease Trap-Below Grade Installation Detail - Project Caine 0.25 30. RFI # 114 Clarification on Wall Finishes (Fourth email) - BHA 31. Mechanical Submittals 60"x60" Return Air Vent (Silencer+Grill) - Project Caine 2 32. RFI # 120- Beam Penetrations required for Electrical Conduits- Botas 33. RFI # 119 Electrical Clarification- Project Cane 34. Meter Cans & main Disconnets - Project Caine 1 35. Submittal Hood - CGA requesting a site meting for BHA ( 1 Hr) 0.5 36. Proposed Salt Water Distribution line BHA (0.5 hrs) 37. Submittal 22 - Rev. 1 - Fire Alarm Submittal - Project Caine 2 38. Saffron Railing - BHA 0.25 39. Acoustical Ceiling Tiles & Grid System (Samples included) - BHA 40. Proposed Salt Water Distribution System (email from CGA dated 1/30/2013) Botas = 5 hrs and BHA 11.75 hrs (Total = 16.75) S / 8 Shop Drawings/ RFI's/Clarifications received after November 26, 2012 meeting to Present 41.Submittal#94-Salt Water System Distribution System -Project Caine/BHA N/C 1 42 RFI# 122-6 Inch Core in Stairwell's CMU Wall inch Fire Line-Botas 0.75 43. RFI# 123-STUCCO SCORE LINES and Electrical Room Walls- BHA(0.75)hrs 5 44. RFI# 125 Plumbing Penetration -Botas 1 45. Proposed Topping/Slab Mechanical Rool- Botas(1 hr) 0.25 46. Submittrasl No. 10 106, 107, 108,109,45R(2 sheets) BHA 2 47. Submittal# 112-Steel Cover Plates-BHA 1 48. 1st Floor HVAC- Duct Penetration- Proposed Remedial Detail RFI#99- Botas N/C 49. Submittal#47 (Previously Submited)-Clarafication -BHA 1 50. Request to SepaRate CADD Files(NOT IN CONTRACT)-BHA 1 51. RFI# 126 Electrical Conduits at Entrance/Beam -Botas N/C 52. RFI# 126 Electrical Conduits at Entrance/Beam (For Information) 53. RFI# 128- Restauratn 1st and 2nd Floor Grilles-Project Caine 54. Fire Alarm Permit Application Rejection Comment -Project Caine 55. Salt Water Distribution Strainer- Project Caine 5SA. Proposed Salt Water Distribution System Submittal No. 94- Project Caine 1.5 56. RFI# 130 UPS&Cone Drilling- Botas 57. Fire Suppression sytem- Plans& Electrical Requirements- Project Caine 58. Submittal# 113 Toilet Accessories, Submittal No 114-Hand Dryer& Submittal No. 115 Fire Extinguishers- 2 BHA 59. RFI# 133 Navigational Lights- Project Caine 0.5 60. Submittal# 116-6" High Vinyl Based - BHA N/C 61. Handrail at Fishtables(email from CGA dated 3/14/13) - BHA N/C 62. RFI# 115 Project Caine$900.00 will be paid by Contractor- BHA N/C 0.5 63.Vinyl Base Submittal 3/19/13 -BHA N/C 64. RFI # 141 Electric Hand Dryers- No Power shown on the Electrical Plans- Project Caine N/C 65. RFI# 140 Electrical Oulets in Food Service Area (Conflict) - ProjectCaine 66. Submittal# 118 Water Heater- Project Caine N/C 67. 