My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A - AV Overview and Scope of Work
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Appendix A - AV Overview and Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:45:25 AM
Creation date
1/31/2019 11:45:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />157. Secured AV closet shall contain 2 floor standing racks with audio-visual equipment for <br />Fitness Center 108, Large Classroom 109, Cooking Classroom 111, Catering Kitchen 112 and <br />Banquet Hall 117. Fitness Center and Large Classroom systems shall each be standalone type. <br />Cooking Classroom, Catering Kitchen and Banquet Hall systems shall be interconnected. Racks <br />shall be ganged together and equipped with wheels to allow for ease of servicing in the future. <br />All cables going to and from of the racks except for power surge supply cords shall be bundled <br />and dressed together and placed inside the Techflex tubing with a minimum of 8' cable service <br />loop. <br />158. Prior racks assembly, AV integrator shall provide proposed rack elevations to the City in <br />writing for approval. City reserves right to make changes and influence the final elevations of <br />the rack equipment. <br />159. AV racks shall also contain 32 -port managed POE LAN switch provided by the City of <br />Sunny Isles Beach to allow for required audio-visual networking connections. Network switch <br />shall be installed and wired by the AV integrator, but its LAN setup shall be done by the City's IT <br />staff. <br />North-East Covered Patio <br />160. AV integrator shall install 6 white wall mounted outdoor speakers in total (4 evenly <br />spread across the Banquet Hall East side above the glass windows and 2 in the corners above <br />the North entrance glass doors). <br />161. All speakers shall be tapped to their highest 70V wattage. <br />162. All speakers shall feature security hardware installed. <br />163. Speakers shall be powered by the 70V power amplifier (shared with 2 subwoofers) <br />located inside the AV closet 119. <br />164. This audio zone shall be independently controlled via Crestron control touch screen at <br />the AV rack or iPad. <br />165. Any AV source including all microphones shall be routable to the covered patio zone. <br />166. All necessary conduit for the outdoor speakers shall be provided by the GC/EC. <br />14 <br />Appendix A - AV Overview and Scope of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.