Laserfiche WebLink
�J <br />F <br />E <br />h <br />t <br />LJ <br />I'll <br />C <br />F <br />Ht <br />I <br />H <br />I <br />_'V1I Cdr <br />�ox <br />�Qca^ <br />H <br />Geotechnical Engineer with more than 27 years of experience with transportation, <br />industrial, ports, and civil projects. His experience includes design, planning, execution <br />of new geotechnical projects and the remedial procedures to correct foundation <br />problems of existing structures, extensive involvement with axial and lateral pile <br />analyses, slope stability evaluation on retaining walls and embankment projects using <br />geosynthetic reinforcement Other specialties include design of numerous retaining <br />wags types such as mechanically stabilized earth, reinforced concrete, sheet pile <br />cantilever and anchored walls. <br />SR 8261SR 836 Palmetto Expressway /Dolphin Expressway Interchange <br />Complex/FDOT, D6 - FPID No. 249581.1.52 -01 - Miami -Dade County, Florida. <br />Design (on going) - Reconstruction of the entire interchange, including new bridges, <br />embankments, MSE walls and sign structures. Bridge foundation supported on 24- <br />inch square concrete piles. Construction (on going) - Performing dynamic pile <br />testing (PDA) for the project and providing pile lengths and driving criteria. FDOT <br />Project Manager: Ali Toghiani, P.E. - Tel: (305) 470 -5492. Role: Principal <br />Geotechnical Engineer. Design Contract Value: $2.OM. <br />Hernando R. Ramos, P.E <br />Senior Geotechnical Engineer <br />Years of Experience: <br />27 <br />Education <br />M.S. Civil Engineering -1988 <br />(Georgia Institute of Technology, Atlanta) <br />M.S. Civil Engineering -1986 <br />(Florida International University, Miami) <br />B.S. Civil Engineering -1978 <br />(University of Cartagena, Colombia) <br />Certifications: <br />Professional Engineer, Florida 42045 <br />LBR Technician -CTQP Certified <br />Reference: <br />Michael Kim, PE <br />Districts 4 & 6 Geotechnical Engineer <br />NW 25th Street Viaduct - From NW 22nd Street to SR 8261 FDOT, D 6 - FPID (954) 677 -7030 <br />No. 405665 - 3.52 -01 - Miami -Dade County, Florida. Design - Group axial and <br />lateral analysis of 24 -inch square prestressed concrete driven piles. The viaduct structure has a maximum span of 220 feet. Our <br />recommendations for minimum pile tip elevations were based on the lateral analysis. Construction - Recommended dynamic pile <br />testing (PDA) at every pier located in the canal and at every other pier located in the ground. PDA testing was conducted and <br />production pile lengths and driving criteria were presently provided. - FDOT Project Manager. Jason Chang, P.E. - Tel: (305) 470- <br />5331. - Year: 2011. Role: Principal Geotechnical Engineer. Design Contract Value: $250,000. <br />1 -95 SB Widening, from Opa -Locks Boulevard to NW 125th Street/FDOT, D6 - FPID No. 251669- 3-52 -01 - Miami -Dade <br />County, Florida. Design - Bridge widening using 3 and 3.5 -foot diameter non - redundant drilled shafts. - Construction - Evaluated <br />the results of 1 Statnamic load test and implemented results in the final design. - FDOT Project Manager: Jason Chang, P.E. - Tel: <br />(305) 470 -5331. - Year. 20042007. Role: Principal Geotechnical Engineer. Design Contract Value: $150,000. <br />SR 874/Killian Parkway Interchange, From HEFT to SW 88th Street/MDX - Task NO. 87404 - Miami -Dade County, Florida. <br />Design - Bridge over SR 874 continuous span structure with span length of 240 feet. The deck (concrete) and the steel structure <br />were built together. The project has roadway widening, MSE wags and 28,000 linear feet of noise walls. Construction - <br />Recommended dynamic pile testing (PDA) at 3 test pile locations. - Finished construction. - MDX Project Manager. Alfred Lurigados, <br />P.E. - Tel: (305) 637 -3277. - Year. 2011. Role: Principal Geotechnical Engineer. Design Contract Value: $240,000. <br />1 -95 Managed Lanes, from SR 112 to Golden Glades Interchange - FDOT, District 6. Design - construction of retaining walls, <br />sign structures, widening of the roadway embankments and bridge structures. The study also included roadway widening and MSE <br />walls. FDOT Project Manager. Jason Chang, P.E. - Tel: (305) 470 -5331. Role: Project Geotechnical Engineer. Design Contract <br />Value: $580,000. <br />SR 5/ US1- Bridge over C -III Canal - FDOT, District 6. Design - The project consists of the replacement of SR 5/ US1 Bridge over <br />Canal C -111 in Miami -Dade County, Florida. FOOT Project Manager: Jose Banera, P.E. - Tel: (305)470- 5260.. Role: Project <br />Geotechnical Engineer. Design Contract Value: $88,000. <br />NW 97th Avenue Bridge over SR 836/Miami -Dade County, Florida. Design: Performed Value Engineering. Bridge with span <br />lengths greater than 150 feet. Replaced driven piles of intermediate piers with a shallow foundation. Performed a shallow <br />foundation analysis for a single concrete footing per pier (20 ft. by 80 ft.) The end bents remained with 18 -inch square concrete <br />driven piles. <br />Construction: Performance of 2 dynamic pile testing (PDA). Provided production pile lengths and driving criteria. Finished <br />construction. Client: The Oe Moya Group. Project Manager. Armando de Moya - Tel: (305) 255 -5713. Rite: Project Geotechnical <br />Engineer. Design Contract Value: $80,000. <br />61 <br />