2 Hour Stair Entry Revision- BHA...Kurt Cira 1 68. RFI# 142 -Gas heater Vent Relocation - Botas 69. RFI# 122 Fire Dampers (6" and 18"Size)- Project Caine 70. RFI- Bathroom Fixtures- Project Caine 71.Submittal 74(R4) Fire Protection Shop Drawings& Hydraulic Calculations- Project Caine 1.5 72.Submittal No. 121 Building signages- BHA 1.5 73.Approach Guard Rail- Botas 0.5 74. Submittal# 124- Black-out Film for Mechanical Room Door- BHA 1 75. Submittal# 125- Rev 1 - BHA 7• • •• • •- : • - ulations -De '• . • •mrtta •0. -. . . . - - - - 47- Fire uppression s em- - • - . outlinework.xls Botas= 12 hrs and BHA= 11 hrs(Total = 23) 8 / B PROJECT CAINE WORK FROM NOVEMBER 26, 2012 TO THE PRESENT s /e Manuel Sanchez - BHA From: Tom Lund (tlund @projectcaine.com] Sent: Monday, May 06, 2013 1:55 PM To: Manuel Sanchez- BHA Cc: 'Robert Caine'; Jorge Maspons - BHA Subject: RE: Newport Fishing Pier Attachments: Sunny Ilses Fishing Pier CA Hourly Billing.xls Manuel,you are missing a lot of our tasks.Anyway here's out CA Speardshet we send you each month.It looks like we are owed$9,480 on work since nov-12'.We will hold off on sending out final as-buihs till this is resolved. torn From: Manuel Sanchez - BHA [mailto:msanchez©bhaenq.usl Sent: Thursday, May 02, 2013 7:07 AM To: Tom Lund Cc: Robert Caine; Jorge Maspons - BHA Subject: Newport Fishing Pier Good Morning Tom: Attached please find the outline of all the Items received from November 26, 2012 thru the Present. I need your hours in some items because next Tuesday we are having a meeting with the City of Sunny Isles to discuss payment (see attached emails). Thanks Manuel R.Sanchez,P.E. I Director of Structural Design I Reiswenger,Hoch&Associates,Inc. 1 510 Shotgun Road,Suite 400 I Sunrise,n 33326 T:954.334.9000 1 0:954.334.2759;F:954.334.78001 C:786.514.8761 I msanchez@bhaeng.us This message has been scanned for malware by Websense. www.websense.com Click here to report this email as spam. t S / D Project Caine Project: Sunny Ilses Fishing Pier Architect: BHA Date: 11/30/2012 Service Preformed Date Hours Cost Total Cost Staff Louver review 11/27/2012 2.0 S120.00 $240.00 TBL $120.00 $0.00 TBL Invoice Nov 2012 $240 Rates: RBC $120 PW $120 TBL $120 VW $120 fodf. s , 8 Project,Caine Project: Sunny Uses Fishing Pier Architect: BHA Date: 12/31/2012 Service Preformed Date Hours Cost Total Cost Staff Hood SF Relocation 12/3/2012 3.0 $120.00 $360.00 TBL Grease Trap Submittal 12/4/2012 2.0 $120.00 $240.00 TBL Salt Wtr Dist. Submittal 12/4/2012 2.0 $120.00 $240.00 TBL Fire Prot. Shop Drwgs 12/4/2012 2.0 $120.00 $240.00 TBL Paint Submittal 12/5/2012 2.0 $120.00 $240.00 TBL UPS Submittal 12/10/2012 2.0 $120.00 $240.00 TG Invoice Dec 2012 $1,560 Rates: RBC $120 PW $120 TBL $120 VW $120 {id L.. SIB Project,Caine Project: Sunny Uses Fishing Pier Architect: BHA Date: 1/31/2013 Service Preformed Date Hours Cost Total Cost Staff Switchgear Submittal 1/3/2013 3.0 $120.00 $360.00 TG Lighting Submittal 1/4/2013 3.0 $120.00 S360.00 TG Silencer Submittal 1/7/2013 1.0 $120.00 $120.00 TBL Louver Submittal 1/7/2013 2.0 $120.00 $240.00 TBL Ductwork Submittal 1/7/2013 2.0 $120.00 $240.00 TBL Grease trap calculation/letter 1/21/2113 4.0 $120.00 $480.00 TBL Meters/Disconnect Submittal 1/25/2113 3.0 S120.00 $360.00 TBL Grease hood meeting/work 1/29/2113 4.0 $120.00 $480.00 TBL Salt Water Dist. Submittal 1/30/2113 4.0 $120.00 $480.00 TBL Fire