Laserfiche WebLink
U <br />11 <br />1 <br />1 <br />11 <br />STAFFING- RELEVANT EXPERIENCE <br />Role Ric -Man International served as the prime contractor <br />Description of the The work included was for either the replacement or repair of the town's existing water, sanitary sewer, and <br />scope of the work drainage system. The sanitary sewer system was repaired primarily thru the lining of approximately 49,500 LF <br />of pipe, and the full replacement or lining of 1,600 laterals. Also, the scope of work included the rehabilitation <br />of two existing sewer pump station and the construction of three new drainage pump stations, landscaping, <br />and paving. <br />29 <br />c <br />Owner <br />Client <br />Town of Surfside <br />Randy Stokes, Senior Project Manager <br />Address <br />9293 Harding Avenue <br />Surfside, FL 33154 <br />Phone <br />(786) 459 -5131 <br />Email <br />rstokes@townofsurfsidefl.00v <br />- ^' <br />General Contractor <br />Ric -Man International, Inc. <br />Victor G. Menocal, Project Manager <br />Luis Hernandez, Superintendent <br />r <br />Construction Cost <br />$19.6 million <br />) <br />Completion Date <br />July, 2013 <br />Construction Details <br />Scope of Work <br />Water Main <br />Design/Build Project <br />No <br />New Water Main <br />31,500 LF <br />FPL Undergrounding <br />Yes, 23,500LF <br />New Fire Hydrants <br />46 each <br />Residencies <br />1,600 <br />Rear Easement Services <br />350 HDD; 700 open cut <br />Businesses <br />65 <br />Streetscape <br />Storrnwater <br />Trees <br />25 each <br />Manholes <br />30 each <br />Decorative Lighting <br />0 <br />Catch Basins <br />11 each <br />Sidewalks / Driveways <br />14,000 SF <br />Drainage Mains <br />5,500 LF <br />Curb 8 Gutter <br />34,500 LF <br />Pump Stations <br />3 each <br />Decorative Pavers <br />9,000 SF <br />Disposal Wells <br />Outfall Rehab <br />9 each <br />0 <br />Roadway <br />Sanitary Sewer <br />Milling & Resurfacing <br />167,000 SY <br />Sanitary Manholes <br />158 rehabilitated existing <br />Roadway Reconstruction 0 <br />Sanitary Sewer Main <br />5,500 LF (point repairs) <br />Swale Reconstruction <br />165,000 SF <br />Sewer Lining <br />49,500 LF <br />Signalization <br />0 <br />Sewer Pump Stations <br />2 (rehab. of existing) <br />29 <br />