Laserfiche WebLink
E <br />Ignacio Serralta, P.E. <br />Principal <br />Mr Ignacio Serralta has more than <br />twenty years of experience in civil <br />engineering planning, design, and <br />management for a wide range of <br />public works, site development, and <br />infrastructure projects He has <br />been responsible for the design of <br />roadway improvements, storm <br />drainage systems, water and <br />sanitary sewers transmission <br />pipelines, as well as reservoirs and <br />pump stations He is familiar with <br />the many facets of public and <br />private project management and <br />has served as Project <br />Manager /Engineer on many <br />projects <br />PROFESSIONAL EXPERIENCE <br />• Master Consultant from November 2001 through December 2005 for the <br />FEMA/DORM Restoration Project The project was a jointly funded effort <br />supported by the Federal Government, the State of Florida, and NLami -Dade <br />County and was intended to mitigate problems that arose as a result of <br />Hurricane Irene (October 1999) and the 'No Name Storm' (October 2000) As <br />Master Consultant we oversaw the construction efforts of nine (9) contractors <br />performing work with an estimated construction value of S35,000,00000. <br />Addibonally, we were responsible for the coordination of approximately twelve <br />(12) engineering design consultants, eight (8) geotechnical firms and nine (9) <br />land surveying firms involved in the design of approximately four hundred <br />ninety (490) mitigation projects These projects ranged from drainage <br />improvements to total roadway reconstruction, canal dredging, culvert <br />cleaning, and canal bank restoration Finally we were responsible for all <br />document control related to these projects, approval of payment for design, <br />survey, geotechnical reports, and construction in accordance with FEMA <br />required guidelines_ <br />• Prindpal In- Charge for the engineering design work for Miami -Dade <br />County Public Works Department for the widening of Miller Drive between SW <br />152"- Avenue and SW 158° Avenue (3,250 LF)_ <br />• Project Civil Engineer for the City of Hialeah for the reconstruction of <br />several existing roadways totaling over 26 miles of roadways. <br />• Project Engineer for the design, permitting and construction phase <br />services for several County Parks has part of a miscellaneous engineering <br />contract including Chapman Field Park, Three Lakes Part., Crandon Manna, <br />Crandon Golf Course, Miller's Pond Park, Kendall Indian Hammocks Park, <br />Tropical Park Equestrian Center, Spanish Lakes Park, Southern Estates Park, <br />Eureka Park, Eureka Villas Parks, Deerwood Park, and Reach Park . <br />EDUCATION <br />Principal In- Charge for the engineering design of a new City of Hialeah <br />regional sewer pump station. Design work included preparing hydraulic <br />Bachelor of Science in <br />calculations and cons•,rucoon documents for 8.43 MGD regionailbooster sewer <br />Civil Engineering, <br />pump station consisting of a two -story wel/dry well building with four 470-HP <br />California State University, <br />pumps, electncal control systems, telemetry, odor control unit and backup <br />Los Angeles, California <br />generator. <br />LICENSES <br />Project Manager for the engineering design work for several large land <br />development projects totaling over 900 acres including Vocaya at Kendall, <br />Registered Civil Engineer, <br />Hialeah Palms, Century Prestige, Meduerranea, Bluewaters, and Vcenaa. <br />State of California, <br />These projects included contracting and coordinating all topographical surveys <br />Lic. No C47828 <br />and geotechnical investigations, all environmental studies including phase I <br />environmental audit, wetland mitigation reports, and secondary and cumulative <br />Registered Engineer, <br />impact reports, and preparation of ERP permit, civil design of on -site paving, <br />State of Flonda, <br />grading, and drainage, and water and sewer systems, design of regional <br />L¢. No. PE45609 <br />sewer pump station and force, design of off -site water and sewer systems <br />CemSed Uniform Building Code <br />Principal In- Charge for the master planning and engineering design of <br />Inspector (UBCI) <br />water and sewer infrastructure required to serve the newly annexed area to <br />Me City of Hialeah <br />Board Member, Florida <br />Intemanonal University Honors <br />Project Manager for the Miami International Airport Employee Parking <br />College <br />Area Storm Water Study and Design of Interim Drainage Improvements <br />�Ms M <br />11 <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />l..ZILJ U �1 <br />m�dm <br />