|
P
<br />I�
<br />J
<br />IJ
<br />i
<br />IJ
<br />I•
<br />1
<br />1
<br />r
<br />L
<br />d
<br />I�
<br />1
<br />I
<br />LJ
<br />II
<br />i
<br />Dando Caicedo MCE, El
<br />Senior Inspector
<br />0
<br />Stantec
<br />Mr. Caicedo has over 32 years of experience in all phases of construction and inspections. During this time he has built
<br />multi - million dollar projects from initial to final phase, commercial developments to custom single family housing, has
<br />carried out daily on -site inspections and supervision, maintaining excellent communication skills and safety standards. He
<br />has acquired building permits and supervised project construction as well as review of plans and specifications.
<br />EDUCATION Master Plan was prepared that included a computerized model
<br />Master of Science in Civil Engineering, Norwich of the entire system and public workshops and meetings were
<br />University, Northfield, Vermont, 2009 held to inform and educate the residents of the work and cost
<br />involved in the project. The firm also prepared special taxing
<br />Bachelor of Science in Engineering, Florida International districts and an EQCB Variance to detail the finances of this
<br />University, Miami, Florida, 1990 $23 million project.
<br />REGISTRATIONS
<br />Engineering Intern # 1100009198, State of Florida
<br />PROJECT EXPERIENCE
<br />Ferry Station, Port of Miami', Fisher Island Ferry
<br />Terminal, Miami, Florida
<br />Senior Inspector for the repair and rehabilitation of a 30-year
<br />old water platform in Government Cut, Miami Beach. The
<br />existing fivelone Ferry Terminal serves as the main entry point
<br />for residents. The terminal extends over a salt -water canal and is
<br />composed of precast slabs spanning between reinforced
<br />concrete bents supported by prestressed piles. Nineteen of the
<br />existing structure's sxty -five floor slab units were replaced and
<br />extensive repairs of the substruction piling, beams, and
<br />bulkheads were done. A full redesign of new precast slabs,
<br />and extensive plans depicting construction phasing and repair
<br />methods and sequencing were provided to the client.
<br />Construction was divided into four phases, so that all repairs
<br />were able to take place without closing the terminal. Also
<br />completed was permitting through FDEP, Miami Dade County
<br />DERM, ACOE, and the Miami Beach Building Department.
<br />29"' Street Bridge Repairs', Miami Beach, Florida
<br />Construction Administration and Engineering Inspector for
<br />various structural repairs completed, which included spoiling,
<br />crocking, and delineations. The heavily deteriorated beams,
<br />bents, and deck underside were fully rehabilitated. The bridge
<br />was fully operational during the entire duration of the project,
<br />and delivered ahead of schedule and within budget.
<br />Pinecrest Watermain Master Plan and System Design',
<br />Pinecrest, Florida
<br />Senior Inspector for the design clover 27 miles of watermain to
<br />complete the potable water system of the entire Village. The
<br />Sunset Drive Improvements (West of US 1 j', South Miami,
<br />Florida
<br />Senior Inspector for this master planning project involving the
<br />development of conceptual streetscope and infrastructure
<br />improvements along Sunset Drive from the western city limits to
<br />US 1. These include delineating intersections with concrete pavers
<br />and crosswalks, redefining roadways sections, and providing
<br />new lighting and landscape design to increase public safety and
<br />appeal. In addition, a new architectural site plan for City Hall
<br />was designed incorporating surrounding public spaces and
<br />facilities to create an enhanced civic and community space. The
<br />master plan was developed substantially in accordance with the
<br />City's Hometown Pion Area 2, and evaluated proposed
<br />improvements with respect to their feasibility, cost/benefit,
<br />design, and construction. In addition, the firm held three public
<br />workshops to collect public opinions and suggestions, and
<br />ensured the Master Plan was reflective of, and sensitive to the
<br />community.
<br />Palmetto Bay Villogewide Drainage Improvements',
<br />Palmetto Bay, Florida
<br />Senior Inspector for this project that involved field surveying,
<br />design, permitting, bidding, and construction administration of
<br />drainage improvements at 10 locations throughout the Village.
<br />These 10 areas were identified by the Village as having
<br />flooding problems. The improvements included new drainage
<br />structures, exfiltrotion trenches, outfalls, and asphalt overlays.
<br />The project was completed on schedule and under budget.
<br />Capital Improvements Program Master Plan', Golden
<br />Beach, Florida
<br />Senior Inspector for this comprehensive Capital Improvements
<br />Program Master Plan that focuses on several major improvement
<br />areas: town -wide drainage improvements; utilities underground
<br />relocation (electrical, telephone, cable); and town -wade
<br />streetscope & traffic calming.
<br />1 ' denotes projects completed with other firms One Team. Infinite Solutions.
<br />60
<br />
|