My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEY PERSONNEL RESUME <br />RONALD DURAN, P.E. <br />PROJECT MANAGER AT AXIOMA3 <br />-Peanut Island Improvements (2002 -2003) <br />Heavy timber floating observation deck with pile guides and ramps with fixed and movable system. <br />-Seawall at Jose Marti Park (2002 -2003) <br />FOOT District VI project for City of Miami Riverwalk development. Prestressed concrete and steel sheet piles, 332 ft, Miami, Florida. <br />-Crandon Park Marina Phase 11, civil and structural design (2000 — 2002) <br />118 boat slips; concrete floating docks, prestressed concrete guide piles. Miami, Florida. <br />•Haulover Marina Improvement Ph. I, civil and structural design (2002 — 2003) <br />(First Design) 150 slips, concrete fixed piers, wave baffle and breakwater systems; prestressed concrete piles & steel sheet piles. <br />Miami, Florida. <br />-Drainage VECP (2002) <br />Design for replacing a concrete box culvert with a jack- and -bored steel pipe under the 1 -75 Expressway. Client: Archer Western <br />Contractors, FOOT District VII project. Tampa, Florida. <br />-Crane Steel Trestle Structure for New Gordon River Bridge Construction (1998) <br />Design of a continuous steel trestle to allow a roller crane drive over an existing old bridge for construction of a new parallel bridge. <br />-Deering Estate Park Historic Preservation Area (1998— 1999) <br />New floating boat launching dock and existing dock restoration and improvement. Miami, Florida. <br />-Rinker Crane Unloading System (1990) <br />S post- tensioned concrete structure for Gantry crane for unloading of cement. Port Everglades, FL <br />ncourse F to G Wrap - Around (1985 — 1986) <br />Drainage & Industrial Waste Systems. Miami Int'I Airport, Miami, Florida. <br />-Other civil designs for Contractors and Government agencies (1990 to Date) <br />Such as drainage and dewatering, dock restorations, "Gabions" retaining walls, parking lot design, water - mains, water and sewer <br />utilities, and more. <br />REPRESENTATIVE PROJECTS ON STRUCTURAL AND CIVIL ENGINEERING DESIGN IN OTHER COUNTRIES <br />-Re-Installable Steel Structures: Direction and supervision of fabrication and installation of Steel Structures. Guadalajara, Mexico <br />-Railroad concrete bridge: One -span, La Paz, Bolivia. <br />-San Borja Airport Terminal and all facilities: Beni, Bolivia. <br />-Bus Station, Concrete structure: Cochabamba City, Bolivia. <br />-Public Works Dept: Concrete building, 10 floors. Santa Cruz, Bolivia. <br />-Lighting structure for the Municipal Stadium: Steel truss towers; design and inspection. Santa Cruz, Bolivia <br />-Warehouse roof truss standardization: Design and Inspection. Santa Cruz, Bolivia. <br />-Chief of Construction Section: Water & Sewer Dept., Santa Cruz, Bolivia. <br />-In charge of construction engineering & inspection: For Sewer System in Cities of Montero, Vallegrande, and Camiri, Bolivia. <br />-Assistant inspection engineer: Public Works Dept., Santa Cruz, Bolivia. <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />il( <br />
The URL can be used to link to this page
Your browser does not support the video tag.