Alarm Submittal 1/31/2113 2.0 $120.00 $240.00 TBL Invoice Jan 2013 $3,360 Rates: RBC $120 PW $120 TBL $120 VW $120 SIB Project Caine Project: Sunny Ilses Fishing Pier Architect: BHA Date: 2/28/2013 Service Preformed Date Hours Cost Total Cost Staff Plumb/HVAC Penetrations 2/8/2013 2.0 $120.00 S240.00 TBL HVAC Diffuser Submittals 2/26/2013 2.0 $120.00 $240.00 TBL Electrical Penetrations 2/26/2013 2.0 5120.00 $240.00 TG Invoice Feb 2013 $720 Rates: RBC $120 PW $120 TBL $120 VW $120 SIB Project Caine Project: Sunny Ilses Fishing Pier Architect: BHA Date: 3/31/2013 Service Preformed Date Hours Cost Total Cost Staff RFI 130 3/1/2013 2.0 3120.00 $240.00 TBL RFI 132 3/1/2013 2.0 $120.00 $240.00 TBL Elect RFI 133 3/8/2013 2.0 $120.00 S240.00 TBL Nav Light Corrospondance 3/19/2013 3.0 S120.00 $360.00 TBL Nay Light Corrospondance 3/21/2013 2.0 $120.00 3240.00 TBL Water Heater Submittal 3/22/2013 1.0 5120.00 $120.00 TBL Elect RFI 141 3/26/2013 1.0 $120.00 $120.00 TBL Elect RFI 141 3/26/2013 1.0 S120.00 $120.00 TG Invoice Mar 2013 $1,680 Rates: RBC $120 PW $120 TBL $120 VW $120 fj,/ / BIB • Project Caine Project: Sunny Ilses Fishing Pier Architect: BHA Date: 4/30/2013 Service Preformed Date Hours Cost Total Cost Staff RFI #141 4/1/2013 2.0 $120.00 $240.00 TBL Breaker Cutsheet 4/3/2013 2.0 $120.00 $240.00 TG RFI #143 4/3/2013 2.0 $120.00 $240.00 TBL Gas Water Heater Exhaust 4/4/2013 2.0 $120.00 $240.00 TBL Submittal #122 Fire Dampers 4/5/2013 2.0 $120.00 $240.00 TBL RFI#145 4/15/2013 2.0 $120.00 $240.00 TBL Fire Protection Shop Drwgs 4/16/2013 2.0 $120.00 $240.00 TBL Silencer Installation Issue 4/25/2013 2.0 $120.00 S240.00 TBL Invoice April 2013 $1,920 Rates: RBC $120 PW $120 TBL $120 VW $120 %id L. Sib s,5="=`Fr City of Sunny Isles Beach u�: : 0-7= 18070 Collins Avenue F — Sunny Isles Beach, Florida 33160 yI F QP\‘) 4. (305)947-0606 City Hall cit.-of sun i" (305)949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Bill Evans, Assistant City Manager FROM: Christopher J. Russo, City Manager DATE: 5/16/2013 RE: A Resolution Approving theThird Amendment to Agreement with BHA, Inc. for Professional Services for the Newport Pier Project RECOMMENDATION: We recommend the City Commission approve the attached Resolution. REASONS: Previously the City Commission voted and approved a modification to the construction contract to include both City and private partner requested modifications made after construction began. The increase in time in the construction contract directly impacted the professional services being performed to manage this contract by also extending their duration. Previously the City contracted directly with Beiswenger, Hoch & Associates, Inc. (BHA) to act as the engineer of record for the duration of the project. The requested change order from BHA is to extend their services through the end of the project, which was extended by the construction change order by 142 calendar days. ATTACHMENTS: • Contract Chart • Resolution • Third Amendment Agenda Item No.1011 Date 5/16/2013 126