My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sunny Isles Beach <br />Pedestrian Bndge - Design Concept <br />Our intention is to provide a design expression that goes hand -in -hand with the Gateway Park <br />project and be memorable, not only to the pedestrian users, but also to the residents and vast <br />number of visitors that travel the area. As an object in the landscape the bridge and its towers <br />will not only provide a much needed function but also provide an Identity to this community. <br />We look forward to the opportunity to complete the Gateway Park vision that will unify the city. <br />Respectfully, <br />F� <br />l<�!(i•r i i t: Kll:li «�iir�iii:4 <br />Eduardo Castineira, Architect <br />President <br />® Page 2 of 2 <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />hl <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.