My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix C - AV Equipment Cut Sheets
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Appendix C - AV Equipment Cut Sheets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:54:03 AM
Creation date
1/31/2019 11:45:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br />CUTTING DRYWALL OPENING FOR THE BOX (IF NECESSARY, CONTINUED) <br />4. Use the back of the box as a template to draw lines along tops and sides. Align the box to the <br /> lower corner (where the stud meets the horizontal line) and use a level on the top of the box to ensure <br /> correct alignment when drawing lines. <br />NOTE: A larger opening may be necessary to accomodate conduit connectors (not provided) grommets, <br />and the included F7526-V1 duplex outlet power kit when attached to the box. <br />5. Use a utility knife to cut the opening for your box and carefully remove the drywall. <br />NOTE: The trim ring provides 5/16” coverage around the opening and may be used to hide minor drywall <br />blemishes. (FIGURE A) <br />FIGURE A <br />5/16” <br />5/16” <br />1. Remove (4x) trim screws (B) to take the trim ring off the box as shown. (FIGURE B) <br />REMOVING THE TRIM RING <br />FIGURE B <br />B
The URL can be used to link to this page
Your browser does not support the video tag.