<br />Mr. Castillo, President, has 32 years of experience in overseeing construction operations of a multi - million dollar company.
<br />He oversees over $38 million of projects per year; these projects include construction /design -build of sanitary sewers,
<br />water mains, force mains, drainage, pump stations, directional drilling, jack & bores, and micro4unnels. His work has
<br />included 10 major neighborhood improvement projects with as many as 2,100 homes; including, streetscope, lighting, and
<br />signalization. Mr. Castillo has a love for the improvement of Florida's infrastructure thereby reducing the impact to the
<br />environment and wildlife which he enjoys photographing.
<br />HIGHLIGHTS
<br />• 42 years of roadway & infrastructure construction
<br />experience
<br />• 6 years of design -build experience
<br />• Underground utility construction experience (4' to 120'
<br />pipe)
<br />• Has worked for all sides of the industry:
<br />- County (inspector /supervisor)
<br />- Design Firm (surveyor /inspector /draftsman)
<br />- Contractor ( foreman /superintendent /estimates /PM)
<br />MEMBERSHIPS
<br />• Cuban - American Association of Civil Engineers, Associate
<br />• Engineering Contractors Association, Member
<br />• Florida Engineering Society, Member
<br />• Broward Supporter, Member
<br />TRAINING & CERTIFICATIONS
<br />• CQM Training, Army Corps of Engineers
<br />• Intermediate Certification, Work Zone Traffic Control
<br />• OSHA 10 Training Certification #001909733
<br />EXPERIENCE
<br />• Ric -Man International, Inc. - Pompano Beach, FL
<br />- President /Financial Qualifying Officer (2011 -Present)
<br />- General Manager, up to $37M in projects (2004 -2010)
<br />• Foster Marine Contactors, Inc. - West Palm Beach, FL
<br />- Project Manager, up to $ l OM in projects (2001 -2004)
<br />• Ric -Man International, Inc. - Pompano Beach, FL
<br />- General Manager, up to $25M in projects (1993 -2001)
<br />- Estimator /Project Manager, up to $25M 11990L 1993)
<br />- Superintendent, up to $I OM in projects 11984 -1990)
<br />- Foreman, up to $5M in projects 11983-19841
<br />• Miami-0ade Water and Sewer Authority - Miami, FL
<br />Asst. Project Engineer, up to $3M in projects (1981 -1983)
<br />Inspector, up to $1.5M in projects 11 979 -1 98 11
<br />• Beiswenger, Hoch & Associates - Miami, FL
<br />- Surveyor /Draftsman 11975-19791
<br />- Road & Bridge Inspector (1972 -1975)
<br />Density Man (1971 -1972)
<br />PROJECT EXPERIENCE
<br />Northeast 163i4 St. Emergency Repair - Sunny Isles Beach, FL
<br />Remove and replace 48' PCCP force main and deteriorated
<br />manholes. After a large sinkhole developed on Sunny Isles Blvd,
<br />MDWSD required the immediate mobilization and repair of their
<br />critical force -main out of the beach. Work was completed ahead of
<br />schedule and with minimal impact to traffic.
<br />Turnpike and Sunrise Boulevard Crossings - Plantation, FL
<br />In-house design build of three critical directional drills required by the
<br />turnpike to relocate the city's water main within six months. The
<br />project required quick turnaround of design, permits and construction.
<br />Mr. Castillo anticipated all the delays and circumvented the typical
<br />red tape delivering the project ahead of schedule and on budget.
<br />Northeast 6" Avenue Drainage - Oakland Pork, FL
<br />Over 2,600 feet of 4x6 box culvert. Original design called for the
<br />box culvert to be installed vertically, which would have resulted in
<br />major utility support and massive de- watering. Mr. Castillo succeeded
<br />in convincing the engineer, the city, and the county to revise the
<br />design to horizontal installation, thereby saving time and impact to
<br />the residents
<br />Broadview Park BPI - Broward County, FL
<br />Installed 105,000 feet of 8' -12" ductile iron water main and 16'
<br />transmission main through a neighborhood of over 2,000 homes.
<br />The scope of this work included water services, fire hydrants, large
<br />meter vaults, a major road crossing, insertion valves on existing
<br />mains, private property water service connections, and restoration.
<br />Nautilus, Neighborhood #7 Rightof -Way - Miami Beach, FL
<br />Installed new 8' water main and connecting homes in front and rear,
<br />drainage improvements including over 250 structures, 18,000 feet of
<br />drainage pipe, and six pump stations as well as lighting, landscape,
<br />and hardscope improvements. Construction had to contend with
<br />accommodating residents and working around two schools and a
<br />hospital. Close coordination with homeowners, schools, businesses,
<br />and public transportation was essential. The overall approach to the
<br />project was to provide quality improvements with minimal impact to
<br />residents.
<br />St. George East - Broward County, FL
<br />Project consisted of complete R/W improvements including sanitary
<br />sewers, water mains, drainage, Swale reconstruction, new curbs,
<br />sidewalks, driveways, landscaping irrigation, and road
<br />reconstruction. This project encompassed a school, park, and a
<br />church requiring site specific MOT and the protection of school
<br />children. We routinely coordinated work through the homeowners
<br />association and attended various homeowner meetings. The Owner
<br />also added $3 million worth of 20' water main extension and
<br />directional drill.