My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />C <br />Jean- Claude Fontaneau <br />Project Manager <br />Mr. Jean - Claude Fontaneau has <br />more than 16 -years of experience <br />in civil engineering design. He has <br />been in responsible charge of the <br />planning and design of a variety of <br />municipal and site development <br />protects Mr Fontaneau is primarily <br />responsible for the engineering <br />design and preparation of plans and <br />specifications including the design <br />of roadway improvements, storm <br />drainage systems, water and <br />sanitary sewer pipelines, pump <br />stations, and site development <br />projects <br />EDUCATION <br />6 S , Civil Engineering, 1996 <br />Florida Imernational University, <br />Miami, Flonda <br />LICENSES <br />Engineer Intern, Jan 1999 <br />Sate of Florida, No 1100004976 <br />PROFESSIONAL EXPERIENCE <br />Mr. Jean - Claude Fontaneau's major recent roadways design responsibilities within <br />the City of Hialeah Annexation Area include <br />• Project Engineer responsible for overseeing the design, preparation of <br />construction documents, plan permitting, and prec nsmrcLon phase support <br />services for the construction of N W 97° Avenue Mlest 361 Avenuel between <br />N W 138^ Street and N W. 1541' Street and the construction of N W. 138" Street <br />(Jest 84th Street between N W 9711 Street and N W 107^ Avenue <br />• The Project tasks of these protects included meeting with City of <br />Hialeah staff and local regulatory agencies to establish design guidelines, <br />conduct a utility search and identification of existing utilities and traffic <br />controls, and review roadway design standards, designed and <br />preparation of construction documents for the protect that included the <br />preparation of summary of quantities, roadway plan and profiles, <br />roadway drainage, signage and marking plans, roadway lighting, MOT <br />plan, specifications, and engineers estimate of probable construction <br />cost Other responsibilities included coordinating all topographical <br />surveys and geotechnical investigations, and all environmental studies <br />including welland mitigation reports and preparation of ERP permit <br />Permitting included all applicable regulatory agencies including City of <br />Hialeah, SFWMD, COE, DERM, and MDPWD. <br />• Project Engineer responsible for the preliminary design to the City of Hialeah <br />for the future construction of N W 142- Street between N W 97" Street and N W <br />10411 Avenue <br />Mr. Jean - Claude Fonlaneau's major recent Water and Sewer Pipelines design <br />responsibilities within the City of Hialeah Annexation Area include <br />• Design Engineer for the design of 24 -inch and 6 -inch sewer pipelines <br />along N.W. 9F Avenue from N W 166" Street to City of Hialeah Sewer Pump <br />Station #200 to serve the Annexation Area <br />• Design Engineer for the design of 36 -inch and 16 -inch water pipelines <br />along N W. 97° Avenue from N W 154 Street to N W. 87° Avenue to serve <br />the Annexation Area. <br />• Design Engineer for the City of Hialeah Sewer Pump Station #200 to <br />serve the Annexation Area <br />• Design Engineer for the City of Hialeah ROWTP raw and finish water <br />pipelines along N W 102--Avenue and NW 1701 Street <br />Mr. Jean - Claude Fontaneau's major recent Indusmal facility design responsibilities <br />include <br />• Design Engineer for the design of Liebheer Facility <br />• Design Engineer for the design of Dr Pepper Facility <br />• Design Engineer for the design of Greither Holdings Warehouse <br />Mr. Jean - Claude Fontaneau's major recent Land Development design <br />responsibilities include: <br />• Design Engineer for the design of 114 -Acres Site located east of NW <br />9T Avenue between N W. 142 "1 Street and N.W 154' Street <br />• Design Engineer for the design of <br />• Design Engineer for the design of <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.