<br />Victor G. Menocal
<br />Ric -Man International, Inc. - Project Manager
<br />Mr. Menocal has over 13 years experience in construction management. He has the experience of overseeing projects
<br />ranging from $1.5 million to $177 million. The project scopes include water main, gravity sewer, force mains, drainage,
<br />pump stations, lift stations, directional drilling, streetscape improvements, lighting, traffic signal improvements, ITS,
<br />neighborhood improvements, minor bridges and major bridges. He was the Project Manager for the FDOT District 6 Section 2
<br />Project in which he was directly in charge of two bridges: Bridge 2 Northbound at Miller Drive and the Pedestrian Bridge
<br />between Coral Way and Bird Rd.
<br />HIGHLIGHTS
<br />13 years of roadway & infrastructure construction experience
<br />6 years of design-build experience including 2 bridges
<br />r Underground utility construction from 4' to 48' Pipelines
<br />r Worked with the Hazen & Sawyer team for 7 years
<br />- Served as the Program Manager for the City of Miami
<br />Beach's Infrastructure Improvement Program
<br />- Approximately $200 million
<br />r Holds a B.S. from Florida International University
<br />TRAINING & CERTIFICATIONS
<br />Army Corp of Engineers
<br />- Construction Quality Management for Contractors
<br />Certificate
<br />Workzone Traffic Control
<br />- Advanced Level Certified
<br />OSHA 30-Hr Training Certification #600429738
<br />EXPERIENCE
<br />Ric -Man International, Inc. - Pompano Beach, FL
<br />- Project Manager, up to $21 M in projects (2010 - Present)
<br />Condotte America - Miami, FL
<br />- Project Manager, up to $177M in projects (2008 to 2009)
<br />A2 Group, Inc. - Miami, FL
<br />- Project Manager, up to $42M in projects (20042008)
<br />PROJECT EXPERIENCE
<br />Broadview Park BP2 Neighborhood Improvements
<br />Broward County, Florida
<br />Installation of 36,500 feet of 8' -5" PVC and DIP gravity sewer main
<br />including 3 sewer pump stations with 14,500 feet of 6' -12' force
<br />main; furthermore, Ric -Man International also installed 16,700 feet of
<br />15' -24' RCP and HDPE drainage through a neighborhood of 760
<br />homes. The project required full reconstruction of 100,000 square
<br />yards including 2 lifts of V 112 inch asphalt This design also includes
<br />reclaiming 65,000 square yards of swales for additional drainage
<br />storage The project budget was approximately $17. 1 million.
<br />FDOT District 6 Section 2 Project (Personal Exp.)
<br />This is a design build /finance project for the Florida Department of
<br />Transportation District Vt. The work consists of the addition of one
<br />general use lane in each direction; auxiliary lanes between all
<br />interchanges; interchange improvements and, operational and safety
<br />improvements along the SR826 mainline and ramps. The
<br />interchanges that will be improved with this project are the SR826
<br />interchanges at SW 56 Street /Miller Drive, 5R874 1Don Shula
<br />Expressway and SW 40 Street /Bird Road. Four of the bridges are
<br />over the CSX railroad and are comprised of steel girders. The other
<br />interchange bridges are designed with concrete beams (AASHTO
<br />Type M Mod. Bulb Tee, Florida I Beams). This project also includes a
<br />new pedestrian bridge, new drainage, lighting, landscaping
<br />improvements, ITS and signol,zation improvements.
<br />Town of Surfside Infrastructure Rehabilitation Project
<br />Surfside, Florida
<br />Project consisted of infrastructure improvements to the Town of Sudside
<br />including the replacement of approximately 31,000 feet of water
<br />main, 5,600 feet of RCP drainage conveyance pipe, 9 drainage wells,
<br />58 drainage structures, 3 drainage pump stations, rehabilitation of
<br />49,000 feet of sewer system and rehabilitation of 2 sewer pump
<br />stations. In addition, this project required extension coordination with
<br />residents since all water meters were located at the existing rear
<br />easements of homes and we were tasked with relocating the meters to
<br />the front of approximately 1,400 homes. This required daily
<br />coordination with the Public Information Officer and the Town of
<br />Surfside representatives. The project budget was approximately
<br />$19. 1 million.
<br />Flamingo BP l0E (Little Flamingo) Streetscape Improvement
<br />Miami Beach, Florida
<br />Design-build project consisted of the replacement of 5, 100 feet of
<br />water main and 3,800 feet of drainage mains that included
<br />approximately 900 feet of 3x5 box culvert along Meridian Avenue, as
<br />well as over 100 drainage structures including 10 gravity wells. The
<br />scope of work also included lighting, signolization, and landscape
<br />improvements in a neighborhood of 1,600 residencies and 65
<br />businesses located between Washington Avenue and Meridian
<br />Avenue, from 7th Street to 9th Street. This project required a major
<br />coordination effort with the restaurants, nightclubs, other existing
<br />businesses, residents, school, and public transportation. The project
<br />budget was approximately $4.5 million.