My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® ✓ Checklists for typical design elements will also be used by the QCR's as part of the quality control process including <br />standardized in -house checklists, checklists included in the Plans Preparation Manual, and project specific checklists. <br />1 Checklists used for review of the documents will be completed and initialed by the OCR and attached to the check print or <br />copy. <br />1 CONSTRUCTION PEER REVIEW <br />M immense advantage of Design/Build projects is the opportunity for the designer and contractor to partner together in developing <br />construction documents that adhere to all City and FDOT requirements but that are also specifically tailored to the unique <br />1 strengths of the contractor. Mother major advantage of the Design/Build delivery method is the ability for the construction team to <br />review and provide input on the overall constructabikity of the proposed design. Our team has some of the most trusted and <br />respected names in the South Florida construction industry and will utilize this resource to provide constructabikity reviews on all <br />design components. Prior to any submittal to the City and I or FDOT, Phase Submittals will be provided to the designated <br />1 Construction Peer Reviewers for a oonstructability review. Their reviews help insure that design plans are of the highest quality <br />and that the proposed improvements can be constructed efficiently. <br />1 CONCLUSION <br />As we have detailed in this section of the RFP, our comprehensive CQCP encourages and promotes superior workmanship. Our <br />quality plan is carried out and audited to satisfy strict requirement and includes review and control of materials, equipment and <br />1 methods for both design and construction. <br />With our Team's extensive Design/Build experience, you can be confident that we will deliver this project as promised. Our proven <br />1 <br />QA/QC procedures have been refined and optimized in the minimal review environment of Design - Build. Our experience in the <br />past projects has taught us some valuable lessons that will be put to use to benefit this project. We are confident that we can <br />and will provide a quality product, meet schedule and control project costs. <br />1 <br />I <br />I <br />J <br />1 <br />1 <br />1 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.