My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} I - f L 1' �:! �iii s % Wi - <br />CREDENTIALS <br />RONALD DURAN, P. E: <br />PROJECT MANAGER AT AxI0MA3 ., Years Experience <br />39+ Years <br />INhamiWadel000ntvlFlonda. <br />SPECIAL CONSULTING SERVICES <br />Years with Axioma3 <br />1+ Year <br />Education <br />Universidad Mayor de <br />San Andres (Bolivia) <br />Structural Engineering <br />and Civil /Sanitary Engi- <br />neering <br />0 erium Inspection Engineers— Miami, FL. Building Inspections 2003 To Date <br />uct. Plan Examiner for Dade Cty. Bldg. Dept. Serv. through PAWA Complex Intl. 1994 <br />•Plant Inspector of Wood Truss Fabrication in So. Fla. for the Truss Plate Institute 1994 -1995 <br />-Specialty Engineering Services with Kan Mehta & Assoc. and as own business 2006 To Date <br />Achievements <br />Registered Professional <br />Engineer <br />General Contractor <br />WORK EXPERIENCE: LIST OF REPRESENTATIVE PROJECTS <br />1. BRIDGE ENGINEERING DESIGN AND INSPECTION (VECP = "VALUE ENGINEERING CHANGE PROPOSAL ") <br />-Pedestrian steel bridge design for Miami -Dade Transit Agency (2002 -2003) <br />US -1 and Douglas Road, concrete support towers with prefab steel bridge. Miami, Florida. <br />-Construction Platform for widening of con c. bridge pedestrian walkway (2011-2012) <br />For expansion of architectural pedestrian walkway ea. side of Columbus Av.bridge, Hillsborough County <br />-VECP design for Southern Blvd. bridges over Stub Canal / SFRC and 1 -95 (2003 — 2004) <br />Re- design of bridges using prestressed concrete girders instead of steel. West Palm Beach, Florida. <br />-Bridge on 97th Ave. over SR836 Foundation Re- design (2004) <br />VECP service to The De Moya Contractors. The original pile foundation design was redesigned as a continuous reinforced concrete <br />elastic mat foundation under every pier. <br />-Bridge on 97th Ave. over SR836 Value Engineering (2003) <br />Miami -Dade County Public Works Dept. Works on proposal in the design of the bridge for potential savings of up to 4 million dollars. <br />-Metro Rail Extension (2002 -2003) <br />Miami -Dade County Transit. Analysis and preparation of remedial work procedures to correct a camber - originated problem. Steel <br />box girders. <br />-VECP design for Southern Blvd. /Australian Ave. (2002 — 2003)1 <br />age'C1' (5 spans) and ramp '0' (3 spans): Prestressed concrete beams, FDOT District IV project. Palm Beach County, Florida. <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.