My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2195
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:38:41 PM
Creation date
2/25/2014 3:51:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2195
Date (mm/dd/yyyy)
02/20/2014
Description
3rd Amd to Agmt w/Calvin Giordano for Final Design & Permitting Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
design shape. <br />5. Scour Analysis: Sub consultant will perform a scour analysis for the <br />proposed bridge, based on pier geometry, peak hydraulic flow rates for <br />the canal determined under Part G.3, and local geotechnical conditions. <br />The scour analysis will be in accordance with the Florida Department <br />of Transportation (FDOT) and Federal Highway Administration <br />(FHWA) guidelines. The scour calculations shall include contraction <br />scour due to the overall presence of the bridge and associated <br />constriction of flow in the canal, as well as local scour occurring at the <br />individual pier foundations. <br />6. Engineering Report: Sub consultant will prepare an engineering report <br />documenting the results of the field investigations and engineering <br />analyses performed under Parts G.1 through G.5. Figures illustrating <br />the results will be incorporated within the report, including a plot of <br />the estimated scour conditions. The report will be signed and sealed by <br />a Florida licensed registered professional engineer. <br />H. Structural Engineer (Sub Consultant) <br />1. Structural Engineer to provide complete, signed & sealed plans for the <br />bridge span and support structures. <br />2. Structural Engineer to provide complete, signed & sealed plans for the <br />Mechanically Stabilized Earth (MSE) Wall Control Drawings. <br />3. Structural Engineer to provide signed & sealed plans for the partial <br />demolition and reconstruction of the existing seawall. <br />4. Structural Engineer to respond to all Agencies Having Jurisdiction <br />(AHJ) Request for Interpretation/Information (RFI) to facilitate <br />environmental and utility permitting which pertain to structural issues. <br />5. Geotechnical Engineer to mobilize equipment to perform three (3) <br />borings in the canal. <br />6. Geotechnical Engineer to study and prepare report for the settlement of <br />the MSE walls due to presence of organic soils. <br />
The URL can be used to link to this page
Your browser does not support the video tag.