My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tCONSTRUCTION <br />MANAGEMENT <br />Paul A. Zilio, PE <br />BNI, Civil Engineer <br />Paul worked in a variety of roles for a major general contractor and became a Certified General <br />Contractor prior to joining BNI. Since joining BNI, Paul has worked on a number of design -build <br />projects and often served as Threshold Inspector. These experiences have given Paul a unique <br />insight into partnering and the value of good and timely communication and have helped lead BNI <br />to recommendations by a number of contractors. <br />Paul has designed a variety of structural systems, including cast -in -place concrete, composite <br />precast concrete, tilt -up concrete, and structural steel. He works closely with designers and <br />builders, regardless of delivery method, to make structural decisions that balance aesthetics, <br />constructability, cost and schedule. <br />Relevant Projects <br />(Terminal Wide People Mover System) Skyride at Miami International Airport, Miami, Florida <br />• Elevated covered pedestrian bridges totaling 3500 feet, connecting all passenger concourses <br />and parking garages. <br />• Threshold Inspector Representative <br />Tri -Rail Station, Pompano Beach, Florida <br />• This major upgrade to the Pompano Beach Tri -Rail Station includes two 25' x 400' platforms on grade <br />with canopies for the northbound and southbound stations, with stairs and elevators, and a <br />pedestrian overpass /overhead walkway. <br />• Principal In Charge, Engineer of Record, Project Manager <br />Broward County Judicial Complex, Fort Lauderdale, Florida <br />• Two Six -Story, 349,000 -SF Office and Courtroom Wings <br />• Three Pedestrian Bridges designed with structural steel spanning 125 -ft to 189 -ft <br />• Project Engineer <br />Westland Hialeah High School, Hialeah, Florida (Design - Build) <br />• New 1694 - student high school, 322,084 -SF consisting of four buildings. <br />• Principal in Charge, Engineer of Record <br />Jorge Mas Canosa Middle School, Miami, Florida (Design - Build) <br />1 • 2232- student station middle school. <br />• Principal -in- charge, Engineer of Record, Project Manager <br />Norma Butler Miller Elementary, Miami, Florida (Design - Build) <br />• 1068 - student elementary school. <br />B• Principal -in- charge, Engineer of Record, Project Manager <br />B FL: CGC1519494 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 27 of 66 <br />FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.