Laserfiche WebLink
e ✓ QC Manager and Personnel including name, telephone and fax contact numbers, email address, and Training <br />Identification Number (TIN) <br />✓ Materials Testing Laboratories including names, address, contact numbers, and FDOT Laboratory Number. Multiple back- <br />up testing laboratories shall also be identified. <br />✓ Materials Suppliers for all required materials and pre - manufactured products including their name, address, contact <br />1 numbers, and FDOT Plant Number, Pit Number, or Producer Number. <br />Our Quality Program follows the Army Corp of Engineers plan. The plan described by three phases that flow through planning, <br />execution, and closeout: <br />PREPARATORY PHASE <br />• Spec and Plan review required by all disciplines. <br />• Work Plans created with Hold Points identified to measure and correct tolerances. <br />✓ Preconstruction Meetings held with key stakeholders and subcontractors to review the work plan and discuss any <br />potential risks and steps to reduce risk. Meeting minutes and attendance are recorded. <br />INITIAL PHASE <br />✓ Initial Inspections performed with key stakeholders to inspect and verify the quality of each aspect of completed work. <br />The Initial Phase Checklist is filled out with problems and corrective actions required. <br />CONSTRUCTION QUALITY ASSURANCEIQUALITY CONTROL PLAN (QAIQC) <br />The project QA/QC plan establishes the basic guidelines in which RMI / Anzac will operate during construction of this project. RMI/ <br />Anzac will provide the necessary supervision, inspection, and testing of all items of work, including that of subcontractors and <br />suppliers, to assure compliance with the plans and specifications. This will be accomplished by pre- activity meetings, a Four -Point <br />inspection Program, and quality control checklists to assure compliance with contract specifications, the City of Sunny Isles, and <br />FDOT District 6 involvement. <br />' REVIEW PROCESS AND USE OF COLORS <br />Each design submittal shall be independently and thoroughly reviewed for correctness, completeness, technical accuracy, <br />constructability and conformity with generally accepted design and engineering practice. All Quality Control Reviewers (QCR) are <br />Senior Level Engineers that are highly experienced in the particular areas of their review responsibility. In all cases the level of <br />experience and knowledge of the QCR is equal to or greater than that of the Lead Technical Professional (LTP) whose work they <br />are reviewing. <br />The RMI f Anzac / Stantec Team shall implement a well thought out and detailed design review process that insures <br />thoroughness while documenting the process. Highlights of this process include: <br />• Construction drawings check prints will be affixed with a red quality control stamp bearing the initials of the LTP and QCR <br />formally documenting the QC process through each step. <br />✓ The QCR will use RED and YELLOW while reviewing the check print in detail for items including conformance to <br />applicable standards and design criteria, technical sufficiency and mathematical accuracy, coordination with related <br />design documents and calculations. For each element found to be correct, the QCR shall highlight the check print in <br />YELLOW; for any corrections, additions, and/or deletions suggested, the QCR shall mark the check print in RED. <br />• The LTP with then back checks the QCR's marks and supervises the changes required. The LTP shall provide GREEN <br />checkmarks next to each of the QCR's red marks for which they agree that the changes are to be made and cross out <br />each of the QCR's red marks in GREEN for which changes are not to be made. The QCR must, in turn, highlight all such <br />green marks in YELLOW to signify agreement. <br />✓ The LTP supervises the correction of the original document with agreed changes. When the changes have been made, <br />each is highlighted in YELLOW by the LTP to signify that the change has been incorporated. <br />✓ The QCR verifies that the agreed upon changes indicated on the check prints have been incorporated by marking over <br />the changes with a GREEN HIGHLIGHTER. The QCR will also make certain that no inadvertent changes, not noted on <br />the check print, have been made. <br />1 72 <br />