Laserfiche WebLink
E <br />0 <br />Gilbert A. Caamano <br />Project Manager <br />Mr. Gilbert A. Caamano has more <br />than thirty -five years of experience <br />in civil engineering planning, <br />design, construction and <br />management for a wide range of <br />public works, site development, and <br />infrastructure projects He has <br />been responsible for the design and <br />construction of roadway <br />improvements, storm drainage <br />systems, water and sanitary sewers <br />transmission pipelines Mr. <br />Caamano is familiar with the many <br />facets of public and private project <br />management and has served as <br />Project Manager /Engineer on many <br />projects <br />EDUCATION <br />Associates in Science <br />Engineering Drafting & Design <br />Associates in Arts <br />Pre - Bachelor Arts <br />Miami -Dade College, Miami, Florida <br />Bachelor of Science in <br />Construction Management <br />Florida International University <br />Miami, Florida <br />LICENSES <br />Certfed Underground Utilities & <br />Excavation Contractor, State of <br />Florida CDC #1224892 <br />PROFESSIONAL EXPERIENCE <br />• Project Manager for the engineenng design worts, for Miami -Dade County <br />Public Works Department and FOOT for various roadway projects totaling <br />approximately 10 miles of roadways <br />• Design Engineer for the design work for Miami -Dade County Traffic Division & <br />FOOT District Six Computerized Signalization Program Directly responsible for the <br />design of over 120 signalized mtersections in Miami -Dade County <br />• Project Manager for the engineering design, or criteria design, perming and <br />construction phase sernces for 14 different educational facilities for Miami -Dade <br />County Public Schools, Broward Public Schools, University of Miami and Broward <br />Community College <br />• Project Manager for the engineering design work for several large commercial <br />or industrial land development projects including Flagler Station, Miami <br />International Business Park and K -Mart Center in Miami Gardens These projects <br />included contracting and coordinating all topographical surveys and geotechnical <br />investigations; all environmental studies including phase 1 environmental audit <br />wetland mitigation reports, and preparation of ERP permit, civil design of on -site <br />paving, grading, and drainage, and water and sewer systems, design of of; -sne <br />water and sewer systems <br />• Project Manager for the engineering design work for several large residential <br />land development projects totaling over 3 square miles including Westwind Lakes, <br />Oak Park, Silver Palms, Tuscany, Landmark @ Coral, Grand Bay @ octal These <br />projects included contracting and coordinating all topographical surveys and <br />geotechnical investigations, all environmental studies including phase I <br />environmental audit, wetland mitigation reports, and preparation of ERP permit, <br />ciwl design of on -site paving, grading, and drainage, and water and sewer <br />systems; design of regional sewer pump station and force mains; design of off -site <br />water and sewer systems <br />• Owner's Representative (Developer) in charge of all land development <br />services for the Developer Responsible for the Coordination of all subs as it <br />pertains to site civil manners, the coordination between Design consultants, Site <br />Contractor, and Government Agencies to take the project from concept to <br />completion. <br />Project Manager for civil construction of numerous private and public <br />projects Construction of site civil, water, sewer, drainage, earthwork, road <br />construction, bridge construction for Miami -Dade County Public Works, Miami - <br />Dade Water & Sewer, FOOT District Six, City of Miami, Miami Gardens, Miami <br />Beach and numerous Private Developers <br />• Project Manager for the design and implementation of a GIS system for the <br />Town of Surfside and Bay Harbor Islands, which included data collection, <br />topographical mapping, and development of relational databases <br />FDOT Maintenance of Traffic; Project Manager for the engineering design work for the 121 Alhambra Plaza <br />Advance Level Building Site. This project included conceptual and final design of off -site roadway <br />FDOT CTOP Final Estimates I & 11, improvements, full utility main extension plans and serrice plans, off -site and on- <br />OC Manager, Asphalt Paving Level site drainage, Right -of -way acquisition plans preparation. Coordination win <br />I & II Owners representatives, and City of Coral Gables, and all Utilities, Coordination <br />OSHA Safety Certification[ with General Contractor prior and during construction for all Ciwl and Landscaping <br />(30 hr. Course) issues <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />