Laserfiche WebLink
L ON�AG X <br />CSTRUCTION <br />oo <br />MANAGEMENT <br />Jose I. Martinez, P.E., LEED AP <br />SDM, Mechanical Engineer <br />• 19 years of experience in Mechanical Engineering <br />• Licensed Professional Mechanical Engineer <br />Licenses and Certifications <br />State of Florida Professional Engineer PE 53779 <br />Experience <br />Principal - SDM Consulting Engineers, Inc. <br />Associate in charge of the Mechanical Engineering Systems Design and Construction Management <br />Services overseeing the implementation of the intended design of the various engineering systems <br />into the building. <br />Education <br />BSEE 1994, Bachelor of Science in Mechanical Engineering, Florida International University <br />Professional Organizations <br />ASME (American Society of Mechanical Engineers) <br />ASHRAE (American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc.) <br />Green Building Certification Institute - LEED Accredited Professional Since 2009 <br />SAVE International <br />Relevant Experience <br />MIC Earlington Heights Connector <br />Mr. Martinez was the Lead Mechanical Engineer for the Mechanical design of this project involving <br />a connector between the Miami Intermodal Center (MIC) and the Earlington Heights Metrorail <br />Station (EHT) for the improvement of the existing transportation system by providing a transit <br />connection to Miami International Airport. <br />' MIA Regional Commuter Facility <br />Mr. Martinez was the Lead Mechanical Engineer for the Mechanical design of this 68,000 square <br />foot commuter facility for American Airlines at Miami International Airport. The scope of work <br />involves a new 3 -story addition, contiguous with and extending the existing North Terminal <br />Concourse. This work will include a new covered walkway to extend from the concourse to access <br />small commuter planes. <br />MIA Automated People Mover (APM) Maintenance and Storage Facility <br />Mr. Martinez was the Lead Mechanical Engineer responsible for overseeing all aspects of the <br />Mechanical design for this APM maintenance and storage facility and main control room for said <br />train system. This project includes the interior finish -out of approximately 87,000 sf of shell space <br />' and housing for the operation, maintenance, and service systems associated with APM vehicles, <br />passenger stations and interface systems in general. <br />11: CGC1518494 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 33 of 66 <br />FL CMC12S0004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />