Laserfiche WebLink
lJ <br />z <br />L'J <br />P <br />1 <br />U <br />J <br />u <br />i <br />I'l <br />L <br />L <br />1 <br />L <br />1 <br />Victor G. Menocal <br />Ric -Man International, Inc. - Project Manager <br />Mr. Menocal has over 13 years experience in construction management. He has the experience of overseeing projects <br />ranging from $1.5 million to $177 million. The project scopes include water main, gravity sewer, force mains, drainage, <br />pump stations, lift stations, directional drilling, streetscape improvements, lighting, traffic signal improvements, ITS, <br />neighborhood improvements, minor bridges and major bridges. He was the Project Manager for the FDOT District 6 Section 2 <br />Project in which he was directly in charge of two bridges: Bridge 2 Northbound at Miller Drive and the Pedestrian Bridge <br />between Coral Way and Bird Rd. <br />HIGHLIGHTS <br />13 years of roadway & infrastructure construction experience <br />6 years of design-build experience including 2 bridges <br />r Underground utility construction from 4' to 48' Pipelines <br />r Worked with the Hazen & Sawyer team for 7 years <br />- Served as the Program Manager for the City of Miami <br />Beach's Infrastructure Improvement Program <br />- Approximately $200 million <br />r Holds a B.S. from Florida International University <br />TRAINING & CERTIFICATIONS <br />Army Corp of Engineers <br />- Construction Quality Management for Contractors <br />Certificate <br />Workzone Traffic Control <br />- Advanced Level Certified <br />OSHA 30-Hr Training Certification #600429738 <br />EXPERIENCE <br />Ric -Man International, Inc. - Pompano Beach, FL <br />- Project Manager, up to $21 M in projects (2010 - Present) <br />Condotte America - Miami, FL <br />- Project Manager, up to $177M in projects (2008 to 2009) <br />A2 Group, Inc. - Miami, FL <br />- Project Manager, up to $42M in projects (20042008) <br />PROJECT EXPERIENCE <br />Broadview Park BP2 Neighborhood Improvements <br />Broward County, Florida <br />Installation of 36,500 feet of 8' -5" PVC and DIP gravity sewer main <br />including 3 sewer pump stations with 14,500 feet of 6' -12' force <br />main; furthermore, Ric -Man International also installed 16,700 feet of <br />15' -24' RCP and HDPE drainage through a neighborhood of 760 <br />homes. The project required full reconstruction of 100,000 square <br />yards including 2 lifts of V 112 inch asphalt This design also includes <br />reclaiming 65,000 square yards of swales for additional drainage <br />storage The project budget was approximately $17. 1 million. <br />FDOT District 6 Section 2 Project (Personal Exp.) <br />This is a design build /finance project for the Florida Department of <br />Transportation District Vt. The work consists of the addition of one <br />general use lane in each direction; auxiliary lanes between all <br />interchanges; interchange improvements and, operational and safety <br />improvements along the SR826 mainline and ramps. The <br />interchanges that will be improved with this project are the SR826 <br />interchanges at SW 56 Street /Miller Drive, 5R874 1Don Shula <br />Expressway and SW 40 Street /Bird Road. Four of the bridges are <br />over the CSX railroad and are comprised of steel girders. The other <br />interchange bridges are designed with concrete beams (AASHTO <br />Type M Mod. Bulb Tee, Florida I Beams). This project also includes a <br />new pedestrian bridge, new drainage, lighting, landscaping <br />improvements, ITS and signol,zation improvements. <br />Town of Surfside Infrastructure Rehabilitation Project <br />Surfside, Florida <br />Project consisted of infrastructure improvements to the Town of Sudside <br />including the replacement of approximately 31,000 feet of water <br />main, 5,600 feet of RCP drainage conveyance pipe, 9 drainage wells, <br />58 drainage structures, 3 drainage pump stations, rehabilitation of <br />49,000 feet of sewer system and rehabilitation of 2 sewer pump <br />stations. In addition, this project required extension coordination with <br />residents since all water meters were located at the existing rear <br />easements of homes and we were tasked with relocating the meters to <br />the front of approximately 1,400 homes. This required daily <br />coordination with the Public Information Officer and the Town of <br />Surfside representatives. The project budget was approximately <br />$19. 1 million. <br />Flamingo BP l0E (Little Flamingo) Streetscape Improvement <br />Miami Beach, Florida <br />Design-build project consisted of the replacement of 5, 100 feet of <br />water main and 3,800 feet of drainage mains that included <br />approximately 900 feet of 3x5 box culvert along Meridian Avenue, as <br />well as over 100 drainage structures including 10 gravity wells. The <br />scope of work also included lighting, signolization, and landscape <br />improvements in a neighborhood of 1,600 residencies and 65 <br />businesses located between Washington Avenue and Meridian <br />Avenue, from 7th Street to 9th Street. This project required a major <br />coordination effort with the restaurants, nightclubs, other existing <br />businesses, residents, school, and public transportation. The project <br />budget was approximately $4.5 million. <br />33 <br />