My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix C - AV Equipment Cut Sheets
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Appendix C - AV Equipment Cut Sheets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:54:03 AM
Creation date
1/31/2019 11:45:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 <br />MOUTNING THE BOX TO WALL STUDS <br />1. Set the box between the wall studs through the drywall (if applicable). (FIGURE E) <br />2. Feed any cabling through their corresponding knockouts on the box. <br />3. Use a 1/4” bit to drill pilot holes through the mounting holes from the inside of the box, if desired. <br />4. Mount the box to the studs using (4x) #10 x 1 1/2” (minumum size) wood screws and (4x) #10 <br /> washers (screws and washers not provided) through the mounting holes from the inside of the box. <br /> (FIGURE F) <br />FIGURE F <br />FIGURE E <br />Mounting <br />Holes
The URL can be used to link to this page
Your browser does not support the video tag.