Laserfiche WebLink
Aquality, acceptable base -line level must be established before any effective quality control can be achieved. Our base- <br />line level has been defined and developed from numerous successfully completed owner accepted projects. Our staff is <br />well versed on the Link Construction Group standards and clearly communicates our expectations to the subcontractors <br />prior to commencing the work. <br />Since the inception of Link Construction Group, Inc. our corporate philosophy has demonstrated extremely stringent quality <br />control levels and we have invariably attained these levels of quality. Our quality control plan begins during preconstruction <br />by only soliciting subcontractor and material bids from pre - qualified vendors. Our standards are well known to our subcon- <br />tractors, as many have been providing services for us since we opened our doors. <br />During construction, we ensure quality through our daily quality inspections along with weekly jobsite meetings. Our <br />weekly meetings include subcontractors, owners and design professionals. Since our meetings require thorough job - <br />site inspection by all parties, any question of quality is immediately addressed. This immediate reaction prevents a bud- <br />ding problem from taking root. If a problem is discovered it is immediately corrected. As an added layer, our Quality <br />Assurance Manager also visits the jobsite regularly to inspect and review workmanship. <br />C <br />U/� = ©' <br />• �.A lj h <br />rti, <br />- <br />'Y <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />