|
r
<br />1
<br />1
<br />F
<br />i
<br />1
<br />1
<br />1
<br />1
<br />1
<br />I
<br />1
<br />1
<br />Ll
<br />11
<br />STEVEN R. MCNAMARA
<br />President
<br />EDUCATION: Business Management, University of
<br />Florida
<br />LICENSES:
<br />Certified General Contractor, State of Florida
<br />License No. CGCO34805
<br />Certified Underground Utility Contractor, Florida
<br />License No. CUC041514
<br />General Engineering Contractor, Miami -Dade County,
<br />License No. E -149
<br />Engineering Contractor Category 2 -B,
<br />Broward County, FL, License no. 86 -949
<br />Stormwater Management Inspector, Florida
<br />Department of Environmental Protection
<br />License No. 9580
<br />EMPLOYMENT:
<br />Anzac Contractors, Inc.
<br />PresidenUChief Estimator and Project Manager
<br />1983 — Present
<br />Mr. McNamara has over 27 years experience in the
<br />construction industry and is responsible for all aspects
<br />of Anzac's business operations which include handling
<br />all bonding & insurance issues, Contract
<br />Administration, new business development, meeting
<br />with Owners and Clients to negotiate new work,
<br />researching potential bid opportunities, managing and
<br />overseeing the bidding process, negotiating contracts,
<br />overseeing Project Managers and Superintendents
<br />throughout the construction of all projects, developing
<br />schedules, meeting with Engineers to provide
<br />assistance or constructability, reviews for new designs
<br />and/or working on Design -Build projects, overseeing
<br />and planning the replacement and acquisition of new
<br />equipment for the construction fleet.
<br />RELEVANT EXPERIENCE:
<br />Broward Boulevard Bridge Replacements, City of
<br />Plantation Design -Build Contract No. 04-02
<br />Plantation, FL
<br />Anzac was the Design -Build Contractor on this project
<br />that involved the demolition and replacement of two
<br />existing bridges, MOT, construction of a temporary
<br />road and canal crossing to provide access to a high -
<br />profile residential island community during bridge
<br />replacement, Clearing, Roadway, Channel Excavation,
<br />Slope Protection, Temporary & Permanent Steel Sheet
<br />Pile Walls, Traffic Railings, Approach Slabs, Large
<br />CMP Culverts, Paving, Drainage, Guardrails, Markings
<br />& Signs, Lighting & Signalization, Temporary &
<br />Permanent Water Main Construction, Utility Jack &
<br />Bores, Landscaping & Sodding, Stamped Concrete
<br />Structural Slabs, Decorative Brick Walls and Copings
<br />on Bridge Crossings, Quality Control Testing.
<br />Busway Extension to Florida City
<br />MDX Contact TA01- BWX -1S
<br />Miami, FL
<br />Widening and Rehabilitation of two bridges on US -1
<br />and construction of one new bridge for a dedicated
<br />Busway parallel and adjacent to US -1, Demolition of
<br />Existing Structures, Channel Excavation, Slope
<br />Protection Revetment Mats, Pile Driving, Reinforcing
<br />Steel, Concrete, Inverted Tee Beams, SIP Forms,
<br />Traffic Railings, Approach Slabs, Excavation, Grading
<br />& Compaction for Structures, 3000 lineal feet of cast -
<br />in -place Retaining Walls with footings, Aluminum
<br />Handrails, Class V Coating, Bridge Floor Grooving.
<br />Taylor Slough Bridges, Central & Southern Florida
<br />Project for Flood Control, Army Corps of
<br />Engineers Contract No. DACW17 -99-C -0028,
<br />Everglades National Park, Florida City, FL
<br />Construction of two new bridges, one bridge
<br />measuring 275 If and one bridge measuring 375 If
<br />inside Everglades National Park, one replaced an
<br />existing 90 If bridge and the second one was a new
<br />bridge, construction of a temporary detour road and a
<br />temporary "Mabey" bridge, Demolition of Existing
<br />Structures and 535 If of Degrading of Existing Road &
<br />Channel Excavation performed under a zero turbidity
<br />tolerance monitored twice a day with no negative
<br />readings ever recorded during construction, Anzac
<br />designed the temporary bridge foundations and
<br />superstructure in manner that had the least impact on
<br />the very sensitive environment during construction and
<br />removal, Anzac submitted and received approval form
<br />the Corps on a very unique redesign for the
<br />foundations on the permanent bridge structures using
<br />a combination of a 48" Drilled Shaft and a 20" Precast
<br />Column, Anzac precast the 20' Columns at our facility
<br />and self - performed the construction of the 48" Drilled
<br />Shafts, Reinforcing Steel, Concrete, Aluminum
<br />Handrails, Guardrails, Class V Coating.
<br />SR-862 (1-595) Greenway — West, FOOT Financial
<br />Project No. 420809- 3 -52 -01, Broward County 86095
<br />Worked with Dragados USA on the design and
<br />construction of four large pedestrian bridges. This is
<br />the beginning of a $1.8 Billion dollar project to create a
<br />privately design, build, owned and operated toll road
<br />extending from the Florida Turnpike to 1 -75.
<br />1 38
<br />
|