Laserfiche WebLink
L N X <br />—/CONSTRUCTION <br />MANAGEMENT <br />• Budget estimating <br />Our estimator updates the budgets as the design development unfolds and shares the <br />information to help the team make the best decisions in order to implement the owner's <br />design goals. When the final construction documents are finished the final bids are taken <br />and the project total cost is determined. <br />IS Value engineering and cost benefit analysis <br />Lynx implements true value engineering by ensuring that the major goals of the project are <br />met when suggesting alternatives. The owner is involved in the decisions as to which <br />alternates and options are selected and which construction techniques or materials will <br />result in a "best value" for the owner. <br />• Constructability Analysis <br />During the process of design, the focus is on the construction means and methods as well as <br />the materials available to provide the most effective process. Structural systems <br />construction, availability of major components, mechanical and conveying systems <br />availability and suitability, building envelope, roofing and finishes are reviewed to make <br />sure that the project can be efficiently built on -time and in- budget. <br />Construction Phase <br />Lynx Construction provides expert management of the construction phase of the project from <br />ground breaking until occupancy. Our staff is led by Chris Moran, President, who will maintain <br />direct daily knowledge of the erection of the structures and completion of the buildings and direct <br />involvement with the Owners. Mr. Moran has over 30 years of construction experience and has <br />successfully completed all types of projects from underground to entire campuses comprised of <br />many buildings. His experience includes over One Billion Dollars of construction in the Miami area. <br />He provides the leadership to a team of fully experienced project managers and site <br />superintendents familiar with the types of construction and systems which will make -up the <br />' project. <br />• Onsite expertise <br />Lynx will provide expert staff on the site during every day of construction operations. The <br />staff will include a senior superintendent, superintendents, assistant project managers and <br />project managers. The quality of our site supervision is responsible for our 100 percent <br />success rate of completing projects on -time and within budget. <br />• Project managers <br />Our project management team is second to none. The senior project manager assigned to <br />this job has both a Bachelor and Master's degree and over 15 years of experience in the <br />local market. He has built many difficult projects at facilities that impact major institutions, <br />transportation facilities and road ways where service cannot be interrupted. <br />Knowledge of local conditions <br />1 FL CGC1518494 Ms: 18124 -Mc 45 Almeria Avenue I Coral Gables, Florida 33134 Page 41 of 66 <br />FL: CMC1250004 NC: 69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />