Laserfiche WebLink
F J <br />11 <br />Oliverio Sanchez, P.E. <br />Vice President/ Sr Project Manager <br />Mr. Oliveno Sanchez has over thirty <br />years of expenence in project <br />management and engineering design <br />for both public and private sectors in <br />Central and South Florida, Mexico, <br />the Caribbean and Spain, in the fields <br />of land development and site <br />planning, airport work on both <br />landside and arside, Port and marina <br />developments, municipal engineering, <br />storm water management and <br />drainage engineering, roadway <br />engineering, construction <br />management, field supervision and <br />quality control His experience has <br />provided him with helpful knowledge <br />in the field of governmental agencies <br />coordination, plan approvals and <br />processing <br />EDUCATION <br />B S., Civil Engineering, 1973 <br />University of Havana, Cuba <br />Postgraduate course in <br />Structural Analysis, 1979 <br />University of Havana, Cuba <br />PROFESSIONAL EXPERIENCE <br />Roadway Design <br />• NW 138th Street between 1 -75 and N W 107th Avenue. The total <br />length of project was approximately 7,200 linear feet and consisted <br />of a 130 wide, 6 -lane roadway with center median and new 70'vnde <br />canal. <br />• W. 36th Avenue (NN' 97th Ave) between N W. 138th Street and <br />N W. 154th Street The total length of project was approximately <br />5,400 linear feet and consisted of a 100' wide, 4 -lane roadway with <br />center median. <br />• Miller Drive between SW 152nd Avenue and SW 158th Avenue <br />(3,250 LF) The project consisted of providing engineering design, <br />preparation of construction documents, pernut'vng assistance, and <br />construction phase support services <br />• NW 97* Avenue Bridge - new roadway and overpass over SR 836 <br />• Alex Muxo Jr Boulevard ,Homestead - new roadway design <br />• Park of Commerce Boulevard, Homestead - new roadway design. <br />Water and Sewer Installations <br />• Cry of Hialeah, Annexation Area - Water and Sewer Master Plan <br />incjudalg design of 36' force man and water main extensions <br />• City of Hialeah, Annexation Area - design of 36' Transmission <br />Water Main <br />• City of Hialeah, Annexation Area - design of 36' Transmission <br />Force Main <br />• Coconut Grove Mattered Station - installation of 60' ECP water <br />transmission line to replace 2 -42' water mains, and new 12' and <br />16' DIP water mains <br />• Park of Commerce Boulevard and Homestead Motorspon <br />Complex, Homestead - expansion of the City's water distnbuaon <br />and sewage collection systems to serve both developments, <br />mcluding a one million gallon equalizing water elevated tank and <br />three pump stations <br />Land Development <br />• Century Prestige - ±82 acres of development, including 330 single <br />family homes with a five acre lake and an adjacent 14 -acre tract of <br />land <br />• Bluewaters - 80-acre mix -use Single Familyrrownhouse <br />Course in Airport development included the design of on -site paving, grading and <br />Pavement Rehabilitation, 1993 drainage, the design of on -site roadways including adjacent portions <br />University of Texas, Austin, Texas of SW 112" Avenue and SW 2401 Street <br />• LICENSES Bellagio Isle, West Dade - master planning of 640 acres mula -use <br />development. <br />Registered Engineer, City of Homestead - master planning and infrastructure of Part, of <br />Sate of Florida, Commerce; water distribution and sewage collection system <br />Lic No PE44771 expansions on southeast section of the City. <br />• Vicenza at Hialeah Gardens - 72 acres of development, including <br />271 single family homes, 401 town homes, 328 apartments, a <br />Certified Uniform Building Code commercial tract for a strip mall, a 10-acre charter school and two <br />Inspector (UBCI) parks <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />mom <br />