Laserfiche WebLink
Commission on March 21, 2013. The design has been completed and the project <br />advertised for construction bids. In order to implement this project construction <br />phase services in the amount of $24,950.00 was submitted for administrative <br />approval. <br />CES Consultants, Inc. - $6,275.00 includes: <br />Geotechnical investigations, laboratory evaluation and engineering analysis and <br />report for soils conditions on the Intracoastal Park for decorative column pile <br />design by others in the amount of $3,450.00. <br />Additional geotechnical investigation, laboratory evaluation and engineering <br />analysis and report for percolation rates on the Intracoastal Park in support of <br />drainage design by others in the amount of $2,825.00. <br />Bermello Ajamil & Partners, Inc: <br />Since professional services were approved by City Commission that in total <br />exceeded $100,000 no additional services were authorized FY 2012/2013. <br />Calvin Giordano & Associates - $31,318.25 and includes <br />Engineering services in the amount of $5,675.25 related to utility service line <br />design, permitting and installation at the Public Works modular under the <br />Lehman Causeway. <br />Preparation of an Elevation Certificate the amount of $625.00 for the Public <br />Modular under the Lehman Causeway as required by Florida Building <br />Code. <br />Engineering services in the amount of $6,373.50 for electrical and lighting design <br />for area lighting at Gwen Margolis Park for installation by the contractor installing <br />artificial turf. <br />Land surveying services in the amount of $5,027.50 for the preparation of a route <br />survey in support of the solid wall under the Lehman Causeway. <br />Land surveying services in the amount of $2,441.25 to prepare legal descriptions <br />and sketches for temporary construction easements to facilitate the construction <br />of the solid wall under the Lehman Causeway. <br />Engineering services in the amount of $2,037.00 to evaluate before and after <br />lighting levels resulting from the construction of the solid wall under the Lehman <br />Causeway. <br />Field Inspection, Construction Administration and Closeout services in the <br />amount of $5,801.25 for the utility line installation from Collins Avenue to the pier <br />project. <br />Agenda Item No. 101 <br />Date 11212013 <br />174 <br />