Laserfiche WebLink
I <br />D <br />�J <br />Carlos M. Herdocia PE, LEEDAP <br />Senior Civil Engineer <br />0 <br />Mr. Herdocia has over 24 years of experience and has been Project Manager and Senior Design Engineer on various <br />roadway and drainage projects for municipalities in Miami -Dade County. He has extensive experience in developing <br />residential, commercial and highway roadway and drainage plans. This experience includes traffic calming, resurfacing <br />and reconstruction plans, drainage design studies and reports, maintenance of traffic, signalization, lighting and signing <br />and marking plans. <br />IEDUCATION <br />1 - denotes projects completed with other firms <br />a two lane divided roadway within an 80 foot right of way. The <br />proposed corridor design consisted of standard travel lanes, <br />bicycle lanes, parking stalls with landscape bump-outs after <br />every second parking stall, a landscaped median, traffic <br />separator, standard curb and gutter, sidewalk, school bus drop- <br />off, pavement marking and signage, roadway lighting and <br />report, school zone with applicable markings, signs and <br />flashers, and modification of existing traffic signal at US- 1. <br />Design elements of siormwater management included over <br />3,150 feet of exfiltration trench, 2,000 feet of solid pipe, 45 <br />drainage structures, pollution control structure with on <br />emergency overflow into Naranjo Canal with a riprop end wall <br />and manatee grate. Services also included preliminary field <br />investigations, utility coordination, computation book, drainage <br />report, detailed cost estimates and permitting through DERM. <br />Traffic Calming Devices and Right of Way Improvements <br />(Phases I and II(', Doral, Florida <br />Project Manager for the design and construction of traffic <br />calming devices and right of way improvements within the City <br />limits. C3TS is the prime design firm for this design /build <br />project that includes the design and permitting of one traffic <br />circle at the intersection of NW 109th Avenue and NW 86th <br />Street and two splitter islands on SW 78th Street. The project <br />also includes new curb and gutters, pavement milling and <br />resurfacing, powered crosswalks (at traffic circle only), and <br />landscaped medians. <br />Town of Bay Harbor Islands - Residential Street Closure <br />and Traffic Study', Bay Harbor Islands, Florida <br />fro RIC study for the implementation of several street closure, <br />landscaping and guardhouse facilities to included <br />Neighborhood Public Involvement Work Shops. This was done <br />in support of a Special Taxing District to add security provisions <br />for both sides of the Island. <br />Crandon Boulevard Master Plan, Key Biscayne, FL - <br />Project Engineer for this project that took on existing suburban <br />style highway and transformed it into a center of community <br />activities. By promoting the safe and secure transit of all type <br />s of vehicles and pedestrians, this CPTED- friendly design also <br />serves to create a source of identity for the community <br />connecting retail, residential, public parks and government <br />facilities into a cohesive design. <br />One Team. Infinite Solutions. 51 <br />Bachelor of Science in Civil Engineering, Florida <br />International University, Miami, Florida, 1988 <br />REGISTRATIONS <br />LEED Accredited Professional, U.S. Green Building <br />Council <br />Professional Engineer #47660, State of Florida <br />1 <br />PROJECT EXPERIENCE <br />Town of Golden Beach Capital Improvements Program', <br />Golden Beach, Florida <br />Senior Civil Engineer for this comprehensive Capitol <br />Improvements Program Master Plan that focuses on several <br />major improvement areas: town -wide drainage improvements; <br />utilities underground relocation (electrical, telephone, cable); <br />town -wide sne tscope & traffic calming; and renovation to the <br />Town's existing Town Hall building. The Master Plan carefully <br />considered the each of these with respect to feasibility, <br />cost/benefit, and design, as well as on analysis of funding <br />options and scenarios, and schedule for phasing and <br />implementation <br />Design & Construction Services for John F. Kennedy <br />Causeway Redevelopment North Bay Village', Florida <br />Senior Engineer for this project that involves the design and <br />construction services for the redevelopment of the John F. <br />Kennedy Causeway. The project will be implemented in several <br />phases. Phase I will be the landscape design and construction <br />of sheet beautification improvements to the western end of the <br />Causeway. While this phase is being implemented, a <br />conceptual master pion shall be prepared to address the <br />complete beautification and redevelopment program for <br />Kennedy Causeway which includes the roadway, adjacent <br />business district, and the waterfront. <br />SW 264th Street Improvements (US-1 to SW 137th <br />Avenue(', Miami -Dode County, Florida <br />Project Manager and Senior Project Engineer (Engineer of <br />Record) involved with the design far the proposed street <br />improvements for SW 264th Street (approx. 0.74 miles). Design <br />elements included o new configuration for SW 264th Street with <br />1 - denotes projects completed with other firms <br />a two lane divided roadway within an 80 foot right of way. The <br />proposed corridor design consisted of standard travel lanes, <br />bicycle lanes, parking stalls with landscape bump-outs after <br />every second parking stall, a landscaped median, traffic <br />separator, standard curb and gutter, sidewalk, school bus drop- <br />off, pavement marking and signage, roadway lighting and <br />report, school zone with applicable markings, signs and <br />flashers, and modification of existing traffic signal at US- 1. <br />Design elements of siormwater management included over <br />3,150 feet of exfiltration trench, 2,000 feet of solid pipe, 45 <br />drainage structures, pollution control structure with on <br />emergency overflow into Naranjo Canal with a riprop end wall <br />and manatee grate. Services also included preliminary field <br />investigations, utility coordination, computation book, drainage <br />report, detailed cost estimates and permitting through DERM. <br />Traffic Calming Devices and Right of Way Improvements <br />(Phases I and II(', Doral, Florida <br />Project Manager for the design and construction of traffic <br />calming devices and right of way improvements within the City <br />limits. C3TS is the prime design firm for this design /build <br />project that includes the design and permitting of one traffic <br />circle at the intersection of NW 109th Avenue and NW 86th <br />Street and two splitter islands on SW 78th Street. The project <br />also includes new curb and gutters, pavement milling and <br />resurfacing, powered crosswalks (at traffic circle only), and <br />landscaped medians. <br />Town of Bay Harbor Islands - Residential Street Closure <br />and Traffic Study', Bay Harbor Islands, Florida <br />fro RIC study for the implementation of several street closure, <br />landscaping and guardhouse facilities to included <br />Neighborhood Public Involvement Work Shops. This was done <br />in support of a Special Taxing District to add security provisions <br />for both sides of the Island. <br />Crandon Boulevard Master Plan, Key Biscayne, FL - <br />Project Engineer for this project that took on existing suburban <br />style highway and transformed it into a center of community <br />activities. By promoting the safe and secure transit of all type <br />s of vehicles and pedestrians, this CPTED- friendly design also <br />serves to create a source of identity for the community <br />connecting retail, residential, public parks and government <br />facilities into a cohesive design. <br />One Team. Infinite Solutions. 51 <br />