My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Link Construction Group uses customized software for accounting, project management and scheduling in the construc- <br />tion industry. We train our staff in every program and ensure continued training to ensure proficiencyfor all future updates. <br />Our information management processes have allowed us to complete our jobs early or on time and within or below budget <br />while providing the owner with accurate and current information when they want it. <br />Every jobsite is linked to our main office and has all programs loaded on the jobsite computers. Our newest technology <br />benefit is to set up cameras at our jobsites and link them to our owners website as well as our own so our clients and their <br />constituents can follow the progress. Our main office houses multiple servers with continual backup and offsite housing of <br />backup disks. We can work with any owner to set up electronic jobsite document communication. <br />An industry leader in information technology, Link has developed integrated electron- <br />ic project control systems to support our teams in the day -to -day management of their projects. <br />Introduced in 2001, for use in budgeting, estimating, tracking and controlling project costs, Link's propri- <br />etary cost management approach includes the latest that technology has to offer. High - performance en- <br />hancements available include multi -level security for each project, dial -in access from outside the of- <br />fice or jobsite and maximum flexibility for fulfilling client requirements for detailed cost breakdowns. <br />Below are the highlights of each program used for optimal information tracking for each project as well as our day -to -day <br />operations. <br />11 <br />(ACCOUNTING)- Timberline Systems <br />Job Cost Report <br />Cost Shared Saving Log <br />AIA Requisition Tracking <br />Purchasing Schedule <br />Project Transaction Report <br />(SCHEDULING)- Primavera /Sure Track/Microsoft Project <br />Schedule Update Report Form <br />Accurate Critical Path Method (CPM) scheduling software <br />Complete tracking of all activities <br />Complete CPM updates every week <br />2 -week look ahead schedule for all sub trades and job supervisors <br />Resource loading for accurate forecasting and manpower <br />requirements <br />(PROJECT MANAGEMENT)- Expedition/Primavera <br />Daily Jobsite Reports <br />General Correspondence Log <br />Architect/Owner Correspondence Log <br />Change Order Log <br />R.F.I. Log <br />Shop Drawing Tracking Log <br />11 <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements i Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.