Laserfiche WebLink
U <br />U <br />1 <br />U <br />1 <br />1 <br />U <br />1 <br />U <br />L <br />U <br />1 <br />STAFFING- RELEVANT EXPERIENCE <br />Prime Consultant for Engineering & Architectural Design, and Construction Administration <br />Description of the This project involved the redevelopment of an existing park for the City of Lauderdale Lakes. The project was <br />scope of the work being performed as collaboration with the Broward County School Board to provide a student drop off for a new <br />Elementary school on an adjacent property. The Project featured a 110' long fully enclosed pedestrian bridge to <br />provide access for the students across the South Florida Water management District G-13 canal. The project <br />also included approximately 1500' of new roadway with additional parking as well as several hundred feet of <br />covered walkway for student protection. The project also included the development of a concession and <br />restroom building for the park as well as renovation of an existing press box structure. New sports field lighting <br />was also provided for all of the play fields. <br />:3 <br />Owner /Agency, City of Lauderdale Lakes <br />Client Name, <br />4300 NW 36th Street <br />address, <br />Lauderdale Lakes, FL 33319 <br />phone number, <br />Ms. Anita Fain Taylor, Project Manager <br />email address <br />Tel. 954 - 535 -2740 <br />General PHI Construction <br />Contractor <br />Total Construction Estimated Cost I $1.5 Million I Total Construction Actual Cost I $1.5 Million <br />Project Status <br />Completed (January 2003) <br />1 21 <br />