Laserfiche WebLink
I <br />1 <br />1 <br />I <br />1 <br />LJ <br />i <br />I <br />I <br />I <br />i <br />F <br />F,I <br />L <br />1 <br />U <br />Randy Pool PE, LEED®AP <br />Senior MEP Engineer <br />0 <br />Mr. Pool offers over 25 years of experience in mechanical engineering design, analysis and project management for the <br />design, retrofit, replacement and expansion of systems for a variety of engineering - intensive and sustainably- Focused <br />projects. His representative projects include new resort hotels, major hospitality expansion /renovation projects, and new <br />performing arts centers. As a frequent lecturer and author of technical publications, his focus on advancing the state-of-the- <br />industry in engineering design has developed a particular sensitivity to critical design issues for creative, cost-effective <br />solutions for specific applications. Mr. Pool's recent projects have been awarded the American Council of Engineering <br />Companies of North Carolina (ACEC) Honors Award in 2005, Grand Conceptor Award in 2006 and Grand Award in <br />2009, and the American Council of Engineering Companies (ACEC) Engineering Excellence National Finalist Awards in <br />2005, 2006, and 2009. He is a registered engineer in 14 states. <br />V OWKWIS <br />Bachelor of Science, Mechanical Engineering, Georgia <br />Institute of Technology, Atlanta, Georgia, 1983 <br />REGISTRATIONS <br />Professional Engineer #44311, State of Florida <br />Professional Engineer #41507, State of Colorado <br />Professional Engineer #46987, State of Arizona <br />Professional Engineer #085056, State of New York <br />Professional Engineer #6201053667, State of Michigan <br />Professional Engineer #11885, State of New Hampshire <br />Professional Engineer #20275, State of Georgia <br />Professional Engineer #17696, State of South Carolina <br />Professional Engineer #33932, State of Wisconsin <br />PROJECT EXPERIENCE <br />Broward County Convention Center - Fort Lauderdale, <br />FL' (Mechanical Engineer) <br />This $25MM, 200,000 SF addition to the existing Convention <br />Center expanded the exhibit halls, conference rooms, lobby <br />area, administration and support areas. <br />30 East 60th Street Expansion, New York, New York <br />(Principal in Charge and Senior Mechanical Engineer) <br />Mechonical, electrical, and plumbing engineering design of an <br />I 1 -story expansion /overbuild of an existing 15 -story, 1910ero <br />hotel. The design included infrastructure replacement to support <br />the expansion and back -feed the existing building HVAC, <br />electrical, plumbing, and fire protection systems. Seamless <br />integration, phasing and cutover for each of the systems was an <br />important design focus, as the facility was occupied during <br />construction and infrastructure downtime had to be minimized. <br />Palm Beach Community College, Florida' principal-In- <br />Charge, Project Manager) <br />This new $14M, 110,000 SF vocational and educational <br />training facility focuses on trade industry, health occupations, <br />automotive occupations, business applications and public <br />service programs. Virtual /simulated experience classrooms and <br />an auditorium are also part of the facility. <br />USGBC Headquarters Upfit, Washington, D.C. (Engineer <br />of Record and Senior Mechanical Engineer( <br />Responsible for the design of highly efficient VOW system with <br />thermal energy recovery system, LED lighting, day light <br />harvesting, and low -flow plumbing fixtures. The project is <br />certified as LEDO Platinum and involved a 30,000 SF abaft for <br />the new headquarters of the US Green Building Council, which <br />is the governing body for LED accreditation and the leader in <br />sustainable design. LEED ospeds and occupant comfort were <br />key design criteria for this project. <br />Raymond F. Kravis Center for Performing Arts`, West <br />Palm Beach, FL (Principal-in- Charge and Senior. <br />Mechanical Engineer( <br />Responsible for 20004on chiller plant expansion, under floor air <br />distribution, ultra quiet equipment and ductwork selection, and <br />smoke evacuation system. The $30M, 130,000 SF expansion to <br />the existing Kravis Center for the Performing Arts included a <br />two-level underground parking garage, community banquet <br />halls, administration facility, pre4unction halls, rehearsal facility, <br />education facility and board rooms. <br />Shore Club Hotel Expansion', Miami Beach, FL <br />(Principal-in- Charge <br />This $55MM expansion included a 19 -story tower with 325 <br />rooms, fitness center /spa and fine dining establishments <br />including Nobu with Robert DeNiro. <br />Port of Palm Beach, Cruise Terminal and Office Building - <br />Riviera Beach, FL' (Principaf+nCharge, Mechanical <br />Engineer) <br />Responsible for the design of HVAC including air-cooled <br />chillers, VAV air handling units, distribution ductwork, and <br />chilled -water piping. This project involved the design and <br />construction of a $14MM, 96,000 SF, 6-story structure which <br />accommodates cruise passenger facilities, offices for the Port of <br />Palm Beach, U.S Immigrations, U.S. Customs, and the U.S. <br />Deportment of Agriculture, as well as offices for several cruise <br />line companies <br />i- denotesprojectscompletedwithotherfirms One Team. Infinite Solutions. <br />L. <br />