Laserfiche WebLink
k <br />II <br />[I I <br />I <br />11 <br />I <br />LJ <br />I <br />1 <br />1 <br />I <br />u <br />Mn ONSTRUCTION <br />MANAGEMENT <br />Miami -Dade County Parks & Recreation - Miami Southridge Stadium <br />Mr. Aloma was one of the Electrical Engineers for the M /E /P /FP Engineering Design and <br />Construction Administration Services of this project which includes a 1,500 seat stadium facility <br />consisting of a concession stand, restrooms, pedestrian access and circulation, ticketing and <br />admissions area, and full handicap accessibility to the entire complex. <br />City of Miramar - Vizcaya Park Community Center (LEED) <br />Mr. Aloma was one of the Electrical Engineers for this 7,660 gsf single story Community Center <br />building. This facility will include spaces for recreation, computer education /activity, gaming, park <br />concessions, an office, and other support functions. <br />City of South Miami - Murray Park Multipurpose Center, Phase 2 <br />Mr. Aloma participated in the Electrical Engineering design on this project involving a two -story <br />building of approximately 23,000 gsf which will house a multi - purpose program comprised of a <br />gymnasium, office /classroom space, toilet rooms and support space, a parking lot, pedestrian <br />walkways and related water, fire and sewer site utilities. <br />Town of Miami Lakes — Royal Oaks Park Community Center <br />(Certified GOLD Rated LEED Project) <br />Mr. Aloma participated in the Electrical Engineering design of this project involving single -story <br />building of approximately 8,200 gsf Design -Build Municipal Community Center. <br />FL: CGC1119494 Ms: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 30 of 66 <br />FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />