Laserfiche WebLink
i <br />I <br />u <br />i <br />11 <br />J <br />1 <br />'LJ <br />1 <br />11 <br />1 <br />1 <br />I <br />U <br />Diana Sudasassi - Bilbao PE 06 <br />Senior Civil Engineer StaJtb2t <br />Mrs. Sudasassi- Bilbao, with over 18 years of experience, has been Project Engineer, Project Manager, and Engineer of <br />Record on many traffic calming and roadway projects, and is responsible for the design and production of several <br />municipal roadway improvement projects undertaken by the firm. She is experienced in developing residential, commercial <br />and highway lighting and roadway plans. This experience includes implementation of traffic calming devices such as <br />roundabouts and diverter islands, resurfacing and reconstruction plans, drainage design studies and reports, maintenance <br />of traffic, signalization, lighting and signing and marking plans. She has a good drainage and lighting background with <br />many of the local regulatory agencies. <br />EDUCATION <br />Bachelor of Science in Civil Engineering, Florida <br />International University, Miami, Florida, 1994 <br />REGISTRATIONS <br />Professional Engineer #56926, State of Florida <br />PROJECT EXPERIENCE <br />Town of Golden Beach Capital Improvements', Golden <br />Beach, Florida <br />Senior Engineer for this comprehensive Capital Improvements <br />Program Master Plan which focuses on several major <br />improvement areas' town -wide drainage improvements; utilities <br />underground relocation (electrical, telephone, cable); town -wide <br />streetscope & traffic calming; and renovation to the Town's <br />existing Town Hall building. The Master Plan carefully <br />considered the each of these with respect to feasibility, <br />cost /benebt, and design, as well as on analysis of funding <br />options and scenarios, and schedule for phasing and <br />implementation. <br />Plantation Midtown Improvements and Greenway Transit <br />Route', Plantation, Florida <br />Senior Engineer for the master plan, engineering design, and <br />construction administration of this project that consisted of <br />revitalizing the entire central business district of the City and <br />creating a mixed use area conducive to pedestrian friendly use <br />and access. The project included the reconstruction of 2.5 miles <br />of mixed use walkways, textured crosswalks, parallel parking, <br />landscaped medians, and a roundabout at a key intersection of <br />the City. The firm' design will be the template for all <br />improvements to follow in the City's midtown area. We have <br />worked with the City in designing the route that the first phase <br />of the bus transit will operate as well as helped them research <br />the different type of transit vehicles available to them. In <br />working hand in hand with the City on this issue, we are <br />ensuring that the design we deliver meets the needs and <br />expectations for the entire scope of their greenwoy project. <br />Caribbean Blvd. (Coral Sea Rd. to SW 87Ave.)', Cutler <br />Bay, Florida <br />Project Manager of design improvements for the portion of <br />Caribbean Blvd. between Coral Sea Road and SW 87th <br />Avenue. The project consists of roadway improvements, two (2) <br />traffic circles, pavement reconstruction, curbwork, sidewalks, <br />drainage facilifies, medians, turn lanes, landscaping and <br />roadway lighting. This portion of Caribbean Blvd. is primarily a <br />residential road. This Miami -Dade County roadway is <br />considered a collector roadway. The proposed configuration for <br />Caribbean Blvd. will include roundabouts at Gulf Stream Rd. <br />and SW 192 Dr. for troffic calming and beautification. The <br />corridor will be a two lane roadway with turn krnes, landscape <br />medians and traffic calming splitter islands where plausible. <br />Permitting including Miami -Lode County Public Works, DERM <br />and Town of Cutler Bay. <br />Miracle Mile Redevelopment Streetscope', Coral <br />Gables, Florida <br />Civil Engineer for the redevelopment of Miracle Mile. This <br />proposed project will help transform the Coral Gables <br />Downtown area into a vibrant epicenter of the local community. <br />Some of the enhancements include wider sidewalks with more <br />open public space to attract foot traffic, improved urban <br />lighting, tree grates, benches, kiosks, signage, throughways to <br />garages, and upgraded drainage facilities. In creating a more <br />vibrant atmosphere for locals, this Streetscope Project will <br />inherently serve to attract a larger share of Greater Miami's <br />visitors, including the economic impact they generate, to <br />Downtown Coral Gables. <br />Sunset Drive Improvements', South Miami, Florida <br />Project Engineer for the development of roadway plans <br />including drainage, utility coordination, pavement markings and <br />lighting. Coordination of permitting requirements on behalf of <br />the client. Responsible for transmittals, shop drawing reviews, <br />preliminary cost estimates and construction plan clarifications. <br />• denotes projects completed with other firms One Team. Infinite Solutions. <br />52 <br />