My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />., <br />11 <br />STAFFING - RELEVANT EXPERIENCE <br />Role Ric -Man International served as the prime contractor <br />Description of the Project consisted of refurbishing Washington Avenue from 5th thru 16th Street from store front to storefront. <br />scope of the work Construction had to contend with heavy pedestrian traffic on one of the busiest streets in Miami Beach. Close <br />coordination with business owners, public transportation, shoppers, and residents. The work included <br />extensive planning and scheduling of subcontractors and suppliers to minimize impact on traffic and <br />businesses during weekdays, as well as holidays and public events. <br />28 <br />Owner <br />Client <br />City of Miami Beach <br />Aurelio Carmenates P.E., Capital Projects Coordinator = <br />',p <br />Address <br />1700 Convention Center Drive <br />( iiF <br />ss s_ <br />Miami Beach, FL 33140 <br />�- <br />Phone <br />(954) 999 -8731 <br />) <br />Email <br />acarmenates(@corradino.com <br />General Contractor <br />Ric -Man International, Inc. <br />Rene Castro Sr., Project Director <br />Victor G. Menocal, H &S Construction <br />Manager <br />Construction Cost <br />$18.2 million?, <br />Completion Date <br />2007 <br />Construction Details <br />Scope of Work <br />Water Main <br />Design/Build Project <br />Yes <br />New Water Main <br />6,500 LF <br />FPL Undergrounding <br />No <br />New Fire Hydrants <br />12 each <br />Residencies <br />500 <br />Rear Easement Services <br />0 <br />Businesses <br />200 <br />Streetscape <br />Stormwater <br />Trees <br />165 each <br />Manholes <br />132 each <br />Decorative Lighting <br />158 each <br />Catch Basins <br />40 each <br />Sidewalks I Driveways <br />62,500 SF <br />Drainage Mains <br />4,500 LF <br />Curb <br />5,500 LF <br />Pump Stations <br />0 <br />Decorative Pavers <br />0 <br />Disposal Wells <br />26 each <br />e <br />Box Culvert <br />0 <br />Roadway <br />Sanitary Sewer <br />Milling & Resurfacing <br />30,500 SY <br />Sanitary Manholes <br />0 <br />Roadway Reconstruction 0 <br />Sanitary Sewer Main <br />0 <br />Swale Reconstruction <br />0 <br />Sewer Lining <br />0 <br />Signalization <br />No <br />Sewer Pump Stations <br />0 <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.