Laserfiche WebLink
KEY PERSONNEL RESUME <br />RONALD DURAN, P.E. <br />PROJECT MANAGER AT AXIOMA3 <br />•VECP design for Okeechobee Bridge over 1 -95 (2001 — 2003) <br />3 Spans with prestressed concrete beams, FOOT District IV project. Palm Beach County, Florida. <br />-Bascule steel bridge structural analysis and repair design (1999 — 2001) <br />For the Jewfish Creek at the Intracoastal Waterway, FOOT District VI project. Monroe County, Florida <br />-Bascule Bridge Inspection (1999) <br />Rehab Design on Jewfish Creek, structural steel, FOOT District VI project. Monroe County, Florida. <br />-Bascule steel bridge (1999) <br />On US -1 over C -111 canal, joint repair design, FOOT District VI project. Miami -Dade County Florida. <br />-Concrete bridge designs (1998— 1999) <br />Using prestressed concrete beams for Regency Bypass, curved, 3 spans. Jacksonville, Florida. <br />-Design of Upper Vehicular Drive and Foundation(1997— 1998) <br />With inclusion of future People Mover columns at Miami International Airport, 50 -span structure for elevated roadway, steel design, <br />auger cast piles. Miami, Florida. <br />-Post-tensioned bridge beams failure after an accident (1993) <br />Remedial work analysis and inspection, Miami International Airport, Miami, Florida. <br />•A variety of civil - structural design for several Bridge Contra ctors(1997 — 2010) <br />Specialty engineering services such as forming systems, crane supports, concrete and steel sheet piling, box culverts, trestle struc- <br />0s, special anchorage systems, seawalls, and remedial works of many types. <br />2A. BUILDING ENGINEERING DESIGN AND INSPECTION (P.T. = POST- TENSIONED CONCRETE) <br />•Mikado— Hotel DeL'Opera (2010) <br />40 -story residential, retail, hotel & parking. Pile foundation and partial study of shearwalls. Miami, Fla. <br />-Paramount at Edge Water (2004 — 2010) <br />52 -Story residential and commercial with 6 -story parking garage, P.T. slabs, pile foundation. Miami, Fla. <br />•Terrazas at River Park Condominium (2003 —2009) <br />Double tower (27 & 20 stories) residential and 7 -story parking garage, concrete shear walls, P.T. slabs, mat foundation. Miami, Florida. <br />-Everglades on the Bay Condominium (2004 -2007) <br />Double tower 53 -story each, design of concrete shear walls, Miami, Florida. <br />•Aventura Marina Condominium (2004 — 2006) <br />Construction consulting services and inspection. 19 -story. Concrete building. Aventura, Florida. <br />-Villa Lofts Condominium (2004 -2006) <br />Construction consulting services. 12 -Story building addition on existing structure. West Palm Beach, FL <br />-Review of 11 Residential Structural Designs (2003 — 2004) <br />For design audit conducted by Broward County Board of Rules & Appeals . <br />-Complete structural design of Lynx NOB (New Operating Base) (2003 — 2006) <br />A bus maintenance facility and admin. offices in Orlando, Fla.; 8 buildings of different structural systems: prefab steel structures, <br />concrete, composite steel with concrete tilt -up walls and large -tank enclosures. <br />-The Setai Condominium(2001 — 2002, 2004 — 2006) <br />42 -story building in Miami Beach, Florida; concrete shearwall design with double -story transfer girder. <br />-The J.W. Marriot Hotel and Barclay Financial Center Towers (2001 — 2002) <br />21 and 32 stories, concrete Shearwalls, lateral framing design, and pile foundation. Miami, Florida. <br />illagio Luxury Condominium (1994-1997 <br />tal Construction, post- tensioned. 17 stories; full design and partial Inspection. Miami Beach, Fla. <br />-The Yacht Club Condominium (1996 — 1997) <br />At Highland Beach, Florida, 11 -Story, PT slabs, partial design. <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1� <br />