My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2195
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:38:41 PM
Creation date
2/25/2014 3:51:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2195
Date (mm/dd/yyyy)
02/20/2014
Description
3rd Amd to Agmt w/Calvin Giordano for Final Design & Permitting Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Schematic landscape plans nor construction documents are not included. <br />D. One (1) City Staff Meeting and one (1) Community Meeting are included. <br />E. One (1) round of minor revisions are included. <br />IV. Professional Government Consulting Services & Sub Consultants <br />A. Work in conjunction with Joel Wadsworth of Construction Department to manage <br />the environmental, utility and building department permits. <br />1. Manage EAS (Sub - Consultant) to obtain the following environmental <br />permits or approvals: PERA (F.K.A. DERM), USACE & USCG. <br />This includes application, responses to all RAI, mitigation <br />designs (after obtaining potential City owned land information <br />from City staff), and permit sketches. <br />B. Manage the completion of all outstanding drawings being performed by CGA <br />departments: <br />1. Civil/Drainage Plans <br />2. Electrical/Lighting <br />I Pavement Marking & Signage Plans <br />C. Manage the completion of the structural plans which are to be completed by others. <br />The scope for the completion of the structural plans is outlined in BHA's proposal. <br />D. Attend one (1) public meeting to address adjacent property owner concerns. <br />E. Utility Location and Coordination <br />1, Send correspondence to all utilities requesting utility locations and as- <br />builts. <br />2. Utilize a subcontractor to perform utility location with ground <br />penetrating radar. <br />
The URL can be used to link to this page
Your browser does not support the video tag.