My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Link Construction Group's proudest achievement is our reputation for building quality projects on -time and on- budget. On- <br />time delivery, reduced project costs and top - quality results are our goal for every owner. <br />Cost control begins very early in the planning process. When all aspects of a project are properly considered in the esti- <br />mating phase, the project team can better concentrate on production, quality and cost savings. Our cost control software <br />includes a cost loading feature which enables us to input scheduled values for each trade, general conditions, etc... into <br />designated fields and project costs versus time with great accuracy creating accurate cash flow projections and serving as <br />additional support for monthly applications for payment. <br />This is beneficial for you, the client by providing accurate cash flow projections, while giving the subcontractors fair incen- <br />tives to maintain or accelerate progress. When a project is managed effectively, the project team has a greater ability to <br />spot and capitalize on potential savings. <br />On Time Performance, Accurate Pricing and Stringent Quality Control Are Our Keys to Success. <br />Accurate quantity material take -off during the phases of <br />pre - construction and budgeting. <br />Subcontractor invitation and information tracking system. <br />RF No. 13 -08 -01 Gateway Park Pedestrian Access Improvements Ste 1 u� <br />Q Y P I P gym. <br />xPar, <br />+I_l <br />VI /VVII�VI D <br />aoFrwawe <br />Accurate quantity material take -off during the phases of <br />pre - construction and budgeting. <br />Subcontractor invitation and information tracking system. <br />RF No. 13 -08 -01 Gateway Park Pedestrian Access Improvements Ste 1 u� <br />Q Y P I P gym. <br />
The URL can be used to link to this page
Your browser does not support the video tag.