My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L N x <br />CONSTRUCTION <br />MANAGEMENT <br />Lynx construction staff are fully experienced interacting with the local environment <br />' including the authorities having jurisdiction such as building departments, FDOT, DERM, <br />Fire and others. They are completely able to effectively move the project forward no <br />matter what is encountered. We are familiar with working in the high density urban <br />1 environment, and with expected site conditions such as local soil conditions, the challenging <br />and changing weather and how to deal with hurricane season. <br />1 <br />L <br />1 <br />1 <br />• Safety, our first priority <br />Our onsite staff will ensure that the public and construction workers are safe and that the <br />site is kept fenced, with proper signage, proper protection and most debris and other safety <br />hazards are dealt with immediately. Project staff is OSHA 30 certified. MOT and pedestrian <br />traffic are of critical importance. <br />• Ready for use when Gateway park is complete <br />Our project will be completed in concert with the adjacent Gateway Park project and will be <br />ready before the park and facilities are ready. <br />Quality control <br />Quality control is integrated into the entire project. The pre- design, pre - construction, <br />commissioning and close out phases offer milestones to measure and report on quality control <br />issues. However Lynx does not expect issues to arise since quality control is part of the daily activity <br />of the staff. <br />FL: CGC15184M M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 42 of 66 <br />FL:CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstructionManagement.com RFQ#13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.