My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />1 <br />1 <br />I <br />I <br />1 <br />1 <br />U <br />[1 <br />I <br />1 <br />11 <br />STAFFING - RELEVANT EXPERIENCE <br />Design -Build Team: Lead Designer— Slantec; Bridge Contractor — Anzac <br />Description of the SR 5 (US-1) is a 24ane undivided rural highway that connects Miami -Dade County to the Florida Keys. This <br />scope of the work project entails approximately 10.5 miles of US-1 that is part of the 18 -Mile Stretch of US-1 between Florida City <br />and Key Largo. This project was constructed under a Public Private Partnership utilizing the Design Build <br />Finance (DBF) method of project delivery by our Design -Build Team, and was the first Unsolicited Proposal <br />accepted by USDOT in the State of Florida. The project includes a new 14 -ft wide median with concrete barrier <br />wall designed to eliminate head -on crashes. In addition, there are several 1-mile sections where passing lanes <br />are being provided. Coordination with utilities was very important requiring the relocation of the Florida Keys <br />Aqueduct (FKAA) 36-in watermain. This project included extensive organic material issues and the design of the <br />replacement of the C -111 Bridge and relocation of Utilities. <br />email address Tel. 305 -470 -5260 jose.barrera @dot.state.fl.us <br />General ANZAC — Bridge Contractor <br />Contractor Steve McNamara 305 -669 -1986 <br />Total Construction Estimated Cost I $112 Million I Total Construction Actual Cost I $112 Million <br />Project Status Completed (January 2011) <br />20 <br />Owner /Agency, FDOT District 6 <br />Client Name, 1000 NW 111th Avenue <br />address, Miami, FL 33172 <br />' <br />phone number, Jose Barrera, P.E., Project Manager <br />email address Tel. 305 -470 -5260 jose.barrera @dot.state.fl.us <br />General ANZAC — Bridge Contractor <br />Contractor Steve McNamara 305 -669 -1986 <br />Total Construction Estimated Cost I $112 Million I Total Construction Actual Cost I $112 Million <br />Project Status Completed (January 2011) <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.