My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 12:17:26 PM
Creation date
1/31/2019 11:58:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />EXECUTION <br />01 73 00 - 3 <br /> <br /> <br />1. Examine roughing-in for mechanical and electrical systems to verify actual <br />locations of connections before equipment and fixture installation. <br />2. Examine walls, floors, and roofs for suitable conditions where products and <br />systems are to be installed. <br />3. Verify compatibility with and suitability of substrates, including compatibility <br />with existing finishes or primers. <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />Proceeding with the Work indicates acceptance of surfaces and conditions. <br />3.2 PREPARATION <br />A. Existing Utility Information: Furnish information to Owner that is necessary to <br />adjust, move, or relocate existing utility services located in or affected by <br />construction. Coordinate with authorities having jurisdiction. <br />B. Field Measurements: Take field measurements as required to fit the Work properly. <br />Recheck measurements before installing each product. Where portions of the Work <br />are indicated to fit to other construction, verify dimensions of other construction by <br />field measurements before fabrication. Coordinate fabrication schedule with <br />construction progress to avoid delaying the Work. <br />C. Space Requirements: Verify space requirements and dimensions of items shown <br />diagrammatically on Drawings. <br />D. Review of Contract Documents and Field Conditions: Immediately on discovery of <br />the need for clarification of the Contract Documents caused by differing field <br />conditions outside the control of Contractor, submit a request for information to <br />Architect according to requirements in Section 01 31 00 "Project Management and <br />Coordination." <br />3.3 CONSTRUCTION LAYOUT <br />A. Verification: Before proceeding to lay out the Work, verify layout in formation shown <br />on Drawings, in relation to the property survey and existing benchmarks. If <br />discrepancies are discovered, notify Architect promptly. <br />B. General: <br />1. Establish limits on use of Project site. <br />2. Establish dimensions within tolerances indicated. Do not scale Drawings to <br />obtain required dimensions. <br />3. Inform installers of lines and levels to which they must comply. <br />4. Check the location, level and plumb, of every major element as the Work <br />progresses. <br />5. Notify Architect when deviations from required lines and levels exceed <br />allowable tolerances.
The URL can be used to link to this page
Your browser does not support the video tag.