My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Once again it is our pleasure to submit this Request for Qualification and we look <br />forward to being selected as well as receiving your notice to proceed. We are <br />ready and eager to start and be a part of this beautiful structure that many will <br />drive under and walk across. <br />Thank you, <br />ndez <br />President <br />Link Construction Group Inc. <br />General Contractors • Construction Managers <br />7003 N. Waterway Drive Ste. 218 Miami, FL 33155 • Tel.305.665.9826 Fax.305.665.9851 <br />Linkconstructiongroup.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.