My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' L N X <br />CONSTRUCTION <br />�J MANAGEMENT <br />GS2 Corporation /Sieger Suarez Architecture — Miami, FL. <br />Project Engineer <br />• High Rise Trump International Group project. Installations, close out of permitting & inspections, <br />and punch -out of building with Owners. Responsible for interior FF &E coordination. <br />1 <br />U <br />1 <br />C <br />L' <br />i <br />I <br />Superintendent <br />• 7 story mid -rise, 5 story mid -rise, Yacht Club, and multiple story 30 -40 -50 high -rise building. <br />• Responsible for layout verifications, safety meetings and coordination with OSHA, general carpentry, <br />buck hoist coordination, piling and shaft layouts, meeting minutes, submittals, shop drawings, field <br />pile cap logs, threshold inspection logs, managed all city inspections. <br />EDUCATION <br />Florida International University — August 2008 <br />Masters of Science in Construction Management — Honors 3.75 <br />University of Florida — December 1998 <br />Bachelor of Arts in Business Administration /Minor in Building Construction <br />ACHIEVEMENTS <br />• DooleyMack Team Member of the Year 2007 <br />• ABC Excellence in Construction award /Eagle Award — 2006 <br />• T &G Constructors Project Manager of the Year 2004 award <br />ADDITIONAL QUALIFICATIONS <br />• Florida General Contractors License #CGC 062058. <br />• Certified OSHA 14hr. construction safety course. <br />• Proficient in Excel, Word, PowerPoint, Primavera P6, SureTrack, Microsoft Projects, COINS, and <br />Prolog (PMS). <br />FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 19 of 66 <br />FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.