My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L IN x <br />-/ CONSTRUCTION <br />MANAGEMENT <br />George W. Skinger <br />Preconstruction Services / Estimator <br />• 30 years of experience in the Construction Industry <br />• Construction Management and Design -Build Experience <br />Pre- Construction and Estimating of the project; will be responsible for organizing bids, preparing <br />conceptual /detailed budget estimates, value engineering ideas, and scheduling <br />I have been engaged in the construction industry for 30 years, successfully overseeing all phases of <br />multimillion dollar new construction, renovations, and environmental projects for government and <br />private -sector clients. My experience includes, working with clients to develop budgets, working <br />schedules, estimating and buying -out the project. I fully negotiate and prepared written contracts <br />to all sub - contractors. Organizing and planning the weekly OAC (owner, architect & contractors) <br />meetings keeps me in complete control of the projects. In the past I have coordinated safety <br />training and planning of the asbestos /lead awareness to the subcontractor's staff for several <br />projects. By supervising the assistant project managers, clerk of the work, and project <br />superintendents during construction I have developed an effective control of the job schedule and <br />the quality of the scope of work. I continuously close -out all projects on time, and on budget, <br />meeting the highest quality standards. <br />KEY SKILLS <br />— Commercial Construction /Demolition — Site Safety /OSHA Compliance — Budgeting & Cost Controls <br />— Site Work Improvement Engineering — QA /QC /Field Engineering —Bidding/Estimating/Proposals <br />— Certified Payroll Documentation —Change Order Management — Scheduling /CPM /Resources <br />— Computer Programs (Office 2010,surtrack, expedition, pro estimator, etc. ) — MSDS/ASTM/ASTRE <br />— ADA Requirements and Compliance — Asbestos /Lead Remediation — Contamination Remediation <br />— LEED Green Associate Training <br />1 EMPLOYER SUMMARY <br />LYNX CONSTRUCTION MANAGEMENT, LLC (Coral Gables, FL) — Estimator <br />Provide Pre - Construction services including but not limited to complete estimates and scheduling for <br />majority of bids the company provides proposals for. <br />CONSULTANT, SMALL BUSINESS OWNER (Miami, FL) — Indenendent Consultant <br />Provide estimating and project management services. <br />MAX SOUTH CONSTRUCTION INC (N. Miami, FL) — Senior Proiect Manager /Estimator <br />Provided completed estimates for majority of bids the company provided proposals for (won or lost). Served <br />as Owners Representative to several clients, reviewed all contract documents and payment requisitions <br />through completion of project. Processed and developed all documents required for state and local <br />agencies, including building & /or fire department approval. Supervised & managed numerous new <br />construction projects from $500K to $15M. Provided project leads and jobs through business & personal <br />contacts from my network of associates. Served as Safety & Health Officer on larger projects & assisted <br />when OSHA inspections happened. I was in direct privy to the owner(CEO) in most of the major events of <br />company operations for the past 10 years. <br />11: CGC15184U M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 20 of 66 <br />FL CMC1250004 NC:69344 O: 305.523.3656 I F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.