My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2178
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:34:08 PM
Creation date
1/23/2014 10:18:40 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2178
Date (mm/dd/yyyy)
01/16/2014
Description
Agmt w/Craig A. Smith for Designing Srvs for Reconstruction of 174 St. Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preview <br />s; do J <br />TO: <br />VIA: <br />FROM: <br />DATE: <br />RE: <br />Page I of 2 <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947 -0606 City Hall <br />(305) 949 -3113 Fax <br />MEMORANDUM <br />The Honorable Mayor and City Commission <br />Christopher J. Russo, City Manager <br />Helen Gray, PE, City Engineer <br />1/16/2014 <br />A Resolution and Agreement with Craig A. Smith & Associates for <br />Professional Services for the 174 Street Drainage Project <br />RECOMMENDATION: <br />We recommend City Commission approve the resolution. <br />REASONS: <br />The adopted City budget previously included a capital project to construct <br />drainage improvements on 174 Street from Collins Avenue to approximately the <br />west side of the Winston 600 Building. Given extensive deterioration of the <br />roadway, in the FY 13/14 budget, City Commission approved expanding the <br />project to include reconstructing substantial portions of the roadway in addition to <br />constructing new drainage infrastructure. To implement this project, additional <br />professional engineering services are needed and are detailed in the contract. <br />Not included in this contract are possible future construction phase services that <br />may include on -site field observation and inspections, project management and <br />construction contract support services, and certification of the project as will be <br />required by various permitting agencies. In addition, Luke's - Sawgrass Landscape <br />will be preparing revised landscaping schemes for future City consideration and <br />eventual implementation. <br />COST: <br />http: / /sibagenda.sibfl. net / Agenda / Preview. aspx ?ItemID =I 220 &MeetingID= 0 &MeetingDa... 1/10/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.