My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />11 <br />1 <br />1 <br />11 <br />STAFFING- RELEVANT EXPERIENCE <br />Role Ric -Man International served as the prime contractor <br />Description of the The work included was for either the replacement or repair of the town's existing water, sanitary sewer, and <br />scope of the work drainage system. The sanitary sewer system was repaired primarily thru the lining of approximately 49,500 LF <br />of pipe, and the full replacement or lining of 1,600 laterals. Also, the scope of work included the rehabilitation <br />of two existing sewer pump station and the construction of three new drainage pump stations, landscaping, <br />and paving. <br />29 <br />c <br />Owner <br />Client <br />Town of Surfside <br />Randy Stokes, Senior Project Manager <br />Address <br />9293 Harding Avenue <br />Surfside, FL 33154 <br />Phone <br />(786) 459 -5131 <br />Email <br />rstokes@townofsurfsidefl.00v <br />- ^' <br />General Contractor <br />Ric -Man International, Inc. <br />Victor G. Menocal, Project Manager <br />Luis Hernandez, Superintendent <br />r <br />Construction Cost <br />$19.6 million <br />) <br />Completion Date <br />July, 2013 <br />Construction Details <br />Scope of Work <br />Water Main <br />Design/Build Project <br />No <br />New Water Main <br />31,500 LF <br />FPL Undergrounding <br />Yes, 23,500LF <br />New Fire Hydrants <br />46 each <br />Residencies <br />1,600 <br />Rear Easement Services <br />350 HDD; 700 open cut <br />Businesses <br />65 <br />Streetscape <br />Storrnwater <br />Trees <br />25 each <br />Manholes <br />30 each <br />Decorative Lighting <br />0 <br />Catch Basins <br />11 each <br />Sidewalks / Driveways <br />14,000 SF <br />Drainage Mains <br />5,500 LF <br />Curb 8 Gutter <br />34,500 LF <br />Pump Stations <br />3 each <br />Decorative Pavers <br />9,000 SF <br />Disposal Wells <br />Outfall Rehab <br />9 each <br />0 <br />Roadway <br />Sanitary Sewer <br />Milling & Resurfacing <br />167,000 SY <br />Sanitary Manholes <br />158 rehabilitated existing <br />Roadway Reconstruction 0 <br />Sanitary Sewer Main <br />5,500 LF (point repairs) <br />Swale Reconstruction <br />165,000 SF <br />Sewer Lining <br />49,500 LF <br />Signalization <br />0 <br />Sewer Pump Stations <br />2 (rehab. of existing) <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.