My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N X <br />-/CONSTRUCTION <br />MANAGEMENT <br />Ernesto Aloma, PE <br />SDM, Electrical Engineer <br />• 22 years of experience in Electrical Engineering <br />• Licensed Professional Engineer <br />• Principal in charge of the Firm's design decisions <br />Licenses and Certifications <br />State of Florida Professional Engineer PE 53823 <br />Experience <br />Vice President of SDM Consulting Engineers, Inc. <br />Principal in charge of the Firm's design decisions. Responsible for ensuring the utmost level of <br />quality for the various design components of all projects. <br />Education <br />BSEE 1991, Bachelor of Science in Electrical Engineering, Florida International University <br />Professional Organizations <br />IEEE Institute of Electrical & Electronic Engineers <br />NSPE National Society of Professional Engineers <br />Relevant Experience <br />MIC Earlington Heights Connector <br />Mr. Aloma was the Project Manager for the M /E /P design of this project involving a connector <br />between the Miami Intermodal Center (MIC) and the Earlington Heights Metrorail Station (EHT) for <br />the improvement of the existing transportation system by providing a transit connection to Miami <br />International Airport. <br />MIA Regional Commuter Facility <br />Mr. Aloma was the Project Manager for the M /E /P /FP design of this 68,000 square foot commuter <br />facility for American Airlines at Miami International Airport. The scope of work involves a new 3- <br />story addition, contiguous with and extending the existing North Terminal Concourse. This work <br />will include a new covered walkway to extend from the concourse to access small commuter <br />planes. <br />MIA Automated People Mover (APM) Maintenance and Storage Facility <br />Mr. Aloma was the Engineer responsible for overseeing all aspects of the M /E /P /FP design of this <br />APM maintenance and storage facility and main control room for said train system. This project <br />includes the interior finish -out of approximately 87,000 sf of shell space and housing for the <br />operation, maintenance, and service systems associated with APM vehicles, passenger stations and <br />interface systems in general. <br />FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 29 of 66 <br />FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.