Laserfiche WebLink
1. Use a hammer to knock out the top cable holes required to accommodate the devices you plan on <br /> installing in the box. (FIGURE C) <br />2. Prepare all signal cables for passing through knockouts when mounting the box to the wall studs. <br />NOTE: Any punched openings not in use must be sealed with a suitable plug. Covers or panels that are <br />removed must be replaced and secured. <br />1. Use a hammer to knock out the electrical box rectangles and the hole to accommodate your power <br />needs for the devices you plan on installing in the box. (FIGURE D) <br />2. Prepare all power cables for passing through knockouts when mounting the box to the wall studs. <br />NOTE: Any punched openings not in use must be sealed with a suitable plug. Covers or panels that are <br />removed must be replaced and secured. <br />Page 7 <br />CABLING THROUGH THE TOP OF THE BOX <br />RUNNING POWER TO THE BOTTOM OF THE BOX <br />FIGURE D <br />FIGURE C <br /> <br />WARNING: All wiring should be installed by a licensed electrician following all local codes and <br />ordinances. <br />AVERTISSEMENT: Tout le câblage doit être installé par un électricien agréé suivant tous les <br />codes et règlements locaux. <br /> <br />WARNING: All wiring should be installed by a licensed electrician following all local codes and <br />ordinances. <br />AVERTISSEMENT: Tout le câblage doit être installé par un électricien agréé suivant tous les <br />codes et règlements locaux.