|
�J
<br />F
<br />E
<br />h
<br />t
<br />LJ
<br />I'll
<br />C
<br />F
<br />Ht
<br />I
<br />H
<br />I
<br />_'V1I Cdr
<br />�ox
<br />�Qca^
<br />H
<br />Geotechnical Engineer with more than 27 years of experience with transportation,
<br />industrial, ports, and civil projects. His experience includes design, planning, execution
<br />of new geotechnical projects and the remedial procedures to correct foundation
<br />problems of existing structures, extensive involvement with axial and lateral pile
<br />analyses, slope stability evaluation on retaining walls and embankment projects using
<br />geosynthetic reinforcement Other specialties include design of numerous retaining
<br />wags types such as mechanically stabilized earth, reinforced concrete, sheet pile
<br />cantilever and anchored walls.
<br />SR 8261SR 836 Palmetto Expressway /Dolphin Expressway Interchange
<br />Complex/FDOT, D6 - FPID No. 249581.1.52 -01 - Miami -Dade County, Florida.
<br />Design (on going) - Reconstruction of the entire interchange, including new bridges,
<br />embankments, MSE walls and sign structures. Bridge foundation supported on 24-
<br />inch square concrete piles. Construction (on going) - Performing dynamic pile
<br />testing (PDA) for the project and providing pile lengths and driving criteria. FDOT
<br />Project Manager: Ali Toghiani, P.E. - Tel: (305) 470 -5492. Role: Principal
<br />Geotechnical Engineer. Design Contract Value: $2.OM.
<br />Hernando R. Ramos, P.E
<br />Senior Geotechnical Engineer
<br />Years of Experience:
<br />27
<br />Education
<br />M.S. Civil Engineering -1988
<br />(Georgia Institute of Technology, Atlanta)
<br />M.S. Civil Engineering -1986
<br />(Florida International University, Miami)
<br />B.S. Civil Engineering -1978
<br />(University of Cartagena, Colombia)
<br />Certifications:
<br />Professional Engineer, Florida 42045
<br />LBR Technician -CTQP Certified
<br />Reference:
<br />Michael Kim, PE
<br />Districts 4 & 6 Geotechnical Engineer
<br />NW 25th Street Viaduct - From NW 22nd Street to SR 8261 FDOT, D 6 - FPID (954) 677 -7030
<br />No. 405665 - 3.52 -01 - Miami -Dade County, Florida. Design - Group axial and
<br />lateral analysis of 24 -inch square prestressed concrete driven piles. The viaduct structure has a maximum span of 220 feet. Our
<br />recommendations for minimum pile tip elevations were based on the lateral analysis. Construction - Recommended dynamic pile
<br />testing (PDA) at every pier located in the canal and at every other pier located in the ground. PDA testing was conducted and
<br />production pile lengths and driving criteria were presently provided. - FDOT Project Manager. Jason Chang, P.E. - Tel: (305) 470-
<br />5331. - Year: 2011. Role: Principal Geotechnical Engineer. Design Contract Value: $250,000.
<br />1 -95 SB Widening, from Opa -Locks Boulevard to NW 125th Street/FDOT, D6 - FPID No. 251669- 3-52 -01 - Miami -Dade
<br />County, Florida. Design - Bridge widening using 3 and 3.5 -foot diameter non - redundant drilled shafts. - Construction - Evaluated
<br />the results of 1 Statnamic load test and implemented results in the final design. - FDOT Project Manager: Jason Chang, P.E. - Tel:
<br />(305) 470 -5331. - Year. 20042007. Role: Principal Geotechnical Engineer. Design Contract Value: $150,000.
<br />SR 874/Killian Parkway Interchange, From HEFT to SW 88th Street/MDX - Task NO. 87404 - Miami -Dade County, Florida.
<br />Design - Bridge over SR 874 continuous span structure with span length of 240 feet. The deck (concrete) and the steel structure
<br />were built together. The project has roadway widening, MSE wags and 28,000 linear feet of noise walls. Construction -
<br />Recommended dynamic pile testing (PDA) at 3 test pile locations. - Finished construction. - MDX Project Manager. Alfred Lurigados,
<br />P.E. - Tel: (305) 637 -3277. - Year. 2011. Role: Principal Geotechnical Engineer. Design Contract Value: $240,000.
<br />1 -95 Managed Lanes, from SR 112 to Golden Glades Interchange - FDOT, District 6. Design - construction of retaining walls,
<br />sign structures, widening of the roadway embankments and bridge structures. The study also included roadway widening and MSE
<br />walls. FDOT Project Manager. Jason Chang, P.E. - Tel: (305) 470 -5331. Role: Project Geotechnical Engineer. Design Contract
<br />Value: $580,000.
<br />SR 5/ US1- Bridge over C -III Canal - FDOT, District 6. Design - The project consists of the replacement of SR 5/ US1 Bridge over
<br />Canal C -111 in Miami -Dade County, Florida. FOOT Project Manager: Jose Banera, P.E. - Tel: (305)470- 5260.. Role: Project
<br />Geotechnical Engineer. Design Contract Value: $88,000.
<br />NW 97th Avenue Bridge over SR 836/Miami -Dade County, Florida. Design: Performed Value Engineering. Bridge with span
<br />lengths greater than 150 feet. Replaced driven piles of intermediate piers with a shallow foundation. Performed a shallow
<br />foundation analysis for a single concrete footing per pier (20 ft. by 80 ft.) The end bents remained with 18 -inch square concrete
<br />driven piles.
<br />Construction: Performance of 2 dynamic pile testing (PDA). Provided production pile lengths and driving criteria. Finished
<br />construction. Client: The Oe Moya Group. Project Manager. Armando de Moya - Tel: (305) 255 -5713. Rite: Project Geotechnical
<br />Engineer. Design Contract Value: $80,000.
<br />61
<br />
|