|
F J
<br />11
<br />Oliverio Sanchez, P.E.
<br />Vice President/ Sr Project Manager
<br />Mr. Oliveno Sanchez has over thirty
<br />years of expenence in project
<br />management and engineering design
<br />for both public and private sectors in
<br />Central and South Florida, Mexico,
<br />the Caribbean and Spain, in the fields
<br />of land development and site
<br />planning, airport work on both
<br />landside and arside, Port and marina
<br />developments, municipal engineering,
<br />storm water management and
<br />drainage engineering, roadway
<br />engineering, construction
<br />management, field supervision and
<br />quality control His experience has
<br />provided him with helpful knowledge
<br />in the field of governmental agencies
<br />coordination, plan approvals and
<br />processing
<br />EDUCATION
<br />B S., Civil Engineering, 1973
<br />University of Havana, Cuba
<br />Postgraduate course in
<br />Structural Analysis, 1979
<br />University of Havana, Cuba
<br />PROFESSIONAL EXPERIENCE
<br />Roadway Design
<br />• NW 138th Street between 1 -75 and N W 107th Avenue. The total
<br />length of project was approximately 7,200 linear feet and consisted
<br />of a 130 wide, 6 -lane roadway with center median and new 70'vnde
<br />canal.
<br />• W. 36th Avenue (NN' 97th Ave) between N W. 138th Street and
<br />N W. 154th Street The total length of project was approximately
<br />5,400 linear feet and consisted of a 100' wide, 4 -lane roadway with
<br />center median.
<br />• Miller Drive between SW 152nd Avenue and SW 158th Avenue
<br />(3,250 LF) The project consisted of providing engineering design,
<br />preparation of construction documents, pernut'vng assistance, and
<br />construction phase support services
<br />• NW 97* Avenue Bridge - new roadway and overpass over SR 836
<br />• Alex Muxo Jr Boulevard ,Homestead - new roadway design
<br />• Park of Commerce Boulevard, Homestead - new roadway design.
<br />Water and Sewer Installations
<br />• Cry of Hialeah, Annexation Area - Water and Sewer Master Plan
<br />incjudalg design of 36' force man and water main extensions
<br />• City of Hialeah, Annexation Area - design of 36' Transmission
<br />Water Main
<br />• City of Hialeah, Annexation Area - design of 36' Transmission
<br />Force Main
<br />• Coconut Grove Mattered Station - installation of 60' ECP water
<br />transmission line to replace 2 -42' water mains, and new 12' and
<br />16' DIP water mains
<br />• Park of Commerce Boulevard and Homestead Motorspon
<br />Complex, Homestead - expansion of the City's water distnbuaon
<br />and sewage collection systems to serve both developments,
<br />mcluding a one million gallon equalizing water elevated tank and
<br />three pump stations
<br />Land Development
<br />• Century Prestige - ±82 acres of development, including 330 single
<br />family homes with a five acre lake and an adjacent 14 -acre tract of
<br />land
<br />• Bluewaters - 80-acre mix -use Single Familyrrownhouse
<br />Course in Airport development included the design of on -site paving, grading and
<br />Pavement Rehabilitation, 1993 drainage, the design of on -site roadways including adjacent portions
<br />University of Texas, Austin, Texas of SW 112" Avenue and SW 2401 Street
<br />• LICENSES Bellagio Isle, West Dade - master planning of 640 acres mula -use
<br />development.
<br />Registered Engineer, City of Homestead - master planning and infrastructure of Part, of
<br />Sate of Florida, Commerce; water distribution and sewage collection system
<br />Lic No PE44771 expansions on southeast section of the City.
<br />• Vicenza at Hialeah Gardens - 72 acres of development, including
<br />271 single family homes, 401 town homes, 328 apartments, a
<br />Certified Uniform Building Code commercial tract for a strip mall, a 10-acre charter school and two
<br />Inspector (UBCI) parks
<br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1
<br />mom
<br />
|