|
E
<br />0
<br />Gilbert A. Caamano
<br />Project Manager
<br />Mr. Gilbert A. Caamano has more
<br />than thirty -five years of experience
<br />in civil engineering planning,
<br />design, construction and
<br />management for a wide range of
<br />public works, site development, and
<br />infrastructure projects He has
<br />been responsible for the design and
<br />construction of roadway
<br />improvements, storm drainage
<br />systems, water and sanitary sewers
<br />transmission pipelines Mr.
<br />Caamano is familiar with the many
<br />facets of public and private project
<br />management and has served as
<br />Project Manager /Engineer on many
<br />projects
<br />EDUCATION
<br />Associates in Science
<br />Engineering Drafting & Design
<br />Associates in Arts
<br />Pre - Bachelor Arts
<br />Miami -Dade College, Miami, Florida
<br />Bachelor of Science in
<br />Construction Management
<br />Florida International University
<br />Miami, Florida
<br />LICENSES
<br />Certfed Underground Utilities &
<br />Excavation Contractor, State of
<br />Florida CDC #1224892
<br />PROFESSIONAL EXPERIENCE
<br />• Project Manager for the engineenng design worts, for Miami -Dade County
<br />Public Works Department and FOOT for various roadway projects totaling
<br />approximately 10 miles of roadways
<br />• Design Engineer for the design work for Miami -Dade County Traffic Division &
<br />FOOT District Six Computerized Signalization Program Directly responsible for the
<br />design of over 120 signalized mtersections in Miami -Dade County
<br />• Project Manager for the engineering design, or criteria design, perming and
<br />construction phase sernces for 14 different educational facilities for Miami -Dade
<br />County Public Schools, Broward Public Schools, University of Miami and Broward
<br />Community College
<br />• Project Manager for the engineering design work for several large commercial
<br />or industrial land development projects including Flagler Station, Miami
<br />International Business Park and K -Mart Center in Miami Gardens These projects
<br />included contracting and coordinating all topographical surveys and geotechnical
<br />investigations; all environmental studies including phase 1 environmental audit
<br />wetland mitigation reports, and preparation of ERP permit, civil design of on -site
<br />paving, grading, and drainage, and water and sewer systems, design of of; -sne
<br />water and sewer systems
<br />• Project Manager for the engineering design work for several large residential
<br />land development projects totaling over 3 square miles including Westwind Lakes,
<br />Oak Park, Silver Palms, Tuscany, Landmark @ Coral, Grand Bay @ octal These
<br />projects included contracting and coordinating all topographical surveys and
<br />geotechnical investigations, all environmental studies including phase I
<br />environmental audit, wetland mitigation reports, and preparation of ERP permit,
<br />ciwl design of on -site paving, grading, and drainage, and water and sewer
<br />systems; design of regional sewer pump station and force mains; design of off -site
<br />water and sewer systems
<br />• Owner's Representative (Developer) in charge of all land development
<br />services for the Developer Responsible for the Coordination of all subs as it
<br />pertains to site civil manners, the coordination between Design consultants, Site
<br />Contractor, and Government Agencies to take the project from concept to
<br />completion.
<br />Project Manager for civil construction of numerous private and public
<br />projects Construction of site civil, water, sewer, drainage, earthwork, road
<br />construction, bridge construction for Miami -Dade County Public Works, Miami -
<br />Dade Water & Sewer, FOOT District Six, City of Miami, Miami Gardens, Miami
<br />Beach and numerous Private Developers
<br />• Project Manager for the design and implementation of a GIS system for the
<br />Town of Surfside and Bay Harbor Islands, which included data collection,
<br />topographical mapping, and development of relational databases
<br />FDOT Maintenance of Traffic; Project Manager for the engineering design work for the 121 Alhambra Plaza
<br />Advance Level Building Site. This project included conceptual and final design of off -site roadway
<br />FDOT CTOP Final Estimates I & 11, improvements, full utility main extension plans and serrice plans, off -site and on-
<br />OC Manager, Asphalt Paving Level site drainage, Right -of -way acquisition plans preparation. Coordination win
<br />I & II Owners representatives, and City of Coral Gables, and all Utilities, Coordination
<br />OSHA Safety Certification[ with General Contractor prior and during construction for all Ciwl and Landscaping
<br />(30 hr. Course) issues
<br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1
<br />
|