Laserfiche WebLink
I <br />[J <br />n <br />I <br />Ul <br />I <br />1 <br />I <br />11 <br />�1 <br />1 <br />1 <br />STAFFING- RELEVANT EXPERIENCE <br />Role Ric -Man International served as the prime contractor <br />Description of the This project consisted of 4,500 feet of new water main installation and 3,500 feet of drainage installation which <br />scope of the work included approximately 900 feet of 3x5 box culvert along Meridian Avenue and 10 gravity wells; furthermore, <br />the scope of work included lighting, signalization, and landscape improvements in a neighborhood of 1,600 <br />residencies and 65 businesses. <br />Owner <br />City of Miami Beach <br />Client <br />Thais Meira R.A, Capital Projects Coordinator <br />Address <br />1700 Convention Center Drive <br />65,000 SY <br />Miami Beach, FL 33140 <br />Phone <br />(305) 673 -7071 <br />Email <br />thaisvieira(@miamibeachfl.cov <br />General Contractor <br />Construction Cost <br />Completion Date <br />Construction Details <br />Scope of Work <br />Design/Build Project <br />FPL Undergrounding <br />Residencies <br />Businesses <br />Streetscape <br />Trees <br />Decorative Lighting <br />Sidewalks / Driveways <br />Curb <br />Decorative Pavers <br />Ric -Man International, Inc. <br />Victor G. Menocal, Project Manager <br />Luis Hernandez, Superintendent <br />$4.5 million <br />2011 <br />Roadway <br />Milling & Resurfacing <br />Roadway Reconstruction <br />Swale Reconstruction <br />Signalization <br />Yes <br />Yes, 1,000 LF <br />1,600 <br />65 <br />220 each <br />20 each <br />5,000 SY <br />9,500 LF <br />4,000 SF <br />Water Main <br />New Water Main <br />New Fire Hydrants <br />Rear Easement Services <br />Stormwater <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />Disposal Wells <br />Box Culvert <br />4,500 LF <br />15 each <br />0 <br />29 each <br />30 each <br />3,500 LF <br />0 <br />10 <br />900 LF (3x5 box culverts) <br />r <br />r <br />27 <br />Sanitary Sewer <br />11,000 SY <br />Sanitary Manholes <br />25,500 SY <br />Sanitary Sewer Main <br />65,000 SY <br />Sewer Lining <br />Yes <br />Sewer Pump Stations <br />4,500 LF <br />15 each <br />0 <br />29 each <br />30 each <br />3,500 LF <br />0 <br />10 <br />900 LF (3x5 box culverts) <br />r <br />r <br />27 <br />