My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2195
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:38:41 PM
Creation date
2/25/2014 3:51:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2195
Date (mm/dd/yyyy)
02/20/2014
Description
3rd Amd to Agmt w/Calvin Giordano for Final Design & Permitting Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sub Consultants <br />Sub Consultant — Utility Location — Ground Radar <br />$200.00 20 <br />$4,000.00 <br />Sub Consultant EAS — Environmental Permitting <br />$200.00 450 <br />$90,000.00 <br />Sub Consultant BHA — Geotech Analysis for MSE Wall <br />$8,591.07 1 <br />$8,591.07 <br />Sub Consultant BHA — Structural Responses to AHJ RFIs <br />. $16,021.53 1 <br />$16,021.53 <br />Sub Consultant C &C- Hydraulic Analysis <br />$23,475.00 1 <br />$23,475.00 <br />Sub Consultant BHA — Geotechnical — 3 Addlt Borings <br />$43,225.49 1 <br />$43,225.49 <br />Sub Consultant BHA — Demo & Recon Seawall Dwgs <br />$46,083.78 1 <br />$46,083,78 <br />Sub Consultant BHA — MSE Control Wall Drawings <br />$53,947.59 1 <br />$53,947.59 <br />Sub Consultant BHA — Structural Plans <br />$95,249.54 1 <br />$95,249.54 <br />LABOR SUBTOTAL <br />REIMBURSABLE SUBTOTAL <br />TOTAL <br />Reviewed by: <br />Alan Cohen, City Manager <br />$555,094.00 <br />$563,874.00 <br />$7,500.00 <br />$562,594.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.