Laserfiche WebLink
r <br />1 <br />1 <br />F <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />I <br />1 <br />1 <br />Ll <br />11 <br />STEVEN R. MCNAMARA <br />President <br />EDUCATION: Business Management, University of <br />Florida <br />LICENSES: <br />Certified General Contractor, State of Florida <br />License No. CGCO34805 <br />Certified Underground Utility Contractor, Florida <br />License No. CUC041514 <br />General Engineering Contractor, Miami -Dade County, <br />License No. E -149 <br />Engineering Contractor Category 2 -B, <br />Broward County, FL, License no. 86 -949 <br />Stormwater Management Inspector, Florida <br />Department of Environmental Protection <br />License No. 9580 <br />EMPLOYMENT: <br />Anzac Contractors, Inc. <br />PresidenUChief Estimator and Project Manager <br />1983 — Present <br />Mr. McNamara has over 27 years experience in the <br />construction industry and is responsible for all aspects <br />of Anzac's business operations which include handling <br />all bonding & insurance issues, Contract <br />Administration, new business development, meeting <br />with Owners and Clients to negotiate new work, <br />researching potential bid opportunities, managing and <br />overseeing the bidding process, negotiating contracts, <br />overseeing Project Managers and Superintendents <br />throughout the construction of all projects, developing <br />schedules, meeting with Engineers to provide <br />assistance or constructability, reviews for new designs <br />and/or working on Design -Build projects, overseeing <br />and planning the replacement and acquisition of new <br />equipment for the construction fleet. <br />RELEVANT EXPERIENCE: <br />Broward Boulevard Bridge Replacements, City of <br />Plantation Design -Build Contract No. 04-02 <br />Plantation, FL <br />Anzac was the Design -Build Contractor on this project <br />that involved the demolition and replacement of two <br />existing bridges, MOT, construction of a temporary <br />road and canal crossing to provide access to a high - <br />profile residential island community during bridge <br />replacement, Clearing, Roadway, Channel Excavation, <br />Slope Protection, Temporary & Permanent Steel Sheet <br />Pile Walls, Traffic Railings, Approach Slabs, Large <br />CMP Culverts, Paving, Drainage, Guardrails, Markings <br />& Signs, Lighting & Signalization, Temporary & <br />Permanent Water Main Construction, Utility Jack & <br />Bores, Landscaping & Sodding, Stamped Concrete <br />Structural Slabs, Decorative Brick Walls and Copings <br />on Bridge Crossings, Quality Control Testing. <br />Busway Extension to Florida City <br />MDX Contact TA01- BWX -1S <br />Miami, FL <br />Widening and Rehabilitation of two bridges on US -1 <br />and construction of one new bridge for a dedicated <br />Busway parallel and adjacent to US -1, Demolition of <br />Existing Structures, Channel Excavation, Slope <br />Protection Revetment Mats, Pile Driving, Reinforcing <br />Steel, Concrete, Inverted Tee Beams, SIP Forms, <br />Traffic Railings, Approach Slabs, Excavation, Grading <br />& Compaction for Structures, 3000 lineal feet of cast - <br />in -place Retaining Walls with footings, Aluminum <br />Handrails, Class V Coating, Bridge Floor Grooving. <br />Taylor Slough Bridges, Central & Southern Florida <br />Project for Flood Control, Army Corps of <br />Engineers Contract No. DACW17 -99-C -0028, <br />Everglades National Park, Florida City, FL <br />Construction of two new bridges, one bridge <br />measuring 275 If and one bridge measuring 375 If <br />inside Everglades National Park, one replaced an <br />existing 90 If bridge and the second one was a new <br />bridge, construction of a temporary detour road and a <br />temporary "Mabey" bridge, Demolition of Existing <br />Structures and 535 If of Degrading of Existing Road & <br />Channel Excavation performed under a zero turbidity <br />tolerance monitored twice a day with no negative <br />readings ever recorded during construction, Anzac <br />designed the temporary bridge foundations and <br />superstructure in manner that had the least impact on <br />the very sensitive environment during construction and <br />removal, Anzac submitted and received approval form <br />the Corps on a very unique redesign for the <br />foundations on the permanent bridge structures using <br />a combination of a 48" Drilled Shaft and a 20" Precast <br />Column, Anzac precast the 20' Columns at our facility <br />and self - performed the construction of the 48" Drilled <br />Shafts, Reinforcing Steel, Concrete, Aluminum <br />Handrails, Guardrails, Class V Coating. <br />SR-862 (1-595) Greenway — West, FOOT Financial <br />Project No. 420809- 3 -52 -01, Broward County 86095 <br />Worked with Dragados USA on the design and <br />construction of four large pedestrian bridges. This is <br />the beginning of a $1.8 Billion dollar project to create a <br />privately design, build, owned and operated toll road <br />extending from the Florida Turnpike to 1 -75. <br />1 38 <br />